Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Targeting dilatancy in upstream construction

    By A Simmons, J Chan, A Li, Q Gu, D M. Brett

    The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d

    Jul 1, 2021

  • AUSIMM
    Process Implications of Ferrolysis in Hyper-Saline Water

    By J Bean

    Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo

    Oct 5, 2011

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Protection of Underground Mine Structures Due to Adjoining Open Pit Mine Blasting

    By L S. Shekhawat, M P. Roy, R K. Paswan, P K. Singh, A Joshi

    Blasting in the mining industry is being transformed, and can no longer be treated as an art or a practice purely dependent upon experiences of individuals. Examples of key drivers that have demanded

    Aug 24, 2015

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Biomass and Renewables as Alternative Energy Sources and Reductants in the Minerals Industry

    Minerals processing operations use a significant quantity of fossil carbon to provide energy and as reductant. Greenhouse gas emissions from the use of this fossil carbon contribute to the global incr

    Jan 1, 2004

  • AUSIMM
    Reversing the Trend in Open Pit Mining Equipment Output

    By T Trott, M Lewis, G Lumley

    The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere

    Sep 18, 2012

  • AUSIMM
    Ni Laterite Mineralogy and Chemistry – A New Approach to Quantification

    By M A. Wells

    A new approach to more reliably predict the Ni (and Fe, Mg) composition of Ni laterites was tested for RC samples from the (siliceous) oxide–style, Siberia North deposit, Kalgoorlie Nickel Project (KN

    Sep 5, 2011

  • AUSIMM
    The synergistic interaction between hexanol and dithiophosphate at the air-water and galena-water interface

    By D Pienaar, B McFadzean, C T. O’Connor

    Collector and frother molecules in sulfide mineral flotation are thought to have separate roles in the flotation process, where the collector selectively hydrophobizes the mineral surface and the frot

    Aug 24, 2022

  • AUSIMM
    Iron Ore Tailings Reprocessing to Maximise Ore Production

    By I Sherrell, R Jain

    Worldwide iron ore feed grades are trending downwards and will continue to do so with the increasing difficulties of upgrading ores. This has led to operations looking for ways to capture current tail

    Jul 13, 2015

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Plant Design for Closure

    By D P. Murphy, R F. Dewhirst

    Traditionally closure has been seen by the Resource sector solely as a green or an environmental issue, focused primarily on the requirement to rehabilitate the site following cessation of production

    Jan 1, 2006

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Simulating Time versus Mass Basis?Sampling

    By J Ta’ala, M Handyside

    Mechanical sampling from conveyors has historically been a staple in the iron ore industry when information related to chemistry, sizing and moisture is required. In order to comply with ISO 3082:2009

    Jul 29, 2014

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A comparison of the performance of fully versus partially encapsulated cable bolts based on laboratory-scale testing

    By P Hagan, S Wang, D Li, B Loh

    A study was undertaken to quantify the differences in performance between a full-length encapsulated cable bolt and a partially encapsulated cable bolt. Much research has been reported on the differen

    Nov 30, 2018