Search Documents

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • NIOSH
    OFR-123(1)-81 Finite Element Analysis Applied To Resin And Mechanical Roof Bolting Systems For Strata Bound Deposits - Volume I

    By J. C. Gerdeen

    This project was a supporting effort with research contract H0230016 at White Pine Copper Company. Creep properties of White Pine rock were determined. These and properties for bolted joints were used

    Jan 1, 1976

  • IIMP
    Simulaciones condicionales geoestadísticas aplicada a la clasificación de recursos

    By Mario E. Rossi

    Las simulaciones condicionales geoestadísticas se utilizaron como herramientas de control de leyes en operaciones diarias que evalúan la incertidumbre y el riesgo de las reservas mineras en estudios d

    Jul 17, 2000

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "MFIRE" Mine Fire And Ventilation Simulator ? 1.0 Introduction

    By Linneas W. Laage

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • AIME
    Drilling – Equipment, Methods and Materials - Effect of Pressure on Rock Drillability

    By John R. Eckel

    A Iaboratory drilling rig has been devised and placed in operation which permits the application of hydrostatic, terrastatic, and formation pore pressures to a rock sample for drilling under controlle

  • AUSIMM
    Is Australia Producing Sufficient Numbers of Earth Science Graduates?

    By Robinson KJ

    There has been much debate in recent years regarding the number of Geology (Earth Science) graduates produced in Australia. The key variable has commonly been assumed to be the placement of graduat

    Jan 1, 1989

  • AIME
    Discussion of Papers Published Prior to September 1963 - Technical Efficiency of Concentration Operations

    By E. Douglas, D. N. Collins, J. R. Stevens

    E. Douglas (Dept. of Scientific and lndustrial Re-search, Warren Spring Laboratory, Hertfordshire, England) — The authors are to be congratulated on the considerable improvements they have made in tai

    Jan 1, 1963

  • CIM
    Analysis of the Influence of the Mining Sequence on a Remnant Pillar with FLAC3D

    By Shahé Shnorhokian

    Remnant pillars evolve towards the latter stages of mining in an orebody and act as repositories of mining-induced stress. It is therefore crucial to plan ahead as to their dimensions and location wit

    Jun 1, 2012

  • SAIMM
    Financial Impact Of Resource/Reserve Uncertainty

    In constructing a financial model of a project significant effort is expended on capital and operating cost estimation, commodity price forecasts, and choice of discount rates while uncertainty in the

    Jan 1, 1999

  • TMS
    Analysis of Light Hydrocarbon Gases in the Pyrolysis and Combustion Processes of Waste Tires

    By Joner O. Alves

    The disposal of scrap tires has been a serious environmental problem. The treatment of this waste by pyrolysis and combustion has advantages since the landfill space is dwindling and the production of

    Jan 1, 2010

  • SME
    Large Excavator Cuts Operating Costs at Alabama Coal Mine

    By Bill Elverman

    Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations

    Jan 1, 2005

  • SAIMM
    Electrochemical Studies Of The Interaction Of Ethyl Xanthate With Pd-Bi-Te

    By J. A. Venter, M. K. G. Vermaak

    There are practical indications that flotation recovery of palladium bismuth tellurides is poor. This work tested whether this can be caused by a lack of interaction of the collector with the tellurid

    Jan 1, 2004

  • IIMP
    Aplicación de un sistema de gestión estratégico en las operaciones de la mina San Rafael – MINSUR. S. A

    By Juan Lizana

    El presente trabajo describe el proceso del sistema de gestión estratégica en la mina San Rafael, Puno. En este sentido, la empresa como parte introductoria de sus operaciones, ha propuesto la solució

    Sep 12, 2005

  • SME
    Conceptual and Geometric Design of Steep Slope Contour Mining

    By John H. Gasper

    The success of steep slope (>20°) contour mining depends on many factors. Most important is the selection of the mining method that best suits the premining site conditions environmentally and economi

    Jan 1, 1991

  • SME
    The Outlook For Mica

    By S. A. Montague

    In spite of the many new insulating materials, both synthetic and manufactured, that have been put on the market since the end of World War II, and notwithstanding the many millions of dollars applied

    Jan 1, 1962

  • SME
    Development Of A High Blow Energy Hydraulic Impactor

    By Wm. Ross Wayment, Innes P. Grantmyre

    INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor

    Jan 1, 1976

  • NIOSH
    RI 3468 Chemical Considerations Relating To Fires In Anthracite Refuse ? Introduction (1067f50f-d311-4814-b182-e930b23927c4)

    By G. W. Jones

    Fires in anthracite refuse banks are troublesome and may become exceedingly costly to combat. Instances are known in which refuse-bank fires have grown to such magnitude that entire mining properties

    Jan 1, 1939

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • SAIMM
    Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And Limitations

    By Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju

    High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe

    Jan 1, 2007

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959