Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Effect of horizontal stress on shallow coalmine slopesBy I Canbulat, A Mcquillan
This paper presents a parametric analysis showing the impact of virgin in situ stresses on a shallow (less than 100 to 150 m) high slope in a jointed sedimentary rock environment. Slope stability is a
Nov 29, 2022
-
A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century MineBy R Wynn, N Stoitis, R A. Lauten, H Liang
At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a
Sep 1, 2014
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
Analysis of Twin Road Tunnels Using Numerical Modelling TechniquesBy D R. Wines
The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi
Mar 8, 2011
-
Ventilation considerations and modelling of lithium battery fires inunderground miningBy C M. Stewart
Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for
Oct 12, 2022
-
Calibration of post blast gas simulation using mine site readingsBy F C. D Michelin
Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,
Oct 12, 2022
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
Geometallurgical Modelling of the Dumont DepositBy M Sciortino, J Korczak, J Muinonen, A St-Jean
The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir
Sep 29, 2013
-
Using Independent System Simulation to Mitigate Risk in the Dalrymple Bay Coal ChainBy B Olsson, B Reynolds, R Norman
An unprecedented growth in demand for coal exports has placed pressure on multi-user coal chains to guarantee that their capacity expansion projects will meet the required demand. These projects, howe
May 24, 2012
-
Is Measuring pH Enough?By J Kinal, I Mitchell
Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased
Jan 1, 2006
-
Vibration control blasting for low stability final wallsBy G Wyartt
In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl
Nov 30, 2018
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Introducing and Sustaining a Continuous Improvement Program in Mines and SmeltersBy M Costa, L Polizzi
Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the
Sep 1, 2014
-
The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, TasmaniaBy P B. Hills, R J. Walton
Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem
Jan 1, 2008
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016
-
Particle Size Analysis – Optimising Returns in Iron OreBy B Stump
Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal
Jul 11, 2011
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Active explosion barrier conformance to the Australian Recognised Standard 21 – a total mine solutionBy A Späth
Active explosion barriers are used to contain and suppress a methane gas and/or coal dust explosion propagation, including localised mine fires. Early research indicated that these active explosion ba
Oct 12, 2022
-
Investigation on Collector Optimisation in the Reverse – Iron Ore FlotationBy M S. Cassola
It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r
Jul 11, 2011