Integrated Computer Aided Open Pit Design and Planning ?A Case Study?By Oyku Selimoglu
The key to successful mine production plan and subsequent operation is efficient mine layout design and optimization. Pit layout design and optimization allow the delineation and extraction of mineab
May 1, 2007
-
Advanced Control for Column FlotationBy G. A. Kosick, G. S. Dobby
"This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense
Jan 1, 1990
-
Abrasion and Wear in Mills: Use of Rubber and Plastics in Screening Applications and Wear in MillsBy G. R. Brough
"Today it is more important than ever to get the maximum possible return on capital invested in the processing industry. To this end the plant is often operated continuously and the choice of equipmen
Jan 1, 1983
-
Erection and Commissioning Issues for Large Grinding Mill CircuitsBy Randolph R. Dreher, Michael L. Schreder
"In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin
Jan 1, 2001
-
Towards Sustainable Mining?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can
May 1, 2011
-
Benefication of Low Grade Ore at the Detour Lake Mine"The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or
Jan 1, 2016
-
Dynamic Testing of Friction Rock StabilisersA rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens
May 1, 2009
-
Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF concentratorBy Jean-Sébastien Kroll-Rabotin, Éric Climent, Florent Bourgeois
"Falcon concentrators are enhanced gravity separators designed for concentrating fine and ultrafine slurries. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one
Jan 1, 2011
-
The Voisey?s Bay Project2002 ? 2006By Dave Stefanuto
Voisey?s Bay Project Components ? Mine/Mill Port In Labrador ? Mini Plant in Mississauga ? Demonstration Plant in Argentia ? Supply Vessel (Umiak1) ? Transshipment Facility (Quebec) ? Concentr
May 1, 2006
-
Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance AssessmentThe rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca
May 1, 2009
-
Goldstream Concentrator Design and OperationBy Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Remote Real-Time Tire Monitoring in Open Pit MinesBy Joel T. Werner
Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e
May 1, 2002
-
Converting the Key Lake Mill Process for McArthur River Ore"The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri
Jan 1, 2001
-
Matching Motor to Mill Torque with Variable Speed DrivesBy Craig M. Sams
"Variable speed mill popularity has grown during the last 10 years with almost every SAG mill fitted with a variable speed drive. In addition, many of today’s larger ball mills are running a variable
Jan 1, 2007
-
Geostatistical Modeling of McMurray Oil Sands DepositsBy Oy Leuangthong
The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t
May 1, 2004
-
Electric Furnace Off-Gas Cleaning Systems at PT IncoBy Paykan Safe
?? Background ?? WorleyParsons Gas Cleaning ?? PT Inco Smelter ?? Process Design Considerations ?? Furnace Control and Combustion ?? Combustion Chamber ?? Spray Chamber ?? Draft Control ?? Bag
May 1, 2008
-
The Ecstall Story: The Electrolytic Zinc PlantBy Edwin G. Sharp, Frank S. Gaunce, George M. Freeman, Denis J. Kemp, Eric Dulson, Paul Salmon, Ernest R. Hamilton, Carl E. Parden
"THE ECSTALL ZINC PLANT was built for the treatment of the Kidd Creek zinc sulphide concentrates. Construction proceeded throughout 1970-71, with operations beginning in April 1972. The two concentrat
Jan 1, 1974
-
Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and BlastingBy Roy McKinstry, Mark Rantapaa, Thomas Bolles
"More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi
Jan 1, 2004
-
Upgrading of aluminum dross by selective comminution and sizingBy K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri
"Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe
Jan 1, 1987
-
Forage ITH à Haute Pression à la Mine GoldexBy Patrick Frenette
Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s
Feb 1, 2008