Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Quantitative characterization of the REE minerals by QEMSCANTM from the Nechalacho Heavy Rare Earth Deposit, Thor Lake Project, NWT, Canada

    By Tassos Grammatikopoulos, Sarah Prout, William Mercer, C. Gunning

    "The Nechalacho rare metal deposit is located in NWT, Canada. Avalon Rare Metals Inc. is now evaluating processing techniques for recovery of REE to be used in the industry. QEMSCANTM analysis coupled

    Jan 1, 2011

  • CIM
    The Past 70 Years of Flash Smelting

    By M. Lahtinen, P. Latostenmaa, I. Kojo, E. Peuraniemi, M. Lindgren, S. Jyrkönen, M. Jåfs

    The year 2019 marks the 70th anniversary of Flash Smelting. The technology was operated on industrial scale for the first time at the Outokumpu Harjavalta copper smelter in Finland in 1949. Since then

    Jan 1, 2019

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Partial Roasting of Copper Concentrate with Stabilisation of Arsenic and Mercury

    By K. Lundholm, M. Andersson, L. Nevatalo, Å. Holmström, L. Hedström

    "Several copper deposits have the arsenic bearing minerals enargite (Cu3AsS4) and tennantite (Cu12As4S12). Since this mineral contain both arsenic and copper, it is not possible to remove the arsenic

    Jan 1, 2014

  • CIM
    Reducing Miners? Exposure to Diesel Particulate Matter Using Real-time Measurement

    By Michel G. Grenier

    Compliance with Diesel Particulate Matter (DPM) exposure regulation is currently performed using timeweighted average (TWA) sampling on underground mine workers. These samples are collected in the spa

    May 1, 2010

  • CIM
    Geomechanical Studies of an Alpine Rock Mass

    By Tiziana Apuani

    The study refers to an area of about 70 km2, extended in the Italian Central Alps along the the San Giacomo Valley where different civil and mining works are present The regional geological setting is

    May 1, 2009

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • CIM
    Froth Flotation: The Kinetic Approach

    By R. R. Klimpel

    "SYNOPSISA discussion of the importance of flotation rate in the analysis of mineral flotation is presented. In particular, the highly interactive nature of the flotation ""system"" is emphasized wher

    Jan 1, 1984

  • CIM
    Flotation and Hydrometallurgy Research on Brunswick Tin Mine Ores

    By E. W. J. Thornton

    During the past six or seven years extensive research has been performed on ore samples procured at the Bruns1,vick Tin Mines which is located in the south-west corner of New Brunswi.ck. This property

    Jan 1, 1977

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • CIM
    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • CIM
    The Premium Value Defined Growth Independent - Value Creation ? Return On Capital ? Low-Cost Producer ? Return On Assets

    By Phil Keele

    Canadian Natural ??Business Approach Efficiency and Execution ?Drive to be the low cost producer ?Focus on exploitation ?Augment exploitation with strategic acquisitions ?Maintain Discipline and

    May 1, 2010

  • CIM
    Textural Analysis Provides Clue to Poor Ground Conditions in a Saskatchewan Potash Mine

    By A. Dave Mackintosh

    In 2001, at the CIM AGM in Quebec, a paper discussing poor ground conditions in a newly opened area at Agrium?s Vanscoy Potash Operation?s, suggested load transfer around old workings as a possible re

    Apr 1, 2005

  • CIM
    Activated Carbon: Manufacture, Structure, Properties and Application in Precious Metal Recovery

    By D. A. Ainsworth

    "The first known use of activated carbon dates back to the Ancient Egyptians who utilized its adsorbent properties for purifying oils and medicinal purposes. Centuries later, the early ocean going ves

    Jan 1, 1984