Search Documents

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1980

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • NIOSH
    Subsidence Prediction Using a Laminated, Boundary-Element Program

    By Keith A. Heasley, Timotlly M. Barton

    Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • IOM3
    Mine backfilling to limit surface subsidence: a case history

    By P. H. Carr, G. G. Marino, K. A. Patel

    Extensions to a correctional institution at Wabash Valley, Indiana, required development over abandoned coal-mine workings, at 90 m depth, where subsidence was possible at surface. Backfilling of the

    Jun 19, 1905

  • CIM
    Innovative management techniques at Kiena Gold Mines Limited

    By Brian A. Ferguson, Raynald O. Vezina, Marielle Gaudet, Raoul R. Boissonneault

    "Kiena has been committed to developing a fresh management and employee relations approach since the commencement of production in 1981. The functional organizational structure encourages joint partic

    Jan 1, 1987

  • AUSIMM
    Development of an On-Site Mineralogy Solution for Metallurgists

    By D van der Wal, R Dobbe, K Moeller

    "Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s

    Jul 15, 2013

  • AUSIMM
    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Wetting Characteristics of Mineral Surfaces - Contact Angle Measurements through Molecular Dynamics Simulations

    Sep 13, 2010

  • SAIMM
    Coated Gold - Its Contribution To Gold Losses In Gold Plant Residues

    By A. H. Mokken

    Failed attempts at amalgamation of a gold/osmiridium concentrate, recovered behind pebble mill liners during re-lining, led to the discovery that the gold particles were coated and that nitric acid on

    Jan 1, 1999

  • NIOSH
    IC 8304 Technology And Use Of Lignite - Proceedings: Bureau Of Mines-University Of North Dakota Symposium, Bismarck, N. Dak., April 29-30, 1965

    The 1965 Lignite Symposium, the fourth in a series and the third sponsored by the University of North Dakota and the Bureau of Mines, was held at Bismarck, N. Dak., on April 29-30, 1963. Them 7 sympos

    Jan 1, 1966

  • AUSIMM
    Hot Dip Tinning Operations at Port Kembla

    A commonplace, sometimes overlooked or taken for granted, article of everyday existence is the tin can. Produced from thin gauge low carbon steel, and commonly coated with a mere 60 millionths of an i

    Jan 1, 1958

  • AUSIMM
    Gold Mining in Australasia - Past and Present and Exploration Opportunities to the Year 2000

    Being a geologist I intend describing the renaissance of the gold industry in Australia within its geologic framework; there is a geological pattern to the numerous gold projects which have been broug

    Jan 1, 1990

  • NIOSH
    RI 3073 Extraction of Soluble Copper from Ores in Leaching by Percolation

    By Kenneth O. Bayard, John D. Sullivan

    "This repot continues the series of papers being prepared at the Southwest Experiment Station of the Bureau of Mines in cooperation with the department of mining and metallurgy, University of Arizona,

    Apr 1, 1931

  • SME
    Jabali / Yanbu – A New Source Of Zinc In The Middle East (fe9d2734-cc3c-4ef2-b8ec-54ed953ef19a)

    By K. M. Stone, N. J. G. Masson, A. C. Woollett

    The Jabali zinc deposit, in Yemen, contains at least 9.4 Mt at a grade of 10.7% zinc, 2.2% lead and 77g/t silver. The zinc occurs as smithsonite with minor hydrozincite. The Jabali ore does not produc

    Jan 1, 2002

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • DFI
    Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary

    By Lucien P. Weber

    Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an

    Jan 1, 1997

  • CIM
    Semi-Autogenous Grinding Circuit Reduces Capital Costs

    By H. C. Counsell, R. Webber

    "The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,

    Jan 1, 1984