Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Parametric Estimation of Capital Costs for Establishing a Coal Mine: South Africa Case StudyBy C. Musingwini, M. Mohutsiwa
"SynopsisCapital cost estimates are important in decisions on whether a project will be approved, mothballed, or abandoned. In South Africa, junior coal miners do not have extensive databases of histo
Jan 1, 2015
-
Analysis of the Effect of Ducted Fan System Variables on Ventilation in an Empty Heading Using CFDBy T. Feroze, B. Genc
"The effect of some of the system variables in forcing and exhausting ducted fan systems on ventilation in an empty heading was investigated using computational fluid dynamics(CFD) and comparative ana
Jan 1, 2017
-
Stochastic analysis of dig limit optimization using simulated annealingBy M. S. Shishvan, J. R. van Duijvenbode
The results of dig limit delineation in open pit mining are never truly optimized due to gaps in the underlying data, such as insufficient sampling. Aside from the data uncertainty, there is also an i
Dec 13, 2022
-
Investigation of Cavity Formation in Lump Coal in the Context of Underground Coal GasificationBy C. Hsu
Underground coal gasification (UCG) is becoming more popular as the reserves of good quality, mineable coal are starting to diminish, and yet the global energy demand from coal is still increasing. Th
Jan 1, 2014
-
Identification of cost factors relating to mining incidentsBy E. P. Preis, R. C. W. Webber-Youngman
The real cost of any mining incident has, empirically, proven to be estimation-driven, rather than factdriven. One of the main reasons for this lies with the complexity of the cost composition of any
Jan 1, 2021
-
Determination of the optimal transition point between a truck and shovel system and a semi-mobile in-pit crushing and conveying systemBy M. Shamsi, M. Nehring
One of the most challenging aspects in semi-mobile in-pit crushing and conveying (SMIPCC) system design is determining the optimum depth at which to change from a purely truck-based haulage system to
Sep 1, 2021
-
The Influence of Selected Biomass Additions on the Co-Pyrolysis with an Inertinite-Rich Medium Rank C Grade South African CoalBy T. Z. Sehume, J. R. Bunt, J. C. van Dyk, C. A. Strydom
"SynopsisCo-pyrolysis of four biomass samples (hardwood chip, softwood chip, pinewood chip, and sugarcane bagasse) with an inertinite-rich medium rank C South African coal was investigated. Proximate
Jan 1, 2015
-
Presidential Address The energy requirements of the mining and metallurgical industry in South AfricaBy P. R. Jochens
South Africa depends to a considerable measure on the exploitation of mineral reserves and the processing of these minerals. One of the prime requirements for the mining and metallurgical industry to
Jan 1, 1980
-
Flowsheet development for the Sukari gold project in EgyptBy M. Rhodes
The Sukari project, which is owned by Centamin Egypt Ltd, is located in southern Egypt, 770 km south of Cairo but close to the Red Sea. The project is the first new gold development in Egypt and was c
Jan 1, 2009
-
Chemical and phase chemical characterisation of three different tap-hole clays, I.C. Thobadi, M. Mnisi, J.D. Steenkamp, E Matinde, W. ClarkBy E Matinde, M. Mnisi, I. C. Thobadi, W. Clark, J. D. Steenkamp
Pyrometallurgical smelters utilise tap-holes, through which liquid metal, matte and/or slag are tapped at regular intervals. However, tap-hole failures can have a devastating impact on smelters, which
Jan 1, 2020
-
Employee engagement among women in technical positions in the South Africa mining industryBy N. Mashaba, D. Botha
The aims of this study were to investigate the factors that influence women’s engagement in technical positions in the South African mining sector and to determine what could be done to promote their
Nov 6, 2023
-
Prediction of ground vibrations induced by bench blasting using the random forest algorithmBy R. Nyirenda, B. Besa, N. Dzimunya
The accurate estimation of peak particle velocity (PPV) is crucial during the design of bench blasting operations in open pit mines, since the vibrations caused by blasting can significantly affect th
Mar 30, 2023
-
Digital Transmission of Climatic Data from Underground to SurfaceBy R. Pipeleers
Recent experience has shown that all underground workplaces in the Campine Coalfield in Belgium will require controlled cooling within three years. Considering the socio-economic and legal importance
Jan 1, 1987
-
Notices (6fcffb5a-0133-4dae-8cf0-7c058922aac3)International Solvent Extraction Conference 1971 ISEC '71, which will be held in The Hague, The Netherlands, from 18th to 23rd April, 1971, is being sponsored by the Society of Chemical Industr
-
Contributions to the paper 'Uneconomic gold production in South Africa'By H. L. Monro
Contribution by B. K. Martust I congratulate the author on his interesting paper. In my view, the establishment of the level at which South African gold output is at some kind of optimum is an interes
Jan 1, 1984
-
Calcination Characteristics Of Laterite Ores From The Central Region Of Anatolia ? SynopsisBy E. Keskinkilic
Drying, calcination, prereduction, and smelting are the main steps in conventional crude ferronickel production. Industrially, these steps are conducted using the rotary kiln-electric arc furnace (RKE
Jan 1, 2012
-
Sonic Injection in Sulphide Bath Smelting: An UpdateBy J. P. T. Kapusta
"The copper smelting industry faces increasingly stringent environmental regulations and must continue driving innovation to reduce energy usage in its production chain. With the coming of age of ‘bot
Nov 1, 2018
-
Feasibility study of replacing bottom dump trucks with rear dump trucks at Kleinkopje colliery - SynopsisBy T. Tamenti
The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi
Jan 1, 2007
-
The Application Of Facies Classification In Evaluating The Merensky Reef At Bafokeng Rasimone Platinum Mine, South AfricaBy K. G. Lomberg, M. D. Lionnet
The Bafokeng Rasimone Platinum Mine (BRPM) is a joint venture between Rustenburg Platinum Mines Limited and Royal Bafokeng Resources (Pty) Ltd (Bafokeng). The mining lease has been granted over Boschk
Jan 1, 2006
-
Reclamation And Environmental Management In Dimension Stone MiningBy I. Ashmole
From the point of view of the environmental impact created, dimension stone mining is a relatively benign industry. There are no emissions besides those of the diesel powered earthmoving equipment uti
Jan 1, 2008