Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL process

    By J Coveney, A Rich, D Grimsey, J Wood, S Creedy

    In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili

    Aug 21, 2024

  • AUSIMM
    Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamation

    By G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott

    Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav

    Aug 2, 2023

  • AUSIMM
    In Plant Sampling for Gravity Recoverable Gold - ABSTRACT ONLY

    The implementation of robust, reliable and accurate sampling systems is the key to the successful management of any mineral processing plant. The representative sampling of a mineral processing plant

    Aug 1, 2010

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, Alaska

    By Caivin JS, Freeman CJ

    The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton

    Jan 1, 1987

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    New Blasting Initiation Technologies in the Mining Industry

    Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based

    Jan 1, 2005

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    Supervisors and Teams at Work

    By T G. Neville, G Terrey, J Burns

    This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica

    Jun 22, 2016

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible Information

    By C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan

    In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder

    Jul 16, 2014

  • AUSIMM
    Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept

    By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie

    "Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass

    Jun 15, 2016