    Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)

    By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves

    "The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s

    Jan 1, 2005

  • CIM
    Treatment of Carnallite Potash Ores by Selective Flocculation

    By Samantha Beeson, Collin Poole

    "This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi

    Jan 1, 1997

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    Paste Backfill Bulkhead Monitoring ? A Case Study from Inmet?s Cayeli Mine, Turkey

    The stability of paste fill bulkheads forms an integral part of a successful paste fill system. Bulkheads are constructed at the draw points of open stopes to contain paste fill while the initial pour

    May 1, 2007

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium

    By Chris Fleming, John R. Goode, James Brown

    "Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m

    Jan 1, 2010

  • CIM
    A review of PGE metallurgy highlighting recent process innovations

    By Steve Cole

    "The economic and strategic importance of PGE bearing deposits is fuelling renewed exploration and development efforts in the precious metals mining sector.This paper presents a review of the various

    Jan 1, 2002

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,

    Jan 1, 1982

  • CIM
    The Pebble Copper-Gold-Molybdenum Porphyry, Alaska

    By John G. Payne

    The Pebble deposit contains three contiguous zones. In the Pebble West zone, granodiorite stocks intrude gently warped volcanosedimentary rocks that had been intruded by diorite sills and two felsic i

    May 1, 2006

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill

    By Kim Le Roux

    Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:

    May 1, 2002

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    Reliability and maintainability models for mobile underground haulage equipment

    By L. K. Daneshmend

    "Competitive pressures dictate that the mining industry moves to larger mobile underground haulage equipment with more advanced equipment mechanization, higher levels of autonomous operation of machin

    Jan 1, 2003

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • CIM
    Continuous loading and conveying technology in mining

    By Dale Lens, W. S. (Wayne) Cusitar

    "The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a

    Jan 1, 1987

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009