Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011

  • AUSIMM
    Mining and Exploration on the Palmer River

    The Palmer River rises in the Windsor Tablelands area of the Paleozoic Hodgkinson Basin, 110 kilometres northwest of Cairns. It flows west across the Palmerville Fault and Proterozoic Dargalong Metamo

    Jan 1, 1986

  • AUSIMM
    Reduction in Diesel Particulate Matter at Oaky North

    By A Melloy, D Holt, M Jurak

    Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising

    Jul 1, 2013

  • AUSIMM
    An investigative study on the interfacial behaviour of waste graphite resource with liquid iron

    By S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani

    Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati

    Jun 19, 2024

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Current Issues in the Mining Industry - From the Operational Mineral ProcessorÆs Perspective

    By S Schwarz, D Alexander

    The mining industry, and in fact the world, has undergone significant changes in the past five to ten years, ranging from the metals boom, the global financial crisis and the rise and fall of national

    Oct 29, 2012

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Are there differences in size distribution when comparing conventional crushing and HPGR?

    By I Ritchie, G Lane, C Morley, D Yataco

    Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching

    Sep 11, 2017

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Use of Metallurgical Test Data in Resource Evaluation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Jul 11, 2011

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    Modelling Blast Movement for Grade Control

    By O Handayani, R Barr, E Isaaks

    The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los

    Aug 18, 2014

  • AUSIMM
    Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?

    By J D. Illescas, S N. Arnold, D R. Shaw

    Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree

    Oct 29, 2012

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021