Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development and Construction Update of the Grasberg Block Cave Mine

    By A T. Yuniar, C A. Brannon, N D. Pascoe, H H. Firdausi

    This paper describes the key components of the Grasberg Block Cave (GBC) mine design and the development and construction status of the mine. Drawpoint production from GBC will be initiated in 2018 fo

    May 9, 2016

  • AUSIMM
    The Role of Metals in Sustainable Development

    By W J. Rankin

    Metals are well suited to sustainable development goals. They are not biodegradable and have virtually an unlimited lifespan and the potential for unlimited recyclability. Thus metals can be considere

    Jan 1, 2002

  • AUSIMM
    Mining Company Reporting Standards ù The South African Experience

    South Africa has joined the league of other major Western World countries by officially adopting its own code for public reporting of Mineral Resources and Mineral Reserves. The recently published Sou

    Jan 1, 2002

  • AUSIMM
    The Research on Application of New Technologies in High Gradient Magnetic Separator with Horizontal Magnetic Line

    The Research on Application of New Technologies in High Gradient Magnetic Separator with Horizontal Magnetic Line

    Sep 13, 2010

  • AUSIMM
    Alluvial Drilling - Mikonui River

    During an eight month period, January to August 1978, nine bore holes were drilled in the Mikonui River gravels. On account of two rebores required from near bottom, the number of bores is in eff

    Jan 1, 1979

  • AUSIMM
    The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator

    By D R. Carr

    The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity

    Jan 1, 2003

  • AUSIMM
    What Government Offers and Wants from Industry; What Industry Offers and Wants from Government

    Distinguished guests ladies and Gentlemen. As many of you know, before I became a Labour Member of Parliament, I had an unusual career path for a politician, in that I spent quite a few years working

    Jan 1, 2000

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • AUSIMM
    The Public Sustainability Reporting Process

    By R Salmon, C Jones

    This paper examines the recent trend towards sustainability reporting and the application of the Global Reporting Initiative (GRI) æSustainability Reporting GuidelinesÆ. It also reviews reporting in t

    Jan 1, 2002

  • AUSIMM
    The Victoria Gold Deposit in the Mankayan Mineral District, Luzon, Philippines

    By A G. Cuison, B V. Andam

    Three well-known copper and gold deposits in northern Luzon, Philippines are located in the Mankayan Mineral District. These are the Lepanto Copper-Gold Deposit, the Far Southeast Porphyry Copper Depo

    Jan 1, 1999

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • AUSIMM
    Life Cycle Assessment of Process Options for Copper Production

    By Y Zhuang, S La Brooy

    The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi

    Jan 1, 2002

  • AUSIMM
    Detrital Gold in North Westland

    Detrital gold in the Greymouth-Hokitika area has been won from: (a) gravel of the Pliocene Old Man Group, (b) glacial outwash gravel of Middle and Late Quaternary age, (c) raised shoreline deposits of

    Jan 1, 1996

  • AUSIMM
    Geostatistical Modelling of Hydraulic Fracturing Pressures at El Teniente Mine

    By P Landeros, D Benado, J Cornejo, A Pinochet, C Caviedes

    In 2005, El Teniente mine began preconditioning the primary rock mass by hydraulic fracturing (HF). The major perceived benefits of this process are a decrease in the magnitude of the expected maximum

    May 9, 2016

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000

  • AUSIMM
    How to Evaluate Crushed Rocks for Concrete Production

    How to Evaluate Crushed Rocks for Concrete Production

    Sep 13, 2010

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • AUSIMM
    Exploration and Assessment of the Central Otago Lignite Deposits

    Three large deposits of good quality lignite were located and delineated in the Central Otago region between October 1978 and July 1979. The program was initiated and funded by Mines Division of the M

    Jan 1, 1983

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    Alluvial Platinum in the Howard Valley, Nelson Lakes Area û Origin and Comparison with Some Other New Zealand Platinum Occurrences

    By K Palmer

    Alluvial platinum was recovered during gold mining operations in Maud Creek, a tributary of the Howard River. Average electron probe analyses give Pt 88.75, Fe 5.27, Ir 0.70, Os 1.06, Pd 0.34, Ru 0.14

    Jan 1, 1987