Search Documents

  • NIOSH
    RI 3112 Flotation Reagents, 1929

    By R. L. Kidd, T. H. Miller

    "INTRODUCTION This paper is the seventh of a series of yearly reviews started in 1921 and pre¬sents information gathered in a cooperative investigation undertaken by the United States Bureau of Mines

    Aug 1, 1931

  • CIM
    Continuous Countercurrent Ion Exchange (CCIX) Used In Hydrometallurgy - The Influence of Iron

    By Filip Rochette, Yvan De Busscher

    Extraction of minerals can be achieved by a variety of technologies; one of them is ion exchange. There are several ion exchange configurations and mechanical set-ups available, but only one technolog

    Jan 1, 2016

  • CIM
    SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future Operations

    By Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius

    "The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role

    Jan 1, 2007

  • CIM
    SPOC Project Software and Manual

    By R. F. Pilgrim

    "This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a

    Jan 1, 1986

  • DFI
    Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)

    By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann

    "Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve

    Jan 1, 2017

  • NIOSH
    OFR-44-79 Monitoring Of Mine Air Blast Pollutants From Six Explosives Tested In An Underground Mine

    By Duane L. Abata

    Toxic gases produced by the detonation of six explosives were measured in an underground hardrock metal mine during actual mining operations. The six explosives included two semi-gelatin dynamites, th

    Jan 1, 1978

  • AIME
  • NIOSH
    OFR-45-79 Development Of Water Capsules

    By Clarke E. Schuetze

    This project had as its objective the experimental investigation of water capsule production utilizing the Southwest Research Institute's submerged nozzle encapsulation apparatus (U.S. Patent 3,3

    Jan 1, 1978

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • NIOSH
    IC 7017 Bureau Of Mines Haldane Gas-Analysis Apparatus ? Introduction

    By L. B. Berger

    The Haldane gas-analysis apparatus used by the Bureau of Mines is patterned after the device developed by Haldane 4/ and differs from it only in structural modifications that have been added to facili

    Jan 1, 1938

  • AUSIMM
    Hierarchical Clustering Algorithm for Block Aggregation in Open Pit Mines

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. Various mixed integer linear programming (MILP) formulations have been used for production scheduli

    Dec 6, 2010

  • NIOSH
    RI 8736 Alumina Miniplant Operations - Calcination of Kaolin in a Direct-Fired Rotary Kiln

    By Theodore L. Turner

    This Bureau of Mines report describes calcination of kaolinitic clay in a direct-fired 2-1/2- by 24-ft rotary kiln at 750° and 775° C. Methods for preparing kaolin feed materials and characterization

    Jan 1, 1982

  • SME
    Southfield Sewer Investigation, Replacement and Repair: A Case History

    By Harry R. Price, Bharat Doshi, Awni Qaqish, Abdul-Ghani Mekkaoui, Thaddeus Znoy, Ramesh Shukla

    In 1992, a detailed inspection of the Southfield Sewer revealed a reach of approximately 0.8 kilometers in length, located directly below the freeway lanes, which was severely distressed. Failure of t

    Jan 1, 2001

  • CIM
    Application of expert systems for peak power management

    By Y. L. Su, S. Vongpaisal, H. A. Smith

    "It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F

    Jan 1, 1993

  • NIOSH
    OFR-43-79 Cables For Face Equipment, Standardization Of Requirements

    By R. Stefanko

    This first Annual Report covers the work on Contract No. H0377043 "Cable for Face Equipment", from August 1, 1977 to July 31, 1978. It reports the progress in the three areas of over-and short-circuit

    Jan 1, 1978

  • NIOSH
    RI 6009 Calibration Studies Of Three Portable Seismographs

    By David E. Fogelson

    One model each of three different makes of portable displacement seismographs was calibrated on a shaking table capable of 5,000 pounds of force, Calibration tests were conducted in the frequency rang

    Jan 1, 1962

  • AUSIMM
    Practical Stope Reconciliation in Large-scale Operations Part 2, Olympic Dam, South Australia

    By J Wesseloo and Y Kim, Y Potvin, G Mungur, D Grant

    At the previous MassMin conference held in Sudbury in 2012, the authors proposed a new framework going beyond dilution and equivalent linear overbreak sloughing (ELOS) for stope reconciliation in rela

    May 9, 2016

  • SAIMM
    Rough-Wall And Turbulent Transition Analyses For Bingham Plastics (ff09849d-d0b2-4db9-a912-4035370a09bb)

    By A. D. Thomas

    Some years ago, the authors developed an analysis of non-Newtonian pipe flow based on enhanced turbulent microscale and associated sublayer thickening. This analysis, which can be used for various rhe

    Jan 1, 2007

  • SAIMM
    The introduction of a tunnel borer into a South African gold mine

    By A. E. Hall, R. N. Taylor, J. G. Taylor

    The introduction of tunnel-boring machines to South African gold mines has created problems and challenges which accompany any new technique. This paper describes the experience gained in this fie

    Jan 1, 1978