Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Seventies - A Decade of Hydrometallurgical AdvanceThe seventies was a decade of intensive hydrometallurgical activity, firstly for copper recovery, then uranium, and finally gold. In comminution, semi-autogenous grinding was applied to uranium and
Jan 1, 1981
-
Tunnelling Design on the Northside Storage Tunnel ProjectBy A Quigley
The Northside Storage Tunnel Project in Sydney includes over 20 km of TBM driven tunnels, over 3 km of declines and major caverns and pump rooms. The paper describes methods used for design on the pro
Jan 1, 1999
-
Depression of Arsenopyrite Flotation and its Separation from Pyrite in Guangxi Shanhu Tin MineBy Shinnosuke U, Zhang HE, Qian X
In this paper it is recommended that pyrite is to be separated as froth from arsenopyrite by selective depression of arsenopyrite in strong alkaline medium (1), by oxidation with chlorinated lime (I
Jan 1, 1993
-
The Lennard Shelf Operations ù A Real Options Case StudyFinancial theory often takes some time to penetrate industry and when it does it can result in a paradigm shift in valuations and mental models. The Black Scholes option valuation was first published
Jan 1, 2003
-
Environmental Considerations in Project Planning, Development and ManagementBy Hannan JC
Consent to develop and operate a new coal mine in New South Wales (NSW) will be conditional upon a number of environmental controls. In NSW, applications for any new major development associated w
Jan 1, 1986
-
Two Stage Iron Purification of Zinc Plant SolutionsBy Kershaw MG
At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec
Jan 1, 1985
-
Doing the Right Things Right ù Identifying and Implementing the Mine Plan That Delivers the Corporate GoalsBy B Hall
The authors have undertaken many independent mine optimisation and operational improvement projects at Australian and international mining operations over the past decade. This work has provided an un
Jan 1, 2006
-
Safety in Tunnelling and Underground Construction ù An Australian PerspectiveBy N J. Betts
This paper aims to build on the strong emphasis that was placed on safety in the Sydney AITES-ITA Congress in March 2002. It will do this by comparing safety records from some major tunnelling project
Jan 1, 2003
-
Computerised Geological and Mining Ore Reserve Systems at Western Mining Kambalda Nickel OperationsBy Gee C. E
Ore reserves at the Kambalda Nickel Operations of Western Mining Corporation are estimated using the polygonal method for calculating areas of influence of drillholes. All raw assay and survey data
Jan 1, 1977
-
Geology of the Green Parrot and Reward Silver-Lead Deposits Jervois Range, Northern TerritoryThe Green Parrot and Reward stratabound silver-lead (copper-zinc) deposits are located in the eastern part of the Arunta Block. At Green Parrot, mineralisation is contained within a north-south str
Jan 1, 1984
-
Automation of Underground LHD and Truck HaulageBy H Durrant, P I. Corke, J Cunningham
This paper reviews the state-of-the-art in the automation of underground mining vehicles and reports on the development of an autonomous navigation system under development through the CMTE with spons
Jan 1, 1998
-
Plasma Enhanced Recovery of Alloying Elements from Slags, Wastes and Lean OresBy R F. Johnston, I D. Sommerville
This paper presents an overview of the researches carried out in our laboratory on the application of plasma in recovery of alloy elements from waste slags and the treatment of lean ores, which are ex
Jan 1, 2000
-
Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa MinesBy M Magee, D Way
The Mount Isa Copper Concentrator was commissioned in 1973. In 1991, two autogenous grinding mills were installed replacing two stages of crushing, one stage of rod milling and one stage of primary ba
Jan 1, 2004
-
Automation and Control of Longwall Mining SystemsBy Smith P
The past 20 years have seen the replacement of hydraulic control of longwall mining systems by the neater. smaller and better controlled electronic units.Early problems of moisture and other effects o
Jan 1, 1991
-
Reflectance Spectroscopy Monitoring of the Petroglyphs of the Burrup Peninsula, Western AustraliaBy S Furman, M Caccetta, A Hacket, B McDonald, M A. Wells, D Lau
In 2004, the Western Australian Department of Industry and ResourcesÆ Burrup Rock Art Management Committee commissioned a number of independent scientific studies to evaluate the condition of rock art
Jan 1, 2008
-
Platinum-Group-Metal Occurrence in New ZealandPlatinum Group metals have been known in New Zealand since the 1880's but not produced on a large scale. They have been neglected because their value was not appreciated rela- tive to gold and
Jan 1, 1987
-
Vertical Crater Retreat Pillar Mining-A Case StudyThe Vertical Crater Retreat (VCR) mining method was used to mine two rib pillars at New Broken Hill Consolidated Limited (NEHC) mine at Broken Hill. Experience gained in a trial VCR pillar stope w
Jan 1, 1983
-
Ventilation At Depth At North Broken Hill LimitedAutocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without
Jan 1, 1977
-
Shotcreting Methods with Compressed Air in Munich Subway ConstructionIn Munich's peculiar hydrogeological conditions (water bearing sand strata between layers of impermeable clay, silt or marl) are proper functioning groundwater lowering methods of decisive im
Jan 1, 1987
-
Exploration Philosophy and Future TrendsProjections of metal requirements for Japan and the United States indicate growing competit- ion for Australia's mineral output and a critical need for continuing discovery of new reserves. Th
Jan 1, 1973