Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Analysis of Progressive Seismicity and its Correlation with Geotechnical Variables at the El Teniente MineBy A Brzovic, E Córdova
In an underground mine, different mining activities such as undercutting and cave progression generate redistribution in the present in situ stress field, and these changes are represented in the rock
May 9, 2016
-
The evolution of cut-and-fill mining techniques at the Inco Limited Levack Area minesBy D. M. May
"Cut-and-fill mining is a stoping method that has been widely utilized in the mining industry over the past forty years. It took preference over shrinkage methods at Levack in the early 1930sbecause o
Jan 1, 1981
-
La aplicabilidad de la administración por procesos en la unidad RauraBy Héctor Quispe
El presente trabajo señala la aplicacíón de las estrategias en Sistema de Gestión de la producción en la mina Raura, de forma que mejore su administración de flujo de recursos y actividades para logr
Sep 13, 2001
-
The Golden Cross Project, Mill Closure, Mine Rehabilitation and Drainage ContractThe Golden Cross project was a joint venture between Coeur NZ Ltd (80 per cent) and Viking Mining Company (20 per cent). The site is located in the Waitekauri Valley, 8 km north-west of Waihi, on the
Jan 1, 2002
-
Selenium And Arsenic Removal From Mining WastewatersBy Phil Pennington, D. Jack Adams
Mining and processing of minerals, metals, and fossil fuels can release selenium and arsenic into wastewaters. Both selenium and arsenic are difficult to remove to levels that meet current drinking w
Jan 1, 2005
-
Minerals Beneficiation - Physical Chemical Aspects of Flocculation by PolymersBy R. B. Booth, W. F. Linke
The continuous interest of the American Cyanamid Company in producing superior polymeric flocculants and dispersants for the mining industry has resulted in a broad, general study of the physical chem
Jan 1, 1961
-
Role Of The Tunneling MachineBy William H. Hamilton
INTRODUCTION It was not very many years ago that tunneling machine manufacturers spent considerable time trying to convince contractors and mine operators of the advantages of mechanical tunnel bor
Jan 1, 1997
-
Design and Commissioning of the Ridgeway ConcentratorBy B Clemen, D Gordon, F Cesnik, P Griffin
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm
Jan 1, 2003
-
Micropiles At The Transformation Ago ProjectBy Jim Bruce
The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.
Jan 1, 2011
-
Hot Corrosion Behaviour Of Pt-Alloys For Application In The Next Generation Of Gas TurbinesBy M. Stephton, L. A. Cornish, R. Süss, N. B. Maledi, J. H. Potgieter, L. Chown
In today?s gas turbines, the emphasis is on saving energy and reducing the amounts of pollutants emitted. This can be attained only by designing alloys with higher melting points and the capability to
Jan 1, 2006
-
An Applications Approach To Barrier Pillar Design For Improved Resource RecoveryBy John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989
-
RI 5914 Engineering Study Of Water Injection In 14 Oil Reservoirs Of North Louisiana ? SummaryBy Paul Meadows
This Bureau of Mines report presents operating practices and results of pressure maintenance and secondary recovery by water injection or by water injection supplemented by gas injection. Particular e
Jan 1, 1962
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
The Australian Equity Market as a Source of Capital for Pacific Basin Mineral DevelopmentOne of the major changes in the resource industry in the nineties has been the re- internationalisation of the industry. The history of the resource business has been one of companies from the develop
Jan 1, 1995
-
Magnetite Behaviour In Peirce Smith Converters Slag At Ilo Copper Smelter Plant, PeruBy M. Sanchez, C. Morales, J. Palacios
The slag produced in the Peirce Smith converters at the Ilo smelter of Southern Peru Copper Corporation has shown a wide range of magnetite content, which introduces an additional problem in the smelt
Jan 1, 2004
-
MLA 15-94 - Mineral Resource Assessment For The BLM Malheur-Jordan Resource Areas, Oregon - Volume 2By Joseph Gersic
MINFO has been developed to serve as a frontend for three databases created to store basic minerals information gathered during the minerals resource assessment conducted by U.S. Bureau of Mines(USBM)
Jan 1, 1994
-
OFR-89-77 Hoist Radio System For Deep ShaftsBy Joseph A. Vanous
The inductive communication system was developed under this contract for use in the hoist of deep mines. This program was a four phase program with experimental dual frequency equipment resulting from
Jan 1, 1976
-
Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New ZealandBy R H. Sibson
The gold
Jan 1, 1995
-
Some Observations in Heat Treatment of Muntz MetalBy L. Russell Van Wert
DURING an investigation in which the solubility relations of the phases in Muntz metal (60 per cent. copper, 40 per cent. zinc) were under study, certain phenomena that had no immediate connection wit
Jan 1, 1929
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999