Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Rawas Gold Project æSuccessfully Overcoming the ChallengesÆ -- The Task Facing a Junior in Indonesia from Exploration to Production

    By Williams JK, Bolitho BC

    Laverton Gold NL (Laverton) is the first junior Australian mining company to establish a viable mining operation in Indonesia. It successfully commissioned the Rawas plant in Sumatra this year with an

    Jan 1, 1997

  • AUSIMM
    Significance of Geological Control on Assay Data in the Narrow, High-Grade Gold Quartz Veins at the Sand Queen Mine, Comet Vale, Western Australia

    By P Collins, C Sheriff

    The Sand Queen gold mine is a typical Archaean narrow, high-grade gold quartz lode deposit within a shear hosted system. Initial mining during 1904 - 1948 produced 181 659 ounces of gold from 248 564

    Jan 1, 2008

  • AUSIMM
    Increased Performance Through Flash Flotation and Cyclone Optimization

    By Rais SA

    In June, 1986, Freeport Indonesia, Inc., in conjunction with Out- okumpu USA, laboratory tested the Flash flotation concept on Primary ball mill underflow. These laboratory results indicated a possib

    Jan 1, 1988

  • AUSIMM
    The OK Tedi Project

    Ok Tedi Mining Limited commenced construction in mid-1981 of facilities and infrastructure to mine and process gold ore at Mt Fubilan in Papua ew Guinea. Production ofgold began more or less on schedu

    Jan 1, 1985

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005

  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Equivalent Rock Column Design System for Tunnel Liners and Underground Structures Incorporating Rock Restraint

    An approximate rapid design system for tunnel liners and underground structures is presented which permits the effects of structure geometry and stiffness, rock quality in terms of its deformation

    Jan 1, 1976

  • AUSIMM
    Tarnagulla Gold Mine

    By L Faulkner

    The Tarnagulla Gold Project in Central Victoria, Australia, was developed and operated by Reef Mining NL between 1994 and early 2000, producing 53 000 ounces of gold from the Nick OÆTime Shoot, a sing

    Jan 1, 2008

  • AUSIMM
    Dolomite in the Steel Industry

    By Mann T

    The use of dolomite as a refractory began in England about 1870 when the basic Bessemer process for the removal of phosphorus from steel was developed by Thomas and Gilchrist.Knowledge of dolomite as

    Jan 1, 1951

  • AUSIMM
    Development and Application of Macroscopic Geological Proxies for Gold Mineralisation in High Nugget Environments û An Example from the Sunrise Dam Gold Mine, Western Australia

    By F Clark, M Erickson, J Biggam

    Unraveling geological complexity and understanding geological risk are critical components of the challenge that face any mining or exploration venture. This understanding is essential to the successf

    Jan 1, 2009

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    Stability of Raise Bored Shafts in Australian Mines

    By M F. Lee

    In order to make good decisions, as to whether large diameter raise bored shafts can be constructed in blocky rock at a particular location, mine planners, management, geotechnical engineers and contr

    Jan 1, 2008

  • AUSIMM
    Life on the Rollercoaster - Mining and Milling the Kencana K1 Orebody, Indonesia

    By R Benton

    Since commencement of underground production in March 2006 the Kencana K1 orebody has delivered over 0.9 Mt of ore containing 1.18 Moz Au until April 2009. The Kencana deposits are part of the Gosowon

    Jan 1, 2009

  • AUSIMM
    HellyerÆs Exploration Development

    By Viney K. G, Molinia A. B

    The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early

    Jan 1, 1988

  • AUSIMM
    Mechanised Tunnelling Technologies for Mining Applications

    The increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an

    Jan 1, 2008

  • AUSIMM
    Geochemical Characteristics of Strongly Acidic Thermal Water of the Tamagawa Hot Spring in North-Eastern Japan û Implications for Source and Transportation of Rare Metals in Magmatic Hydrothermal to Geothermal Systems

    By T Mizuta, T Nakano, D Ishiyama

    The Tamagawa Hot Spring, from which Ra-Pb-Sr-bearing barite precipitates, is a representative hot spring in a volcanic gas-bearing hydrothermal system associated with Quaternary andesitic to dacitic m

    Jan 1, 2008

  • AUSIMM
    The Structural Geology of the Herberton Tin Field

    This paper is based on studies made intermittently from 1937 to 1950. Its object is to describe the surface geology and the tin lodes, and to relate the lodes to the structure of the field.PREVIOUS RE

    Jan 1, 1951

  • AUSIMM
    Modelling of the Sala Agitated Mill (SAM) Using BRGM Pilot Plant Data

    By Olofsson O, Durance M-V, Villeneuve J

    Modelling of the Sala Agitated Mill (SAM) using a simplified solution to the population balance approach has been carried out. The rate of breakage is modified by the mill power, providing predictio

    Jan 1, 1995

  • AUSIMM
    The Effect of Stress Damage on Dilution in Narrow Vein Mines

    By J Slade, R Trueman

    Unplanned dilution has the potential to seriously undermine the economic viability of a mine, and in some cases results in mine closure. The effect of stress damage on dilution has become increasingly

    Jan 1, 2005

  • AUSIMM
    Sampling Coarse Gold-Bearing Mineralisation ù Developing Effective Protocols and a Case Study From the Nalunaq Deposit, Southern Greenland

    By J S. Petersen

    The occurrence of coarse gold particles leading to grade complexity and sampling challenges is a common feature of many gold deposits. Poorly designed sampling protocols applied to these deposit types

    Jan 1, 2005