Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984

  • SME-ICGCM
    Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt Mine

    By David B. Plumeau

    The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv

    Jan 1, 1981

  • SME-ICGCM
    Design Considerations of the Secondary Roof Support for Longwall Tailgate Entries

    By Jinsheng Chen

    To maintain the stability of longwall tailgate entries, they have to be supported by not only the primary roof support but also the secondary roof support due to the impact of the longwall mining¬indu

    Jan 1, 2003

  • SME-ICGCM
    Evaluation of the Point Load Strength for Soft Rock Classification

    By B. (Mamas) Das

    A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech

    Jan 1, 1984

  • SME-ICGCM
    Engineering Methods For The Design And Employment Of Wood Cribs

    By Thomas M. Barczak

    Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c

    Jan 1, 1993

  • SME-ICGCM
    Mathematical Modeling Of Strong Roof Beds In Longwall Mining

    By Xiaolin Wu

    Most coal bump occurrences in the U.S. are directly related to mining operations under strong roofs. An understanding of the behavior of bridging or cantilevering strong roofs over working longwall fa

    Jan 1, 1993

  • SME-ICGCM
    Time-Dependent Analysis Of Underground Opening Stability

    By Changshou Sun

    Excessive deformation occurred in the underground openings of Jinchuan Nickel Mine, the largest nonferrous underground mine in China. Developed in weak rock formations at great depth, the underground

    Jan 1, 1999

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Mechanism of Strata Pressure Characteristics and Its Control Techniques in Faulted Areas Subjected to Longwall Mining

    By Ke Yang

    "Engineering practices have shown that the skip-fault longwall mining is frequently used when faults with offsets larger than 1 Om are present. Since the skip-fault longwall mining not only reduces th

    Jan 1, 2016

  • SME-ICGCM
    Enlightening Bolts: Using Distributed Optical Sensing to Measure the Strain Profile along Fully Grouted Rock Bolts

    By Andrew Hyett

    Over the last 30 years, a transition away from end-anchored bolts to fully grouted rock bolt systems has occurred in many underground mines. It seems geomechanically intuitive that the success of such

    Jan 1, 2013

  • SME-ICGCM
    Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)

    By Ross W. Seedsman

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume

    Jan 1, 1992

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME-ICGCM
    Three-Dimensional Analysis Of Mine Dump Point Stability

    By Radoslaw L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li

    Jan 1, 1990

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Multi-Scale Assessment Of Coal And Gas Outbursts Based On Fractal Measurements

    By Mingju Liu

    In this research, we measured fractal characteristics of over ten typical outburst areas on different scales and related them to their outburst proneness, in attempts to provide new methods for outbur

    Jan 1, 2000

  • SME-ICGCM
    Computer Modeling Of Yield Pillar Behavior Using Post-Failure Criteria

    In this paper, the plastic increment theory was applied in a 2-D finite element model, and a generalized Von Mises yielding criterion adopted to simulate the progressive failure of coal pillars. Exten

    Jan 1, 1988

  • SME-ICGCM
    Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel Floor

    By Hideki Shimada

    In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior

    Jan 1, 2002

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected Examples

    By Axel Preusse

    To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem

    Jan 1, 2000