Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces

    By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler

    Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre

    Jan 1, 2019

  • CIM
    Arsenic Management and Stabilization

    By K. Lundholm, A. E. Mäkinen

    "Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec

    Jan 1, 2014

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream Area

    By K. G. Thorne, M. J. McLeod, D. Hoy

    "Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col

    Jan 1, 2008

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • CIM
    Novel Vat Leaching System

    By W. J. Young, K. B. Macneill, C. N. Smith

    "A BRIEF HISTORY OF THE MURRAY BROOK MINERAL DEPOSITDuring the mid-1950's intensive exploration activity in northern New Brunswick followed the discovery of the world class Brunswick base metal deposi

    Jan 1, 1993

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • CIM
    History of China’s Electrolytic Copper Production

    By Changping Hu, Keqin Tan

    In 1937, the Metallurgical Department of the National Resources Committee established a copper refinery plant (predecessor of the Chongqing Smelter) in Changsha, Hunan Province, China. The blister cop

    Jan 1, 2019

  • CIM
    Techno-economic evaluation of thiosalt treatment processes

    By K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy

    Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente

    Jan 1, 1988

  • CIM
    Uranium Exploration in the United States

    By Phillip I. Merritt

    "IntroductionDuring and since• the war, it has been my privilege to work closely with those in Canada who are responsible for the vital raw materials needed in our co-operative atomic energy programme

    Jan 1, 1950

  • CIM
    Symposium on Powder Metallurgy

    By Nicholas J. Grant

    It is the purpose of this paper to examine a number of the recent developments in powder metallurgy, being most concerned with those which are yet to prove themselves rather than those which have achi

    Jan 1, 1965

  • CIM
    Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario

    By A. C. Wilson

    In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu

    May 1, 2003

  • CIM
    Mining, Capacity-Building and Social License: Making the Links

    This paper aims to increase our understanding about existing capacity-building approaches and their implications for obtaining a social license to operate in the mining industry. The notion of ?capaci

    Aug 1, 2013

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    An historical sketch of the Canadian steel industry

    By W. M. Williams

    The Canadian steel industry is now in many ways a mature one, having achieved many technical successes during its hundred-year history. It is interesting to look back over this period, to learn someth

    Jan 1, 1999

  • CIM
    Update of Chilean Mining Projects and Technological Trends

    By C. Cornejo, C. Schuffeneger, J. Rosas

    "At the end of 2010 the AMSA Esperanza Concentrator started commissioning. Located in the Atacama Desert this project is the first of several large size concentrators developed recently to operate in

    Jan 1, 2012

  • CIM
    Real Time Analysis of Conveyed Bulk Materials for Optimized Plant Performance

    By H. Powell

    "This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014

  • CIM
    Characterization of Rapidly Solidified Metallic Alloys Using Combination of Experiments and Modelling

    By A-A. Bogno, Ch. -A. Gandin, A. Maitre, H. Henein

    Most metallic materials are produced from their liquid state. In order to control the properties of industrial products, it is very important to understand their solidification path and the resulting

    Jan 1, 2014

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014