Search Documents

  • CIM
    Geostatistical simulation of optimum mining elevations for nickel laterite deposits (b9d9907f-58af-4f31-a4f0-796631528f37)

    By J. A. McLennan, J. M. Ortiz

    Nickel laterite deposits are typically formed from tropically weathered mafic-to-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular doz

    Jan 1, 2006

  • AUSIMM
    Textures of Some Copper-Bismuth Sulphide Ores From Mount Ellison, N.T.

    Prominent among the ore minerals at Mt. Ellison, in the Brock's Creek district, Northern Territory, are a number of copper-bismuth sulphides wittichenite, aikinite, emplectite, in association wit

    Jan 1, 1963

  • AUSIMM
    The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR

    By A Hoyle, P Walker, D Bennett

    The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent

    Sep 7, 2015

  • SAIMM
    Improved Technologies In Longhole Blast Hole Drilling, Applied To Drop Raising And Longhole Stoping As Well As The Application Of A Small Twin Boom Mechanized Drillrig

    ?Longhole blast hole drilling? techniques are not new to the mining industry. Appropriate mechanization and improvement of the techniques and application has evolved from the industry requirements. T

    Jan 1, 2003

  • SAIMM
    Hydrometallurgical Treatment Of Haib Copper Ore

    By W. J. Schlitt

    The Namibian Copper Joint Venture has been formed to undertake development of the Haib copper deposit, one of the largest undeveloped copper resources in Africa. The development programme includes ext

    Jan 1, 1999

  • SME
    Shield Tunneling in Pure Sands - Merging the Application Fields of EPB and Slurry Shield Technologies

    By Carlos Henrique Turolla Maia, Ulrich Maidl, Marc Comulada, Julio Claudio Di Dio Pierri

    "Pure sands are typically the domain of slurry shields due to their high permeability and their granular characteristics. However, the Earth Pressure Balanced (EPB) shield machine technology has advan

    Jan 1, 2016

  • ISEE
    Quarry Blast Permitting in the Urban Environment

    By Chris Breeds, Ken Johnston, Omar Fulton

    This paper describes the process typically involved with obtaining permits for quarry blasting in urban, suburban, and rural areas, including: content of SEPA (State Environmental Policy Act) driven d

    Jan 1, 2003

  • SME
    A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25

    By R. C. Milici

    Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from

    Feb 24, 1997

  • NIOSH
    IC 8285 Water Use In The Mineral Industry - With Appendix On The Projection Of Crude Material To 1985 By Barbara S. Lloyd (de51b37a-b6c5-4307-a7c1-7d3ce1692536)

    By Alvin Kaufman

    To aid industry and Government in planning water developments the Bureau of Mines in 1963 canvassed mineral producers to determine water use in 1962. Water use by the mineral industry comprises on

    Jan 1, 1966

  • SAIMM
    Location Of Seismic Events At Kusasalethu Mine Using A Layered Velocity Model

    By D. B. Rebuli

    Seismic networks in deep gold mines of South Africa are often planar owing to the tabular geometry of the orebody and, therefore, the mining infrastructure. Consequently, seismic event locations are p

    Jun 1, 2013

  • NIOSH
    RI 2272 Fourth Semi-Annual Motor Gasoline Survey

    By N. A. C. Smith

    The Bureau of Mines motor gasoline surveys have been conducted in January and July, during 1920 and 1921. The Bureau has obtained and analyzed samples of gasoline representative of that marketed in th

    Jan 1, 1921

  • AIME
  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • SAIMM
    Labour?s Utilization And Labour?s Productivity Of A Gold Mine In Saudi Arabia

    By M. S. M. Aljuhani

    In this paper, one of the human factors that affect productivity in an underground gold mine in Saudi Arabia was investigated and analysed for the purpose of improving productivity. The human factor t

    Jan 1, 2002

  • SME
    Resource companies must preserve capital while gaining operational efficiency

    By Adam H. Zimmerman

    Introduction Noranda, like similar businesses, is suffering the pain of previously unheard of currency relationships, a cost structure built in better days, and conditions of gross oversupply possibl

    Jan 6, 1985

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SAIMM
    Feasibility of recovering metals from associated slags

    By M. Wang, Z. Sui, T. Lou

    After smelting, the associated mineral ore accompanying Valuable Metal Compounds (VMC),such as titania and borate in BF., most of the VMC were separated from the metal into the molten slag that is an

    Jan 1, 2004

  • SAIMM
    Critical Factors For Sustainable Social Projects

    By C. S. Chenga

    Sustainable development is currently an extremely relevant concept worldwide, especially in developing countries like South Africa. Mining and metals companies are also directly affected by the sustai

    Jan 1, 2006

  • AUSIMM
    The Failure of Lead by Creep

    From time to time lead, which is normally considered to be a soft ductile metal, fails by cracking. The cracks which form appear to be of two distinct types-(a) those which follow a zig-zag course aro

    Jan 1, 1935

  • NIOSH
    OFR-114-93 Ecosystem Management And Mine Permitting In Alaska

    By Patrick D. Plumb

    The Juneau Office of the U.S. Bureau of Mines has undertaken a study of the environmental permitting process for major mines in Alaska to identify the effects ecosystem management has had or could hav

    Jan 1, 1993