Search Documents

  • NIOSH
    Multiple Seam Longwall Mining In The U.S.—Lessons For Ground Control

    Relatively few longwall mines in the U.S. operate under multiple seam conditions where the two seams are less than 200 ft apart. This paper describes the experience of six that do. These operations

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • SME
    Recent Developments In Dense Medium Cyclone Circuit Design – Preprint

    By L. Watters, R. Terry, D. Placha

    Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si

    Feb 24, 1997

  • AUSIMM
    Sub-Level Open Store Design on Northern Rhodesian Copperbelt

    The paper is a general review of practice in design of sub-level open stopes in Northern Rhodesian copper mines and gives examples of some interesting developments during the last five or six years. I

    Jan 1, 1954

  • ISEE
    Modified Case Charge for Avalanche Control

    By Eduardo Lozano, Vilem Petr

    This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique

    Jan 1, 2018

  • CIM
    An Empirical Approach to Charge Media Wear Prediction

    By Peter Radziszewski

    "Typical mining operating costs can be divided between extraction (30 % to 70 %), comminution (30 % to 50 %) and separation (5% to 20% ). Cornminition process costs, representing an important contribu

    Jan 1, 2000

  • CIM
    Validation of High Fidelity Simulation Wear Predictions in Various Types of Mineral Processing Equipment

    By John A. Herbst, Xiangjun Qiu

    "Prediction of wear on a microscale level in mineral processing equipment turns out to be a challenging undertaking. This is particularly true for cases in which the objective is to use such predictio

    Jan 1, 2007

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • SAIMM
    Ventilation Strategies To Meet Future Needs Of The South African Platinum Industry (64ed4cdf-d020-42f9-8bd5-078f2810120b)

    This paper provides an overview of possible approaches for structuring the ventilation systems for mines that will become operational within the next decade. Features addressed in the paper include: a

    Jan 1, 2007

  • AUSIMM
    Fissure Vein Structures and Brecciation in the Upper Levels of the Broken Hills Epithermal Au/Ag Deposit, Hauraki Goldfield, New Zealand

    By J L. Mauk

     Broken Hills is an adularia-sericite epithermal Au-Ag deposit, hosted in flow-banded rhyolites and overlying rhyolitic pyroclastic rocks in the eastern Hauraki Goldfield. The 7.1 Ma deposit was

    Jan 1, 2005

  • AUSIMM
    The Gosowong Goldfield – A World-class Epithermal Gold-silver District in Indonesia

    By A Harris, N Fitzpatrick, F MacCorquodale

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Gosowong epithermal Au-Ag deposits, located on the island of Halmahera, North Maluku Pr

    Mar 18, 2015

  • NIOSH
    IC 8204 Mining Methods And Costs, Mouat Mine, American Chrome Co., Still Water County, Mont. (92c1131e-e784-4994-8b74-2febee9dafcb)

    By Paul M. Price

    The Mouat mine, Nye, Mont., was reopened in 1953 by the American Chrome Co. under a Defense Minerals Production Administration contract. Operations were terminated in 1961 after completion of the cont

    Jan 1, 1963

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • AUSIMM
    Government Coodrination and Liaison: The Lihir Project

    By Van Dusen M

    The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t

    Jan 1, 1991

  • CIM
    Moly-Cop Tools Applications for the Assessment of Grinding Media Performance at Full Industrial Scale

    By J. E. Sepulveda, R. Morrow

    "The Linear Wear Theory provides a reliable framework for the assessment of grinding media performance at full scale. This theory can be applied for analyzing grinding media consumption rates in any g

    Jan 1, 2014

  • CIM
    The Alsands Project

    By C. R. Edwards, J. R. Smith

    "INTRODUCTIONThe purpose of this paper is to give an overview of the ALSANDS PROJECT, with emphasis on the approach taken in the design of the Primary Extraction and Froth Treatment Plants.The Alsands

    Jan 1, 1982

  • AUSIMM
    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Sep 13, 2010

  • AUSIMM
    Broken Hill Ore Chute Design

    THE Broken Hill mining field, approximately 31 miles in length, is at present being exploited by seven companies, viz. : North Broken Hill Limited, Junction North Broken Hill No Liability, Broken Hill

    Jan 1, 1925

  • SAIMM
    Project Valuation, Capital Investment And Strategic Alignment - Tools And Techniques At Anglo Platinum (defa1552-deac-43da-9958-aabe8c199db2)

    By G. L. Smith

    Central to the success of any mining company is the ability to manage capital investment effectively so as to ensure acceptable stakeholder returns within an overall strategic context. Critical to thi

    Jan 1, 2007

  • AIME
    Reservoir Engineering – General - New Single-Well Test for Determining Vertical Permeability

    By W. A. Burns

    Vertical flow is an important mechanism in many petroleum reservoirs. Yet no adequate method has heretofore been proposed for determining the in-situ vertical permeability in a reasonable length of ti

    Jan 1, 1970