Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL processBy J Coveney, A Rich, D Grimsey, J Wood, S Creedy
In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili
Aug 21, 2024
-
Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamationBy G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott
Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav
Aug 2, 2023
-
In Plant Sampling for Gravity Recoverable Gold - ABSTRACT ONLYThe implementation of robust, reliable and accurate sampling systems is the key to the successful management of any mineral processing plant. The representative sampling of a mineral processing plant
Aug 1, 2010
-
Environmental Variables at Bauxite MineBy A Romanel, M S. Kato, M P. Piermatei, P Artioli
"Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi
Jul 10, 2012
-
Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?By C Pope, M Tannock
Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m
Jul 13, 2015
-
Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, AlaskaBy Caivin JS, Freeman CJ
The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton
Jan 1, 1987
-
A review of dynamic energy-absorbing cable boltsBy P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag
High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s
Nov 29, 2022
-
Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?By S O’Connell, M Scholz, A Robertson, M L. Bloss
The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan
Jun 22, 2016
-
Dredger drop impact on slope stability – Hazelwood MineBy J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and StructuresBy L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Metallurgical test work – between a rock and a hard placeBy K Fiedler, A Newell, P D. Munro
Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and
Aug 29, 2018
-
Supervisors and Teams at WorkBy T G. Neville, G Terrey, J Burns
This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica
Jun 22, 2016
-
Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality ManagementBy F I. Cox, D Peeler, T Bodisco
"Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in
Mar 24, 2014
-
Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in ConcentrateBy M Spagnolo, M Ashley, D, L Reemeyer
PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in
Jan 1, 2003
-
Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case StudyBy A Campbell
Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en
Nov 8, 2011
-
Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible InformationBy C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan
In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder
Jul 16, 2014
-
Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old ConceptBy C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie
"Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass
Jun 15, 2016