Search Documents

  • SAIMM
    Cokriging for Optimal Mineral Resource Estimates in Mining Operations

    Cokriging uses a sparsely sampled, but accurate and precise primary dataset, together with a more abundant secondary data-set, for example grades in a polymetallic orebody, containing both error and b

    Jan 1, 2014

  • SAIMM
    Managing The Geotechnical And Mining Issues Surrounding The Extraction Of Small Pillars At Shallow Depths At Xstrata Coal South Africa ? Synopsis

    By S. Z. Pethö

    Pillar extraction at shallow depths with small pillars that were not originally intended for secondary extraction can provide a huge benefit to the coal mining industry in those areas where a signific

    Jan 1, 2012

  • TMS
    Preparation Of Mono-Dispersed Cobalt Oxide Particles By Homogeneous Precipitation With Urea

    By Qing Bo

    In this study, the cobalt oxide precursor was prepared in open-style reactor in the condition of high reactant concentration, and then the precursor was decomposed to obtain the cobalt oxides (Co3O4).

    Jan 1, 2006

  • SAIMM
    Gliding cylinder method for the viscosity measurement of molten salts, slags and glasses

    By Y. Shiraishi, Y. Sakurai

    A new method, the gliding cylinder method, was proposed as a wide range viscometer for the measurements of molten salts, slags, and glasses. The method consists of two coaxial cylinders, cylindrical b

    Jan 1, 2004

  • CIM
    Characterization of Nanometer and Ultrafine Diesel Aerosols in the Underground Mining Environment

    By Aleksandar D. Bugarski

    Despite extensive research efforts conducted in the past decades, occupational health risks associated with exposure to nano and ultrafine aerosols emitted by diesel power equipment are still not comp

    May 1, 2007

  • NIOSH
    OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description

    1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad

    Jan 1, 1979

  • AUSIMM
    Using liquid nitrogen for the inertisation of goafs

    By D Caley

    During the response to the Moura No 4 disaster, use was made of the New South Wales Mines Rescue Service’s ‘Mineshield’ inertisation equipment. The equipment had to be transported from Newcastle, appr

    Aug 28, 2017

  • AIME
  • AUSIMM
    An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

    Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The

    Dec 6, 2010

  • SME
    Analysis Of The Mining Engineering Faculty Pipeline

    By M. M. Poulton

    Universities are not immune from the large number of retirements facing the mining industry. Department heads anticipate that we will need to replace all of the senior mining engineering faculty in t

    Jan 1, 2012

  • SME
    Designing To Protect Adjacent Structures During Tunneling In An Urban Environment

    By Marco D. Boscardin, Paul A. Roy, Kevin J. DiRocco, Andy J. Miller

    The North Shore Connector Project for the Port Authority of Allegheny County involves TBM mining a pair of subway tunnels through soil and rock under the Allegheny River and a narrow city street. Alon

    Jan 1, 2007

  • SME
    West Elk Mine: The Conversion From An Exhausting To A Forcing Ventilation System

    By J. C. Poulos

    The West Elk Mine is located near Somerset, Colorado approximately 70 miles southeast of Grand Junction, Colorado and 72 miles southwest of Glenwood Springs, Colorado on state highway 133 (Figure 1).

    Feb 27, 2013

  • NIOSH
    China, Hong Kong, Mongolia, And Taiwan - China

    By E. Chin

    Under the seventh 5-year plan (1986-90), the Chinese Government continued to implement reform and to open the country further to the outside world in order to accelerate the growth of its national eco

    Jan 1, 1990

  • AUSIMM
    Infra-red Absorption Study of Crocidolite and Associated Rocks from Wittenoom Gorge, W.A.

    By Patterson J. H

    An infra-red absorption study has been made of crocidolite, country rock. and associated host rocks from Wittenoom Gorge. The spectrum of the country rock is appreciably different from those of crocid

    Jan 1, 1966

  • AUSIMM
    Trommel panel development for iron ore applications

    By R Wilson, R Williams, B Freeburn

    McLanahan RSS14x50 scrubber screens have individually processed over 50 Mt of Pilbara iron ore. The first stage of separation in these plants with abrasive, high specific gravity, large lumps is an ex

    Jul 24, 2017

  • AUSIMM
    Minimising Mineral Project Risk - New Zealand in a Global Context

    Mining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat

    Jan 1, 2005

  • NIOSH
    OFR-108-78 Development Of An Improved Methane Sampling System

    By Wilbur L. Webb

    An electrically powered methane sampling system for application on mining machines was designed, fabricated and laboratory tested. The system will sequentially draw sample air at a controlled rate fro

    Jan 1, 1977

  • NIOSH
    Implementation Of Diesel Particulate Filter Technology In Underground Metal And Nonmetal Mines

    By L. D. Patts, G. H. Schnakenberg

    Achieving substantial reductions in the exposure of underground miners to diesel particulate matter in a number of metal and nonmetal mines in the U.S. depends on the ability of the industry to widely

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987