Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Hydraulic Transportation of Coal - NSW Coal Industry the Need, Current Research and Potential

    The need for the hydraulic transportation of coal in the New South Wales coal industry, both from the coal face to the surface and from the coal mine to the consumer or the port for export, is explain

    Jan 1, 1980

  • AUSIMM
    Planning and Development of Newstan Colliery, Newcastle, N.S.W

    In preparing a paper such as this it was thought that the Newstan Colliery Company Ltd., being comparatively new, would need some introduction to mining people in general.The Newstan Company was forme

    Jan 1, 1954

  • AUSIMM
    Diamond Mines and Alluvial Deposits, South Africa-The Method Employed in Winning the Diamonds on the Vaal River Alluvial Fields

    Although the Diamond that is cut and polished and made up into an article of jewellery, is so well known, there are, comparatively speaking, very few outside the industry who know this beautiful cryst

  • AUSIMM
    The Development of a Robust Sampling Strategy and Protocol in Underground Gold Mines

    The development of a robust belt sampling strategy and protocol inunderground gold mines is a fundamental requirement for effective grade quality control, ore accounting and mine-mill reconciliations.

    Jan 1, 1999

  • AUSIMM
    Cave Mining at Premier Diamond Mine

    By A Croll

    A panel cave using LHDs for ore extraction came into production at Premier in 1990 at a depth of 630 metres below surface on the western side of the mine in the BA5 mining block. A post-undercut minin

    Jan 1, 2000

  • AUSIMM
    Geology of the Eastern Creek Volcanics in the Mount Isa District

    The Precambrian Eastern Creek Volcanics comprises spilitic basalts with interbedded sediments and tuffs which were extruded and deposited during Middle Proterozoic time. The rocks have undergone low-g

    Jan 1, 1968

  • AUSIMM
    Electrum and Gold Fineness of Some Hauraki Epithermal Gold-Silver Deposits

    By G A. Challis, A B. Christiel

    Microprobe analyses of electrum grains in some Hauraki Au-Ag deposits indicate that gold fineness is in the range of 500 - 800 (50 - 80 per cent Au), but for most deposits the range is usually narrowe

    Jan 1, 1992

  • AUSIMM
    Gold Plant Cyanide Safety

    By B Vernon, M Whiteley, T Robinson

    The Western Australian gold industry has approximately 100 operating plahts, mainly CIP/CIL. The nature of the State's rapidly expanding gold industry gave rise to concerns over management of the

    Jan 1, 1990

  • AUSIMM
    Rapid and reliable flow property testing – a modified uniaxial approach

    By K Williams, W Chen, J Miller

    The flow function of an iron ore material governs its flowability characteristics in material handling chains within the resource industry. A uniaxial compression test is able to obtain a flow functio

    Jul 24, 2017

  • AUSIMM
    Hierarchical Clustering Algorithm for Block Aggregation in Open Pit Mines

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. Various mixed integer linear programming (MILP) formulations have been used for production scheduli

    Dec 6, 2010

  • AUSIMM
    Geology and Exploration at Puhipuhi, Northland, New Zealand

    By G J. Corbett, T M. Leach

    Approximately 42 t of mercury were produced from Puhipuhi from the late nineteenth century until the end of World War II, with no significant gold or silver production. Sinter, eruption breccias and v

    Jan 1, 1997

  • AUSIMM
    Iron ore grade modelling using geostatistics and artificial neural networks

    By B C. Sarkar, D Ray, V Sarkar, P K. Sinha, R K. Singh, A Kumar

    Estimation of iron ore grade distribution has been attempted using geostatistics and artificial neural network (ANN) based models for a banded iron formation (BIF) type iron ore deposit of East India.

    Jul 24, 2017

  • AUSIMM
    Practical Stope Reconciliation in Large-scale Operations Part 2, Olympic Dam, South Australia

    By J Wesseloo and Y Kim, Y Potvin, G Mungur, D Grant

    At the previous MassMin conference held in Sudbury in 2012, the authors proposed a new framework going beyond dilution and equivalent linear overbreak sloughing (ELOS) for stope reconciliation in rela

    May 9, 2016

  • AUSIMM
    Development of prereduced agglomeration process using carbon composite iron ore briquette in travelling grate

    By S H. Son, M K. Wang, H K. Jeong, B K. Cho, J I. Park

    The utilisation of low-grade raw materials such as fine iron ore and semi-soft coking coal, and reduction of CO2 emissions are important issues in the ironmaking process. To solve these issues, a new

    Jul 24, 2017

  • AUSIMM
    A Case Study of the Zhilingtou Gold-Silver Deposit, Zhejiang, China

    By C Zhang, P Wang, S Yao

    The Zhilingtou Au-Ag deposit is situated in the eastern part of the complexly deformed and metamorphosed South China Caledonian Fold Belt. It consists of seven orebodies that are almost exclusively ho

    Jan 1, 1995

  • AUSIMM
    Resources and Reserves ù Their Impact on Financial Reporting, Valuations and the Expectations Gap

    Resources and reserves are critical inputs into the determination of an operating mineÆs financial results and balance sheets, but how well understood is this fact. Do the investors, directors, accoun

    Jan 1, 2002

  • AUSIMM
    Laboratory-Scale Magnetohydrostatic Separator for High Resolution Density Analysis of Plastic and Other Wastes

    Laboratory-Scale Magnetohydrostatic Separator for High Resolution Density Analysis of Plastic and Other Wastes Recycling and reuse of different plastic wastes is still a current problem to solve for

    Sep 13, 2010

  • AUSIMM
    From Production to Sustainability Reporting - Towards Quantifying Sustainable Gold Mining

    Gold mining in Australia and globally has a long and variable history. In recent years, due to ongoing public concern over long-term environmental impacts, the mining industry globally has been moving

    Jan 1, 2007

  • AUSIMM
    Epithermal Gold-Silver Mineralisation - Karangahake

    A subsurface study of the Maria Lode and associated hydrothermal alteration of andesites within the Karangahake epithermal gold-silver deposit defined the local evolutionary sequence in the once activ

    Jan 1, 1984

  • AUSIMM
    Development and Benefits of Interactive Learning Systems on Atlas Copco Equipment

    Atlas Copco Construction and Mining Australia identified a number of issues in regard to the skill levels, labour turnover and productivity of our service technicians. In 1994 we were experiencing a l

    Jan 1, 1998