Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Structural and Lithological Controls on the Location of Orebodies in the Baizhangzi Lode Gold Deposit in Western Liaoning Province, China

    By L Xiong, W J Shi, J H. Wei

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baizhangzi gold deposit is located in the northern North China Craton. The structural a

    Mar 18, 2015

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learned

    By A Castillo, K Wiese, L Panduro Robles

    For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr

    Aug 24, 2022

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Research on in situ recovery technology of hot-dip galvanised dross

    By X Li, R Chu, X Deng

    The hot-dip galvanising industry is the largest consumer of zinc, with over 40 per cent of the world’s total annual production of zinc used for galvanised steel. The dross generated in the hot-dip gal

    Jun 19, 2024

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    Gold in Greywacke in Anticlinal Crests - GIGIACS - In the Pine Creek Geosyncline

    By J W Shields

    The aim of this paper is to present a concept or model regarding a particular geological environment where gold orebodies occur in the Pine Creek Geosyncline and indeed in many other pans of the wor

    Jan 1, 1994

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia

    By E Hernandez, I Agustian, W Kusumohastuti

    PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi

    Mar 24, 2014

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Business Environment 2010

    The global recession of the 1980s drove commodity prices down and intensified cost competition. The 1990s saw a restructuring of the mining industry with the survivors adopting new technology, signi

    Jan 1, 1995

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine

    By N Petropoulos and M J Thurley, E Righetti, M Wimmer

    Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra

    Aug 24, 2015

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021