Search Documents

  • AUSIMM
    Three case studies on the implementation of new technology in the mining industry

    By A T. Job, P R. McAree

    There is significant value at stake in the mining industry from the implementation of new technologies that support the enhanced profitability and sustainability of mines. However, in order to realise

    Jul 24, 2017

  • CIM
    Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTS

    By Phillip J. Mackey, Gerardo R. F. Alvear F.

    It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to

    Jan 1, 2014

  • DFI
    Embankment Piles ? Introduction

    By B. B. Broms

    Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described

    Jan 1, 2010

  • DFI
    Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical Garden

    By David C. Kraft

    Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped

    Jan 1, 2011

  • SAIMM
    The Influence Of Mn On The Tensile Properties Of SSM-HPDC Al-Cu-Mg-Ag Alloy A201 - Synopsis

    A201 aluminium alloy is a high strength casting alloy with a nominal composition of Al-4.6Cu-0.3Mg-0.6Ag. It is strengthened by the O(Al2Cu) phase and the ??(Al2Cu) phase during heat treatment. Furthe

    Jan 1, 2011

  • AIME
    Geology - The Need of a New Philosophy of Prospecting, 1960 Jackling Lecture (Mining Engineering Jun 1960, pg 570)

    By L. B. Slichter

    Prospecting is certainly the world's biggest and best gambling business. It is a game where the chips cost many thousands and where many millions, even billions, can be won. An attractive feature

    Jan 1, 1961

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SME
    Industrial Minerals 2004 – Calcium Carbonates

    By J. Yuan

    Ground calcium carbonate (GCC) and chemically precipitated calcium carbonate (PCC) have become important mineral-based commodities in recent years. GCC manufacturing generally requires high purity and

    Jan 1, 2005

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    Assessing the Performance and Efficiency of Fine Grinding Technologies

    By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux

    "The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp

    Jan 1, 2006

  • IOM3
    Geochemistry of the British Caledonides: the setting for metallogeny

    By D. M. A. Flight, P. M. Green, J. A. Plant, P. R. Simpson

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. The British Geological Survey's regional geochemical database is used to i

    Jun 19, 1905

  • TMS
    Fluid Flow And Transport Phenomena During Steel Refining And Casting Process

    By Lifeng Zhang

    The transport of fluid, heat ,and particles (bubbles and solid inclusions) in flowing molten steel is investigated in steel refining ladles, the continuous casting tundish, continuous casting mold and

    Jan 1, 2006

  • CIM
    Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral Processors

    By D. M. Doyle

    "The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this

    Jan 1, 1974

  • AUSIMM
    Considerations for Effective Gold Process Development

    By A Giblett, R Dunne, D Appelhans

    There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be

    Jul 15, 2013

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • SAIMM
    A Case Study On The Operation Of A Flottweg Tricanter® Centrifuge For Solvent-Extraction Crud Treatment At Bwana Mkubwa, Ndola, Zambia

    By Gift Chisakuta, Bravo Mbao, Nils Schwarz, Angus Feather, Anthony Mukutuma

    Bwana Mkubwa is a 50 000 tons per annum copper cathode producer, owned by First Quantum Minerals and located in Ndola, on the Zambian Copperbelt. The Bwana Mkubwa solvent-extraction circuit was starte

    Jan 1, 2007