What You Always Wanted to Know About Blast Waves in Blocky BenchesBy Hans-Peter Rossmanith
Fracture mechanics (Atkinson 1987, Broek 1988, Rossmanith 1978-2002, 1983, 1997, Kanninen & Popelar 1985) and wave propagation (Graf 1975, Rinehart 1975) form the main ingredients in the new electroni
Jan 1, 2004
-
Blast Designs to Achieve a Plant Tonnage Goal in a New MineBy Cristian Rodriquez, Fernando Fernandez, Rodrigo Fuentealba, Tom BoBo, Maria Rocha, John Kemeny
This paper describes a case study that was conducted at a new mine in South America. This mine has significant geologic variations that will result in different distributions of hard and soft ore bein
Jan 1, 2015
-
Using Uniformly-Sequenced MS Delay Periods To Reduce Vibration from Quarry BlastingBy A B. Jr Nunn, W C. Gould
Good community relations is a major concern at this central Virginia aggregate quarry. In this paper, the authors describe the use of a new electric millisecond delay initiation system that has reduce
Jan 1, 1986
-
Urban Tunneling for the MWRA's Boston Harbor Clean UpBy Gordon C. Petersen, Gary A. Almeraris
This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe
Jan 1, 1991
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power PlantBy Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
Physics Based 3D Rock Blast Movement ModellingBy THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds
An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en
Jan 26, 2026
-
Diamonds are a Driller's Best FriendBy Langdon T. Mitchell, Karl Ingmarsson
The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.
Jan 1, 1999
-
Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading SystemBy Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores
Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in
Feb 6, 2023
-
Recent Projects - Emergency Bridge BlastingBy Brent Blanchard
As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur
Jan 1, 2003
-
Analysis of Sympathetic Detonation in Detonating CordBy Josh Calnan, Paul M. Holmgren, Abigail N. Styer
Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN
Feb 1, 2020
-
Efficient Blasting for Bench Stability and Fragmentation Results ImprovementBy Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda
Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro
Feb 6, 2023
-
The Specifications said No BlastingBy Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz
This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci
Jan 1, 2012
-
Slope stability through the application of low-energy explosives technologyBy Jorge Cárdenas, Diego Gamarra
In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they
Jan 21, 2025
-
Moving 50’(15.3m) of Burden with a 4½” (115mm) HoleBy Keith Henderson
An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall
Jan 1, 2012
-
Challenges and Lessons Learned from the Kentucky Lock ProjectBy K. Best, D. Conn
The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic
Jan 1, 2024
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive GroundBy K. Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 1, 2024
-
Detailed Planning Underscores Expansion of Vulcan's Chattanooga QuarryBy R L. Mayville
The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse
Jan 1, 1984
-
Numerical Study on Controlled Blasting by Pre-cracked NotchBy Kwang-Yeom Kim, Dong-Gyou Kim, Hyo-Kwan Yoon
This study was intended to simulate the blasting model using notched-hole with numerical approach. Numerical analysis approach was applied to compare and evaluate the blasting model using notched-hole
Jan 1, 2010
-
Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement ManagementBy Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus
Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan
Jan 21, 2025
-
Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable LayerBy Ye Yuan, Jaak Daemen, Shaguo Yuan
ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre
Jan 1, 2010