Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Cost-Saving Strategies in Mine Ventilation

    By Euler De Souza

    "Underground operation ventilation energy requirements constitute a significant portion of mine energy consumption (40–50%) and total energy costs (25–40%). In general, mine ventilation systems are en

    Jan 1, 2018

  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    -0.5mm High Sulfur Fine Coal Microwave Energy Absorption Performance and Electromagnetic Characteristics in the Magnetic Separation Desulfurization

    By Z. Luo, China University of Mining & Technology, C. Duan

    "The magnetic separation removal rate of pyrite could be improved effectively by increasing the susceptibility of pyrite. The electromagnetic characteristics and absorption response performance of hig

    Jan 1, 2016

  • CIM
    Geochemical Methods Applied to Uranium Exploration in Southwest Baffin Island

    By Yvon T. Maurice

    Under the auspices of the Federal-Provincial Uranium Reconnaissance Program, a geochemical orientation survey was undertaken in an area of uraniferous Lower Proterozoic (Aphebian) rocks near Cape Dors

    Jan 1, 1977

  • CIM
    Pickle Lake-Crow River Area, District of Kenora (Patricia Portion), Ontario

    By M. E. Hurst

    Introduction Between 1903 and 1905, W. Mclnnis, of the Geological Survey of Canada, made a micrometer traverse of the Kawinogans (Crow) river from Kapkichegimaga lake to its junction with the Otosk

    Jan 1, 1930

  • CIM
    Automatic Anode Setting at Albras

    By L. S. Almeida, U. A. Courbassier, C. T. Guimãaraes, M. N. Souza, V. L. Silva, H. P. Dias, G. A. Bicalho, B. S. Rocha, P. N. Rodrigues, A. Carnevale

    During primary aluminum production the anode changing is a very important task. So improvements on it will be essential to avoid disturbance and have a better operational control. After anode changing

    Jan 1, 2006

  • CIM
    Geochemistry and Genesis of the Murray Brook Precious Metal Gossan Deposit, Bathurst Mining Camp, New Brunswick (dbd5d18e-f1e7-49a5-a65b-afddc38f108d)

    By D. R. Boyle

    "The Murray Brook precious metal (Au, Ag) gossan deposit is one of nine supergene mineral deposits that have developed over polymetallic massive sulfide deposits in the Bathurst Camp of New Brunswick.

    Jan 1, 1995

  • CIM
    Geochemistry and Genesis of the Murray Brook Precious Metal Gossan Deposit, Bathurst Mining Camp, New Brunswick

    By D. R. Boyle

    "Abstract - The Murray Brook precious metal (Au, Ag) gossan deposit is one of nine supergene mineral deposits that have developed over polymetallic massive sulfide deposits in the Bathurst Camp of New

    Jan 1, 1995

  • CIM
    Modelling a semi-batch reactive precipitation of ferrihydrite

    By W. R. Richmond, T. S. Li, D. Ilievski

    The reactive precipitation of ferrihydrite was studied in a laboratory semi-batch precipitator, where a highly concentrated sodium hydroxide solution was fed into an iron nitrate solution. Instantaneo

    Jan 1, 2005

  • CIM
    A Sustainable Extraction Strategy for Separating Heavy Rare Earths from Ion-Adsorbed Deposit

    By Xiaoqi Sun

    "Rare earth elements (REEs) have a series of specific properties making them invaluable in products including lighting, electronics and magnetism. The elements have been used in many commercial produc

    Jan 1, 2016

  • CIM
    Improved Model to Assess Stress Condition on Buried Pipelines Affected by Mine Subsidence

    By B. Qiu

    The large surface ground movements induced by underground mining could threaten the safety of the pipelines laid across the subsidence-prone area. Existing analytical methods for the stress analysis o

    Aug 1, 2013

  • CIM
    New Technique for Flotation of Potash Ores with a High Content of Water-Insoluble Impurities

    By S. N. Aliferova, E. I. Afonina, S. N. Titkov, A. Ju. Bondareva, N. N. Panteleeva

    "Potash ore is mainly processed using the method of cationic flotation. Potash ore deposits of the CIS, namely: at Upper Kama river, Gremyachinsk (Russia), Starobin (Belarus), Tubegatan (Uzbekistan) a

    Jan 1, 2016

  • CIM
    Chemical hydrogen storage for automotive applications

    By Davis. B. R.

    There are a number of hydrogen storage systems proposed for automotive applications. However, all of the current suggestions fall short of the DOE targets for storage density and volumetric density. T

    Jan 1, 2005

  • CIM
    Improved pellet reducibility by closing grinding circuits with hydro classifiers at QCM's Pellet Plant (a963ef26-a855-4c7b-8f4c-3961a4652f30)

    By Colleagues from Process and Operation departments, Guy Chevalier

    "QCM's pellet plant, located in Port-Cartier, Quebec, produces up to 8.6 million tons of iron ore pellets annually. Four different types are produced: three for blast furnace operations and one for di

    Jan 1, 2002

  • CIM
    The Ecstall Story: The Open-Pit Mine

    By George C. Coupland

    "THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc

    Jan 1, 1974

  • CIM
    Obtaining Robust Estimates of Rock Strength for Rock Engineering Design

    By J. P. Harrison, N. Bozorgzadeh, M. Dolowy-Busch

    "It is common in rock engineering practice to characterize the triaxial strength of intact rock by using only data samples of small size. Practical guidelines such as ASTM support such sample sizes. I

    Jan 1, 2015

  • CIM
    The Separation of the Bitumen from Alberta Bituminous Sands

    By K. A. Clark

    A meeting between representatives of the Scientific and Industrial Research Council of Alberta and the Deputy Minister of Mines for Canada was held at Edmonton in May, 1929, for the purpose of formula

    Jan 1, 1929

  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate from Eldorado Gold Corporation’s Certej Project in Romania

    By J. Stiksma, J. Dennett, R. Kalanchey, J. Ji, M. Collins, T. Chan, R. Berezowsky

    A pilot plant campaign has been conducted by Sherritt Technologies in support of Eldorado Gold Corporation’s evaluation of pressure oxidation technology for the treatment of refractory gold concentrat

    Jan 1, 2014

  • CIM
    Underground Operations at the Dome Mines (9ecdfeb1-07a6-4c2d-8ca3-2b5b1b6c1ce4)

    By John B. Phillips

    The mine is entered by a central vertical shaft, strongly timbered, and containing two compartments-one for the passenger cage, the other for the large skips bringing the ore to the surface. A man-way

    Jan 1, 1926

  • CIM
    Modelling the risk factors of occupational accidents in an underground coal mine in Turkey using regression analysis

    By C. O. Aksoy, P. M. Ozfirat, M. K. Ozfirat, C. Tatar, C. Pamukcu

    "Temporal and other factors contributing to the occurrence of occupational accidents at an underground coal mine in Turkey between 1992 and 2000 have been analyzed. The time period of the study spanne

    Jan 1, 2006