Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience And Guidelines

    By Mao Bai

    Mining in situations where there exists a potential hazard from inundation has always existed in coal mining, and often reserves were left unmined in favor of reserves with no such hazard. However, in

    Jan 1, 1995

  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    Coal Bursts That Occur During Development: A Rock Mechanics Enigma

    By Christopher Mark

    Coal bursts are typically associated with highly stressed coal. Most bursts occur during retreat mining (longwall mining or pillar recovery) in highly stressed locations like the tailgate corner of th

    Jan 1, 2017

  • SME-ICGCM
    SOMA: A New Method to Calculate the Operative Stress Field: Results from the Laurel Mountain Mine, Russell Co., Virginia

    By Craig Byington

    The stress-field orientation mapping and analysis (SOMA) technique for determining the operative stress field near mine workings and its relationship to various fracture sets is described using Dicken

    Jan 1, 2004

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Remote Control Roof Bolting

    By Cosmo P. Fazio

    Remote control roof bolting is approaching reality with the continued improvement of a number of components and subsystems being developed by The Bendix Corporation under sponsorship of the U.S. Burea

    Jan 1, 1982

  • SME-ICGCM
    In Situ Strength Testing of Rocks with the Borehole Penetrometer

    By Kot F. von Unrug

    One of the major difficulties in the proper characterization of rocks surrounding excavations is the lack of data. The existing method for strength determination requires core drilling for sample coll

    Jan 1, 1998

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar Mining

    By Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady

    "A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou

    Jan 1, 2015

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Geotechnical Aspects of Subsidence over Room and Pillar Mines in Illinois

    By Gennaro G. Marino

    Site conditions at several shallow room and pillar mines in Illinois are described and compared with the charac¬teristics of the subsidence profiles at the ground surface. The shape and magnitude of t

    Jan 1, 1984

  • SME-ICGCM
    Calibrating LaModel for Subsidence

    By Keith A. Heasley, Jian Yang

    "LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He

    Jan 1, 2016

  • SME-ICGCM
    Validation of Entry Stability Factors Determined By the Strength Reduction Method Against Empirical Approaches

    By Gabriel S. Esterhuizen

    The design of support for underground excavations is a complex process in which the interaction between supports and the rock mass must be evaluated. The strength reduction method (SRM) is useful beca

    Jan 1, 2013

  • SME-ICGCM
    36 Years of Subsidence Reporting at the ICGCM

    By Nicole E. Evanek, Anthony T. Iannacchione

    "Over the past 36 years, a great deal of information has been presented and discussed at the International Conference on Ground Control in Mining (ICGCM). The topic of surface subsidence engineering h

    Jan 1, 2018

  • SME-ICGCM
    Empirical and analytical design of large openings at a proposed national underground science laboratory

    By Karl Jr. Zipf

    The famous Homestake gold mine in Lead, SD. closed recently alter 125 years of operation. However, the mine may receive a new lease on life as a National Underground Science Laboratory (NUSL) supporte

    Jan 1, 2002

  • SME-ICGCM
    The Impact Of Variability In Coal Strength On Mine Planning And Design - A Case History

    By David A. Newman

    Strength and physical property testing of coal is conducted regularly by the Arch Mineral Corporation as part of reserve exploration. Pillar design and mine layout are the primary applications for the

    Jan 1, 1993

  • SME-ICGCM
    Coping With High Lateral Stresses In An Underground Illinois Coal Mine (Inland Steel Coal Capany, Mine #2)

    By C. Tom Blevins

    The purpose of this paper is to discuss production and roof control problems associated with directional lateral stresses in an in situ stress field and the approach that Inland Steel Coal Company mad

    Jan 1, 1982