Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USABy P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Getting More From the Ore – 1995 Daniel C. Jackling LectureBy J. Burgess Winter
It is an honor to present the lecture in honor of Daniel C. Jackling, the developer of the technology of copper mining that we continue to use 100 years later. He made a dramatic breakthrough in the e
Jan 1, 1995
-
Estimation of Rock Fragmentation in Bench Blasting Using Numerical SimulationBy Sang Ho Cho, Masaji Kato, Masaaki Yamamoto, Masaaki Nishi, Katsuhiko Kaneko
This paper presents a numerical simulation method to predict rock fragmentation and to verify a fracture mechanism by bench blasting. The rock fragmentation, which has been used as a means of the inde
Jan 1, 2002
-
OFR-47(5)-83 Ecological Studies On The Revegtation Process Of Surface Coal Mined Areas In North Dakota - 5. Plant Production On Spoils And Topsoils As Affected By Time And AmendmentsBy Richard H. Bares
One criterion central to most definitions of reclamation is the restoration of mined lands to their original productive potential. This is often difficult to achieve on mined lands in the Northern Gre
Jan 1, 1982
-
Moving Forward on New York’s Second Avenue SubwayBy David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh
This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists
Jan 1, 2007
-
RI 3499 Combustibility Of Coke In Air - A Laboratory MethodBy R. E. Zane
[The Northwest Experiment Station of the Bureau of lines, in cooperation with the College of Mines, University of Washington, has completed a detailed investigation of the physical and chemical proper
Jan 1, 1940
-
Developing Toolbox Training Materials For Mining - What Is Toolbox Training And Why Use It?By Floyd D. Varley, C. M. K. Boldt
Toolbox training is often described as short, informal training conducted at a worksite by technically competent persons for the benefit of a work team. The key feature of toolbox training is the focu
Jan 1, 2002
-
Development And Application Of Reservoir Models And Artificial Neural Networks For Optimizing Ventilation Air Requirements In Development Mining Of Coal SeamsBy C. Özgen Karacan
In longwall development mining of coal seams, planning, optimizing and providing adequate ventilation are very important steps to eliminate the accumulation of explosive methane-air mixtures in the wo
-
Arbitration - The Tender TrapBy James Green
It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T
Jan 1, 1987
-
The Influence of Impurities on the Properties of Lead Part IV - Some Effects of Antimony on the Rate of Recrystallisation of Distorted LeadIn a previous paper the author showed that silver considerably delayed the recrystallisation of lead after cold work. The effect of antimony on the rate of recrystallisation of distorted lead was stud
Jan 1, 1936
-
Limestone Mining – Is It Noisy Or Not? (a6f0b5ad-a610-4972-afd6-68c53ccd734c)By D. R. Babich, E. R. Bauer
National Institute for Occupational Safety and Health (NIOSH) researchers are conducting a cross-sectional survey of equipment noise and worker noise exposures in the mining industry. Surface and und
Jan 1, 2006
-
Effects of Rock/Coal Interface Property on Coal Pillar StrengthBy Jun Lu
There are many factors affecting the strength of pillar, including width-to-height (W/H) ratio, mechanical properties of coal and surrounding rocks, property of partings in the coal, and the interface
Jan 1, 2008
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Implementacion de un sistema integrado de gestion en la fundicion de cobre de S.P.C.C IloBy Feria Bengoa
El creciente interés del público sobre los problemas ambientales, la satisfacción de los clientes y la seguridad minera, ha generado un alza de leyes en el sector minero e industrial, nuevas ONG y la
Sep 12, 2005
-
Coal - Basic Study of Internal Vertical Stress Distribution in Confined Bulk SolidsBy W. J. Verner, J. R. Lucas
Billions of tons of bulk solid materials are processed through our industrial plants each year, and the tonnage is steadily rising. It has been estimated that for every dollar spent in industry as a w
Jan 1, 1961
-
Effect of Lattice Impurities on Electronic Properties and Surface Adsorption of Sphalerite - A Density-Functional Theory StudyEffect of Lattice Impurities on Electronic Properties and Surface Adsorption of Sphalerite - A Density-Functional Theory Study
Sep 13, 2010
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - SummaryBy Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Mechano-Column FlotationBy Turgut Yalcin
"High-grade concentrates are achieved in flotation columns primarily due to the use of thick froth layers and wash water, both of which facilitate the drainage of hydrophilic minerals from the froth.
Jan 1, 1997
-
Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil
May 1, 2007
-
Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mineBy U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005