Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Technology of Flotation

    There are two mechanisms in the flo- tation process by which particles are transported from the pulp to the con- centrate: bubble-mineral aggregation and entrainment. It is the chemical processes w

    Jan 1, 1984

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    The Development of High Efficiency Spiral Separators

    By Ritchie IC

    Spiral separators have been used to treat heavy mineral sands in Australia for some thirty-five years. They were used as the primary treatment method until the advent of the Reichert cone, which l

    Jan 1, 1986

  • AUSIMM
    A Geologist Æs Guide to Destroying Shareholder Value and a Business Improvement Model to Insure Against it

    Many aspects of best practice resource evaluation do not create value, but poor practice can certainly destroy value. Generally companies prefer to present how their good practice adds value and for t

    Jan 1, 2002

  • AUSIMM
    Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, Australia

    The relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the

    Jan 1, 2009

  • AUSIMM
    Operational Geotechnical Engineering at the Ok Tedi Mine, Papua New Guinea

    By Cortes JP

    In a dynamic environment such as the Star Mountains of Papua New Guinea Geotechnical Engineering for the Ok Tedi Project must be described as both interesting and challenging. To be effective a rea

    Jan 1, 1997

  • AUSIMM
    The Edie Creek Vein System and Bulolo Graben

    By Corbett GJ

    The Bulolo Graben represents an intra-arc rift formed by activa- tion of transfer structures in an extensional setting formed be- tween the eastern and western sectors of the New Guinea Origin. Crust

    Jan 1, 1997

  • AUSIMM
    Taking Stock of Safety

    My early experience with the coal industry was in the latter half of the 1970s, where attention to only ones own æaccidentsÆ and concentration on behaviour controls were impeding the introduction of e

    Jan 1, 2005

  • AUSIMM
    Thick Seam Mining Techniques In Japan

    The author describes 1. The classification and characteristics of various thick seam mining techniques in various Japanese coal mines. 2. Practices of thick seam mining methods experienced in Ta

    Jan 1, 1976

  • AUSIMM
    Talisker Mine, 1862-1872 Its History and Heritage

    Silver-lead ores are widely distributed through- out the Mount Lofty and Flinders Ranges, but none of the deposits is large. Historically the Glen Osmond Mines are the most significant as the site

    Jan 1, 1987

  • AUSIMM
    CaroÆs Acid Queensland Mines Plant Trials

    By Fulton E, Ring RJ, Waters DJ

    Laboratory leach tests of Nabarlek uranium ore carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's Acid1 (permonosulphuric acid) as an alternative oxi

    Jan 1, 1978

  • AUSIMM
    Scientific Evaluation of Fauna Sensitivity to Blasting

    By D Martin

    The Rio Tinto (Mount Bruce Mining Pty Ltd) Koodaideri Iron Ore Project is located approximately 110 km north-west of Newman in the Pilbara region of Western Australia. During detailed ecological studi

    Aug 24, 2015

  • AUSIMM
    Grade Control Strategies and Reconciliation Procedures at Kidston Gold Mine, North Queensland

    The large, low grade, Kidston Gold Mine in North Queensland has achieved outstanding economies of scale and profitability. The total mineable ore reserve including mined to-date (as at December 1993

    Jan 1, 1994

  • AUSIMM
    Preassembly Concepts to Reduce Project Capital Costs

    By Kruse JW, Kjar AR

    Recently there has been increased recognition o'f the cost savings that can be achieved by the greater use of offsite preassembly for the construction of industrial plants. Preassembly is a me

    Jan 1, 1983

  • AUSIMM
    Celestite Ore Upgrading - From Laboratory to Mill

    By Joussemet R, Fabre F

    The paragenesis of the Escuzar Mine (Andalusia-Spain) comprises: ò major constituents: celestite and carbonated minerals (abundant calcite and less frequent strontianite). ò minor constituents: sulph

    Jan 1, 1993

  • AUSIMM
    The Value of Water to Rio Tinto

    Increasingly, mineral operations need to manage water as a key business asset. Managing water solely as an environmental issue leaves a business exposed to social, cultural and economic risks associat

    Jan 1, 2006

  • AUSIMM
    Mount Isa Mines Limited Extensions to Plant

    Many mining companies, by their remoteness of location from source of power, have to generate their own power and must experience the same problem that had to be met when deciding to increase the capa

    Jan 1, 1953

  • AUSIMM
    Economic Optimisation of the Blasting-Crushing-Grinding Comminution Process in a Low-Grade iron Ore (Taconite) Operation

    The paper presents the results of laboratory blasting and grinding experiments on a low-grade iron ore, investigating how blasting will influence the subsequent crushing and grinding operations. Inc

    Jan 1, 1998

  • AUSIMM
    Bingham Canyon Mine – from adversity to excellence

    By M Robotham

    In April 2013, Rio Tinto Kennecott Copper’s (RTKC) Bingham Canyon mine experienced what is arguably the world’s largest ever in-pit slope failure. The failure initiated along a major, continuous, low-

    Nov 30, 2018

  • AUSIMM
    The High Productive Operation of a Small Blast Furnace

    By Fukui M

    An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757

    Jan 1, 1980