Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Adapting to Geotechnical Change – a Case Study of the Carina Open Pit MineBy R Jaine, D Strang, M Fowler
"This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k
Nov 15, 2016
-
Improving Safety and Production – The Transition to Electronic Detonators at George Fisher MineBy M Breen
In 2009, George Fisher mine began to seriously consider the transition from pyrotechnic detonators to electronic detonators. Initially, the electronic detonators were used for complex crown shots or a
Nov 8, 2011
-
"Proposed Methodology for Utilising Automated Core Logging Technology to Extract Geotechnical Index Parameters"By R Berry, J Lett, C L. Harraden
"In the past decade, increased processing capacity combined with precision robotics in high resolution spectrometers has resulted in a new generation of high-speed hyperspectral core logging systems.
Jun 15, 2016
-
Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons LearntBy R Jacobs, J Yeates
"The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat
Mar 8, 2016
-
Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil DumpBy Walton S, Wheeler D. J, Sargent D. M, Ting L. Y
Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and
Jan 1, 1992
-
The Application of AS 61508 to Road Tunnel Fire and Life Safety SystemsBy M Taylor
The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf
Mar 8, 2011
-
From Sublevel Stoping to Sublevel Caving at Rana Gruber, Norway – Rock Mechanical AspectsBy A M. Myrvang, B Nøst, N Q. Trinh, I S. B Bergh
The iron ore producer Rana Gruber AS is situated in northern Norway just below the Arctic Circle, and has been producing hematite and magnetite concentrates for more than 60 years. Since the late 1990
Nov 5, 2014
-
The golden thread of waste characterisation from exploration drilling to waste rock placementBy M Bettison, R Marton, R Wright, M Lowry
Depending on the geological setting, waste rock from mining can present risks to achieving acceptable closure outcomes. In the Pilbara iron ore mines, the majority of waste rock is geochemically inert
Jul 25, 2018
-
Reply to Contributed Discussion (this issue) by John Shepher and L. Keith RixonBy ALAN J. HARGRAVES
It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec
Jan 1, 1983
-
Theory of Sampling – from missing link to key enabler for process analytical technologyBy R J. Romañach
The theory of sampling (TOS) is now followed in the development of near infrared (NIR) spectroscopic methods for the pharmaceutical industry. TOS has been the guiding light for a two-step approach for
May 9, 2017
-
Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine ExcavationsUnderground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi
Nov 25, 2010
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
"The Biogeometallurgical Approach – the Information We Need to Increase the Sustainability of Mining"By B Dold
"Mining has still today high potential for improvement in the exploitation efficiency. Especially low-grade ores have very low recoveries. In Cu bioleaching operations from porphyry copper deposits ex
Jun 15, 2016
-
A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther LinkagesBy M Dietrich
The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the
Sep 26, 2011
-
The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western AustraliaBy J deVries, A Broodryk, P Kyselica, K McLean
Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc
Aug 31, 2015
-
Water from Mines in Arid Archaean Terrain: Geology of Groundwater occurrenceThe north-eastern half of the Yilgarn Block of Archaean Rocks lies in the and zone of Western Australia. In recent years a large number of gold mines have been established there, all requiring wat
Jan 1, 1988
-
Using a Schmidt hammer to estimate geotechnical properties of carbonate rocks in IsraelBy N Trabelsi, D Bakun-Mazor, Y Ben-Ari
As part of a comprehensive project to develop a remote sensing tool for evaluating the mechanical properties of rocks, one must obtain a rapid indication of these properties using conventional field m
Nov 29, 2022
-
Creep Due to Chemical Alteration of Rocks – A Case Study in Brown CoalBy B J. Wight, R Mackay, S Kim
Improving the understanding of the processes governing ground movements in and around brown coal open cuts is of significant interest for both operating stability and rehabilitation. Brown coal, ligni
Nov 5, 2014
-
Interacting with the Daily Operations and the Need to Plan for Future RehabilitationMine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining OperationsOver the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec
Jan 1, 1999