Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High Performance Synthetic Ropes for Mine Hoisting

    By Allan J. Guse

    The primary limiting factor for hoisting capacity from great depths is the self-weight of the typical steel wire ropes used for mine hoisting. Steel wire ropes possess properties making them very su

    May 1, 2013

  • CIM
    Human-Robot Integration for Pose Estimation and Semi-Autonomous Navigation on Unstructured Construction Sites

    By Chen Feng

    Compared to widespread successful deployment of robotic manipulators for repetitive and hazardous tasks in related industries such as manufacturing, the construction industry has achieved relatively l

    Aug 1, 2013

  • CIM
    Three-Dimensional Geological and Geomechanical Modelling of a Repository for Waste Disposal in Deep Rock Salt Formations

    By S. Heusermann, S. Fahland, J. Behlau, A. Schäfers, J. Hammer

    In the course of the deep subsurface use, the Federal Institute for Geosciences and Natural Resources has been carrying out extensive geological and geomechanical research and practical project work o

    Jan 1, 2015

  • CIM
    The Development of the 'Dosco Miner

    By F. Doxey

    Introduction In order to improve outputs and to reduce or hold mining costs, many attempts have been made to mechanize the getting and loading of coal in the major coal producing countries, and machi

    Jan 1, 1951

  • CIM
    Lucky Jim Mine

    By M. S. Hedley

    "The Lucky Jim mine is at Zincton in Slocan mmmg division; on the Kaslo-Nakusp branch of the Canadian Pacific railway. It is owned and operated by Zincton Mines; Limited; a subsidiary of Sheep Creek G

    Jan 1, 1954

  • CIM
    Mineralogy of the Ross Veins, Ramore, Ontario

    By W. A. Jones

    THE Ross mine, a subsidiary operation of Hollinger Consolidated Gold Mines, Limited, is situated near the north end of lot 1, concession 2, Hislop township, Ontario. The property comprises the north h

    Jan 1, 1944

  • CIM
    A Study on Fillability, Microstructure and Microporosity in LFC of B206 Aluminum ? Copper Alloy

    By N. Dahata

    B206 aluminum?copper alloy has a potential for wider use in the automotive industry due to its light weight and relatively superior mechanical properties as compared to aluminum-silicon alloys. The po

    Jan 1, 2007

  • CIM
    Microstructural comparison of the d hydride precipitation in Zircaloy-4 and Zr-1Nb alloys for fuel cladding

    By N. A. P. Kiran Kumar

    The Zr-Nb alloys are reported to be showing superior resistance to corrosion and substantially lower hydrogen pickup when compared with zircaloys. In the present study zircaloy-4 and Zr-1Nb (E110) all

    Aug 1, 2010

  • CIM
    ASTM International Standard for SAG and Ball Mill Ring Gear Inspection

    By Thomas E. Shumka

    ASTM E2905 describes a two-part standard for electromagnetic methods for preparation and examination of ring gear teeth in the mining sector for SAG and Ball Mill ring gear drives, including pinions?

    May 1, 2013

  • CIM
    Selection of Coal Mining Equipment

    By K. H. March

    In the present very highly competitive condition of the bituminous coal business, it is becoming increasingly apparent that coal mines which do not lend themselves to efficient mechanization cannot lo

    Jan 1, 1930

  • CIM
    Adsorption of Waste Water Contaminants by Industrial Minerals

    By Alireza Entesari

    Removal of metal ions from effluents represents a significant technical challenge. As a consequence several industries, including mining, are faced with issues relating to removal of contaminant catio

    May 1, 2006

  • CIM
    Emerging Technologies in Mine Waste Management

    By J. Zinck

    The management of mine wastes generated by both active and inactive mining is an ever more challenging issue. The cost to manage and treat mine wastes, including tailings, waste rock, treatment sludge

    Jan 1, 2004

  • CIM
    The Appropriateness of the Transfer Size in AG and SAG Mill Circuit Design (66c8a2e6-98f0-41c1-9ddb-2a494997b260)

    The AG/SAG circuit discharge P80 is now increasingly referred to as the “Transfer Size” or T80 for short. From the literature it is apparent that in circuit design some approaches to the sizing of AG/

    Jan 1, 2012

  • CIM
    Where Are We Going In This Hand Basket?

    By Lawrence Devon Smith

    What is a Failed Project? For mining projects, some key indicators of a ?failed? project are: ? Cost is more than it should be (particularly capital) ? Schedule ? It takes longer to build than exp

    May 1, 2010

  • CIM
    Minimizing Failures of Truck Hoist Cylinders and Frames

    By J. L. Blaylock

    Normally, the hydraulic system and structures are considered to be unrelated items. In reality, the two cannot be separated because one affects and depends on the other to function properly. This pape

    Jan 1, 1979

  • CIM
    Saskatchewan Bentonites

    By W. G. Worcester

    THE chief object in presenting this paper on bentonite is to attract general attention to one of the least known and most neglected industrial minerals of Canada, a mineral of extensive commercial pos

    Jan 1, 1937

  • CIM
    Dust in British Columbia Mines

    By D. A. MacLeod

    DURING the past fourteen months, dust surveys have been made at thirty-six mines in the Province. These surveys are made to determine the concentration of dust in the mine atmosphere, the flow of air

    Jan 1, 1939

  • CIM
    The use of Geosynthetics in Underground Works

    By C. Yoo

    "Geosynthetics engineering has made phenomenal advances during the last decade in areas of manufacturing as well as practical applications. As a result, geosynthetics are now being recognized as essen

    Jan 1, 2015

  • CIM
    Management of Squeezing Ground Conditions at Laronde Mine

    By P. Turcotte, E. Karampinos

    "Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the

    Jan 1, 2015

  • CIM
    Thiosalt Management at Noranda Inc., Brunswick Mine, Ongoing Research

    By Bob Butler

    Brunswick Mine has been involved in a comprehensive research program investigating site specific aspects of thiosalt management to eliminate its adverse environmental effects. Minimum annual reagent c

    Nov 1, 2002