Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
MLA 11-83 - Mineral Investigation Of The Bear Canyon Rare II Area (No. 5104), Monterey County, CaliforniaBy John R. Benham
The Bureau of Mines examined the Bear Canyon RARE II area in 1982. The area has no identified mineral deposits. The few claims that were located in the study area are devoid of any workings. No concen
Jan 1, 1983
-
How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in FlotationHow Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation
Sep 13, 2010
-
Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating HighlightsBy K. Meyer
"INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.
Jan 1, 1989
-
Construction Of The Pacheco Pumping Chamber And ShaftsBy Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Chapter 12. Determination and PaymentBy Karl J. C. Harries
"12.1. NO DEPRECIATION/GAAPAll calculations and computations relating to the Royalty shall be carried out in accordance with generally accepted accounting principles consistently applied to the extent
Jan 1, 2003
-
Design And Construction Of The Lafayette Bluff TunnelBy D. L. Petersen, C. R. Nelson, B. K. Nelson, B. D. Wagener
The Lafayette Bluff tunnel, currently under construction for the Minnesota Department of Transportation (MnDOT), will be among the widest highway tunnels in the United States. The 199-meter tunnel is
Jan 1, 1991
-
Factors Affecting The Location Of The Neutral Point In Ventilation Systems (4b1f3a2d-a6d9-44c2-9c56-0100dbf7a4af)By J. M. Wempen
Booster fans in underground coal mines are often located using the concept of a neutral point. Normally, intake airways are maintained at higher absolute pressure than return airways, so air leaks fro
Jan 1, 2012
-
The Morphology Control Of Cobalt Compounds And Co3O4 Powder Produced By Homogeneous Precipitation ProcessBy Chen Song
Keywords: Co3O4, Cobalt Compounds, Morphology, Urea, Homogeneous Precipitation Depending on experimental condition, precipitation from cobalt nitrate and chloride solution in the presence of urea
Jan 1, 2005
-
Bubble Flow Pattern Detection in the Water Model of a Metal Treatment UnitBy J J. J Chen, J C. Zhao
A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a gi
Jan 1, 1995
-
Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385By V. Rajaram
R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou
Jan 10, 1986
-
Performance And Experiential Development Of The Mobile Miner At Mount IsaBy R. J. Boyd
SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc
Jan 1, 1987
-
Discussion - Interactive graphics for semivariogram modelingM.S. Azun I have many objections to the content of the author's paper. Before discussing it, however, I would like to repeat the property of semivariogram function. Second order stationary
Jan 11, 1985
-
OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction[Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues
Jan 1, 1976
-
Technical Papers and Notes - Institute of Metals Division - The Relationship between Electrical and Thermal Conductivities of Titanium AlloysBy C. F. Lucks, W. D. Wood, H. W. Deem
Electrical ad thermal-conductivity measurements have been made on titanium and 6 titanium alloys. The following expression was derived for calculating thermal conductivity from electrical conductivi
Jan 1, 1959
-
Alternative Contracting MethodsBy John Reilly
Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),
Jan 1, 2007
-
Macassa Number Three Shaft Deep Shaft Sinking By Conventional MethodsBy W. M. Shaver, W. R. Dengler, F. A. Edwards
INTRODUCTION The Macassa Division of Lac Minerals Ltd. is a high grade gold mine that has been operating in Kirkland Lake, Ontario for the past 51 years. It produces approximately 120,000 tonnes of
Jan 1, 1985
-
Fine Copper Grinding Using Metso’s Stirred Media DetritorBy Graham Davey
High-speed stirred milling is a relatively new method of grinding in the metalliferous process industries. However, it has been widely used in the industrial mineral field for more than 30 years. Man
Jan 1, 2004
-
New Dimensions in Initiation SystemsBy Curtis G. Kremer
"New explosives initiation systems continue to be developed as new technologies make advancements possible. Due to recent initiator developments, explosives users now have the most reliable, accurate
Jan 1, 1991
-
UK Seabed Resources - Sustainably Developing Deep Sea MineralsBy Ralph Spickermann
UK Seabed Resources (UKSR) signed a manganese nodule exploration contract with the International Seabed Authority on 8 February 2013 for a 58,000 km2 tract on the eastern edge of the Clarion Clipperto
Sep 1, 2014
-
Development Status of Thin, Spray-on Liners for Mining and Civil Engineering ApplicationsBy James F. Archibald
Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra
May 1, 2006