Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Borehole Pressures in an Air Decked SituationBy W. Fourney
In the late 70’s and early 80’s in conjunction with other oil and gas well stimulation studies, personnel from the Dynamic Effects Lab performed model testing to demonstrate the effectiveness of utili
Jan 1, 2006
-
Construction Blasting in Central OregonBy Paul Schmiesing, Matt Higgins
Central Oregon is a fast growing resort community centered in Bend, Oregon. Bend is bordered by the Cascade Mountains to the west and the high dessert to the east. Central Oregon is blanketed with lav
Jan 1, 2000
-
New Developments in DrillingBy Isaac E. "Chip" Harris
A general understanding is given to how and where blast hole drills are used and what recent developments have taken place with small and large diameter drill hole machines. Indications are that new d
Jan 1, 1979
-
Stemming Technique for Loading Angled Holes Charged with ANFOBy Michael David Wilkins, Paul N. Worsey
Little research has been published on stemming blast holes, particularly what happens during the process. Previous work has concentrated on the performance of the inert material to find the best way t
Jan 1, 1998
-
Low-Frequency Blast Vibrations at a High Water-Table SiteBy Mark S. Stagg, David E. Siskind, Stephen V. Crun, Willard E. Pierce
The USBM is studying the impacts of low-frequency blast vibrations on residences to assess both response and cracking potential. Complementing coal mining sites monitored in the midwest and east, vibr
Jan 1, 1996
-
Application Electronic Initiation System in Hot and Reactive Ground ConditionsBy Muhammad Yamani, Marsell Riviera, Herry Saputra, Rizky Amin
Drill and Blast processes in hot and reactive ground conditions are a severe challenge in mining, especially in the blasting process. Our main objective is safety issues without compromising the blast
Feb 6, 2023
-
Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno NobelBy Tacio Ferreira
A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla
Jan 21, 2025
-
Significant Sources of Error in the Seismograph Error BudgetBy Gregory Lorsbach, Wade Hutchison, Earnest Grigoryan
Comparing measurements from multiple seismographs, particularly when the instruments are deployed in a “side-by-side” situation, is often problematic. Measurements often differ by as much as a factor
Jan 1, 2005
-
Confronting Underground Workings Near Open Pit MinesBy Park McLure, Paul Kunze
Abandoned underground mine workings have been regularly encountered in open pit mining excavations for many years, for the most part without many serious problems resulting. During the last several ye
Jan 1, 1993
-
Blast Damage Claims Evaluation and The Small Engineering FirmBy Mark A. Rugen
It may be difficult to imagine but small engineering companies do exist, even in relatively large cities like San Antonio. Due to the limited capital available for the purchase or use of equipment suc
Jan 1, 1983
-
Anfo Versus 100% Emulsion: Quantitative Assessment of Performance With Constant Drilling and Blasting CostsBy Neal Lee, Braden Lusk, John Silva Castro
One of the most common assumptions regarding the use of ANFO versus utilizing 100% sensitized emulsion is that ANFO “turns over” the muck-pile better, due to the “higher gas volume” supposedly inheren
Jan 1, 2012
-
Minimum Burning Pressures of Commercial ExplosivesBy P. D. Lightfoot, C. Badeen, R. Turcotte, D. E. C. Jones
Following localized (i.e. hot-spot) ignition, there is a minimum pressure required for combustion to propagate in water-based commercial explosives. The latter is usually referred to as the ‘Minimum B
Jan 1, 2004
-
A New Detonating Cord for Reducing Unwanted Damage in Controlled BlastingBy Thomas Bakley, Rob Lee, Jay Rodgers
The present state of technology in Controlled Blasting uses standard explosives’ products to create a crack between holes along a desired line of break. The resulting pre-split, post-shear or cut line
Jan 1, 2001
-
Controlled Excavation at the Trans-Koolau Halawa TunnelsBy Ken Fiorentino, Gordon F. Revey
H3 Tunnelers recently excavated two conventional 48 foot diameter highway tunnels through the Halawa side of the Tran-Koolau Mountains on Oahu. The primary blast design challenge on this Job was minim
Jan 1, 1993
-
Semi-Automated Fragmentation AssessmentBy Glenn Ludwig, Stephen H. Chung
Fragmentation has a direct impact on mine costs and productivity. Computer programs have been developed to calculate fragmentation using data on the properties of the explosive, the characteristics of
Jan 1, 1992
-
Ground Vibration Effects on StructuresBy David E. Siskind
U.S. Bureau of Mines Report of Investigation 8507 was published in 1980. In a comprehensive analysis of all known blast damage studies plus new definitive data, the USBM authors adopted new safe level
Jan 1, 1998
-
Work Principle For Predicting Explosive Toxic FumesBy Michael S. Wieland
The work-principle method was developed for theoretically resolving toxic fumes from non-ideal charge formulations. The whole description of a wanted process refers to macroscopic changes resulting fr
Jan 1, 1998
-
The Large Chamber Test for Toxic Fumes Analysis of Permissible ExplosivesBy Dennis J. Viscusi, James H. III Rowland, Lon D. Santis, Mark H. Weslowski
This paper describes the procedure for analysis of toxic fumes from the detonation of high explosives using the Large Chamber at the U.S. Bureau of Mines (USBM), Pittsburgh Research Center (PRC). This
Jan 1, 1995
-
Bridge Demolition in an Environmentally Sensitive AreaBy Ron J. Elliott, Corry Coumans
The following is a detailed description of the blasting procedures used in the successful demolition of the Stave River bridge, Mission, British Columbia, Canada. This highway bridge spans a highly se
Jan 1, 1998
-
Selective Mining Using ExplosivesBy R H. Stevenson
This paper deals with a new variation of the cast blasting technique, where-in the object is to cast the economic deposit out front under the overburden, while avoiding dilution from the floor materia
Jan 1, 1991