Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Twelve Technology Tools to Design and Optimise the Production Chain from Resource to Product

    By Rob Morrison, Peter Cameron

    "Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are

    Jan 1, 2003

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    Mill Speed Control for More Efficient Grinding

    By V. K. Gupta

    "Effect of mill speed on grinding kinetics has been investigated with a view to using mill speed as a manipulated variable for control and optimization of the grinding circuit performance under variab

    Jan 1, 1985

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    New Method for Controlling the Volumetric Filling Condition in a Mill

    By J. Miettunen

    "The lining of a grinding mill has an important role in creating the conditions for the grinding process. The main purpose of the lining is to transfer the energy taken by the mill motor to the conten

    Jan 1, 1991

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Column Flotation Experience at the Sarcheshmeh Copper Mine

    By S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani

    "The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta

    Jan 1, 2000

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975

  • CIM
    The Altair TiO2 pigment process and its extension into the field of nanomaterials

    By W. Duyvesteyn, B. Sabacky, T. Spitler, D. Verhulst

    "The Altair TiO2 pigment process is based on hydrochloric acid leaching of ilmenite at high-acid concentration. Titanium is transferred by solvent extraction into a high-purity aqueous stream with a h

    Jan 1, 2002

  • CIM
    Introduction to the Meliadine Project

    By M. Gaumont, F. Robichaud

    "Agnico Eagle Mines Limited (AEM) is a Canadian-based gold producer with operations in Canada, Finland and Mexico. In 2010, AEM produced its first gold bar in Nunavut, Canada as it started its Meadowb

    Jan 1, 2016

  • CIM
    A Frother Concentration Meter

    By J. A. Finch, T. Weber

    "Bubble size in flotation is strongly influenced by frother concentration in the pulp liquor. There is no accepted method of judging the dosage and thus how effectively frother is being distributed to

    Jan 1, 2003

  • CIM
    Evolving Equipment Health, a Rio Tinto Case Study

    By Daniel D. M. Adams

    Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min

    May 1, 2011

  • CIM
    The Role for Uranium and Nuclear Power in Combating Global Climate Change

    By Chuck Edwards

    Whatever your opinion of the validity of the scientific case for global warming, or of the wisdom of the Kyoto Protocol, it would seem judicious to err on the side of caution and try to sensibly minim

    Jan 1, 2004

  • CIM
    Dust Control, Brenda Mines Limited, Peachland B.C.

    By J. W. Austin

    "Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation

    Jan 1, 1976

  • CIM
    Variation of thermal conductivity of rocks with pressure

    By A. Demirci, A. Keçeciler, Y. S. Durutürk

    "This paper deals with the results of the variation of thermal conductivity of rocks with pressure on a laboratory scale. For this purpose, the authors have added a pressure-supplying unit to the appa

    Jan 1, 2002

  • CIM
    Thompson Mill MgO Rejection

    By Johnna Muinonen

    "The Thompson Mill processes ores from the Thompson and Birchtree Mines. While the Thompson ore has very little magnesium containing gangue, the Birchtree orebody consists of veins of massive sulphide

    Jan 1, 2006

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    The Echo Bay Mines Silver Mill

    By Graham A. Karklin

    "The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci

    Jan 1, 1981

  • CIM
    Flash Flotation at Hudson Bay Mining and Smelting

    By L. Betteridge, A. Marks

    "An OK 300 cu. ft. Skim - Air cell was installed at the HBM&S concentrator in Flin Flon in 1987. Since that time, 3 additional OK Skim - Air cells have been installed in HBM&S concentrators. The cell

    Jan 1, 1991