Search Documents

  • NIOSH
    RI 9340 - Biosorption of Metal Contaminants Using Immobilized Biomass-A Laboratory Study

    By T. H. Jeffers

    The U.S. Bureau of Mines has developed porous beads containing immobilized biological materials for removing metal contaminants from waste waters. The beads, designated as BID-FIX beads, are prepared

    Jan 1, 1991

  • SME-ICGCM
    Fortrac® Geogrids For Mine Roof Control

    By Ray Brandon

    The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid

    Jan 1, 1996

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • SME
    Baumgartner Shafts and Tunnel

    By Jim Nickerson, James McCleish, Tom Abkemeier, Nicholas Willig

    The purpose of this project is to convey sanitary sewage from an existing pump station to a new waste water treatment plant. This paper will discuss the design and construction aspects of the project.

    Jan 1, 2005

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997

  • SAIMM
    Design tools to minimize the occurrence of ore pass interlocking hang-ups in metal mines

    A comprehensive review of ore pass records, from ten Quebec underground mines, indicated some of the limitations of available design tools to predict the occurrence of ore pass interlocking hang-ups i

    Jan 1, 2003

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • NIOSH
    OFR-76(2)-75 Mine Electrical Systems Evaluation - Explosion-Proofing Of Mine Containers - Introduction

    By Robert Stefanko

    In the context of the following report, an hazardous location can be described as any industrial area in which flammable or explosive gases, vapors, and dusts can be encountered. When electrical appar

    Jan 1, 1974

  • AUSIMM
    Reopening the Tasmania Mine

    The project to reopen the Tasmania Mine has centred around efforts to reopen the Hart Shaft to access the high grade reef remaining below the old workings, which extend down to 457 in. Efforts in 1

    Jan 1, 1989

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • ISEE
    Production Blasting with Electronic Delay Detonators at Peak Quarry

    By H G. Bosmare, G Bedser, C V. B Cunningham

    Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl

    Jan 1, 1998

  • NIOSH
    RI 7078 Investigation Of Flame Propagation Characteristics In Layered Gas Mixtures

    By Israel Liebman

    The Bureau of Mines conducted an investigation to determine those factors that are significant in affecting the velocity of flames propagating along the boundary separating gaseous fuel and air. In ad

    Jan 1, 1968

  • SAIMM
    A Study Of Factors Influencing The Kinetics Of Copper Cementation During Atmospheric Leaching Of Converter Matte

    By R. M. Lamya

    The kinetics of copper cementation during atmosphere leaching of a Ni-Cu matte in CuSO4-H2SO4 solution was studied as a function of initial copper ion concentration, initial acid concentration, temper

    Jan 1, 2005

  • AUSIMM
    Fine Gravity Separation in the Reflux Classifier, Exploiting a High Shear Rate, Laminar Flow Mechanism

    Fine Gravity Separation in the Reflux Classifier, Exploiting a High Shear Rate, Laminar Flow Mechanism The Reflux Classifier is used in the gravity separation of particles over a broad range of parti

    Sep 13, 2010

  • NIOSH
    RI 7716 Use Of Cryogens To Reclaim Nonferrous Scrap Metals

    By E. G. Valdez

    Three cryogenic systems that utilized liquid nitrogen, dry ice, and methanol with dry ice were investigated in conjunction with crushing and classifying techniques. The systems were used to aid in sep

    Jan 1, 1973

  • NIOSH
    Programmable electronic and hardwired emergency shutdown systems: A quantified safety analysis

    By John J. Sammarco

    Abstract- Emergency shutdown systems (ESDs) for mining machinery provide critical functions to safeguard miners. Traditionally, ESDs were realized with simple hardwired circuits; today, there is a gro

    Jan 1, 2007

  • NIOSH
    Considerations In Training On-The-Job Trainers

    By Don Conrad, Tom Friend, Bill Wiehagen, Lynn Rethi

    On-the-job training (OJT) is a very common method of teaching job skills. Much of the training is done by experienced workers. This paper discusses small investments that can help improve the effectiv

    Jan 1, 2002

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • NIOSH
    A Comparative Evaluation Of The Differential-Pressure-Based Respirable Dust Dosimeter With The Personal Gravimetric Respirable Dust Sampler In Underground Coal Mines

    By R. V. Ramani, J. M. Mutmansky, P. C. Luna, V. A. Marple, Honglin He, B. A. Olson

    The development of a sampling instrument for the assessment of an underground coal miner’s exposure to airborne respirable coal mine dust on a continuous and real-time basis has been long identified a