Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilled Shaft Construction At Crownpoint, New MexicoBy Hassell E. Hunter
The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr
Jan 1, 1983
-
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 MonthsBy Antonio Raschillà
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p
-
Case History Of The Wachovia?Knight Theater Pedestrian TunnelsBy Eric Eisold
The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea
-
Processing of Banded Hematite Quartzite Ore for Recovery of Iron Values Mining, Metallurgy and Exploration (86b8819b-6b05-4951-9ba6-26bcd1fd2904)By Nikhil Dhawan, Veeranjaneyulu Rayapudi
This study investigates upgrading of low-grade banded hematite quartzite iron ore (Fe ~31%). Conventional beneficiation was found to be futile. The susceptibility of iron phases to microwave exposure
-
Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake MineBy Z. J. Hladysz
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda
Jan 1, 2011
-
Lessons Learned From Mineral Appraisal With Subsequent Market Sale ? IntroductionBy M. L. Chapman
When originally accepting the assignment, the Client had described the property as vacant land. A prior appraisal was later discovered and revealed that the property included a mineral rights apprais
Jan 1, 2012
-
A Case Study of Geological Characterization of Co-rich Ferromanganese Crusts over a Giant Guyot "Takuyo No.5," the Northwestern PacificBy H. Sato, B. Thornton, K. Nishi, A. Usui
"Northwestern Pacific submarine seamounts are believed to be future marine mining areas of ferromanganese crusts, which contain hi-tech industrial metals, such as Co, Ni, Te, Ti, Pt, and REEs. The Tak
Sep 1, 2014
-
Design And Construction Of Norad Expansion Project "Excavation Phase"By Gerald G. Griswold, Allan G. Provost
INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin
Jan 1, 1979
-
Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in SingaporeBy K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai
The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa
Jan 1, 2001
-
Productivity Gains Using A Computer-Aided Earthmoving System On A Track-Type DozerBy D. R. Gagnon
Mining companies are continually looking for product-ivity and efficiency improvements with their equipment to reduce operating costs. This paper will review the results of a productivity analysis co
Jan 1, 2002
-
Occurrence of ferromanganese crusts at the margin of the summit of a guyot: results from geophysical and geological observationBy Hyung Jeek Kim, Jongmin Joo, Jonguk Kim, Jai-Woon Moon, Kyeong-Yong Lee
"Co-rich ferromanganese crusts (Fe-Mn crusts) distributed on seamounts in the western Pacific are potential economic resources for cobalt, nickel, platinum, and other rare metals in the future. Evalua
Sep 1, 2014
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
Alaska Way visit highlights Megaprojects conference in SeattleWhen defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,
Dec 1, 2013
-
Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case StudyBy Kevin Andrews, Terry Hamric, Scott Nelson
"Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini
Jan 1, 2019
-
New Developments In Ground Support Technology For Open-Type Tunnel Boring MachinesBy Steve Chorley
Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good
Jan 1, 2011
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Small footprint, big challenges: Design and construction of the Allen Park storage tunnelBy Brain E. Gombos
The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary
Jan 1, 2013
-
Geology of the Brewer Gold Mine in South CarolinaBy W. Scheetz
The Brewer Gold Mine is an open-pit, heap leach operation that processes about 122 kt/m (135,000 stpm). The mine is operated by Brewer Gold Inc., a subsidiary of Westmont Mining Inc., and is located n
Jan 1, 1991
-
Large diameter tunneling in Seattle is a sign of things to comeBy Christopher Bambridge
The Washington State Department of Transportation (WSDOT) is constructing a new tunneled route under Seattle to replace the existing State Route 99, Alaskan Way Viaduct (AWV), which follows the histor
Sep 1, 2013
-
Single Bore Solution For Transit TunnelsBy Verya Nasri
The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is
Jan 1, 2010