Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Scheduling and Optimisation

    Mine scheduling is a process which represents what happens in a mine over time. An optimised plan involves selecting the best workable plan which meets a stated objective. This paper discusses some

    Jan 1, 1991

  • AUSIMM
    Mineral Resource/Ore Reserve Estimation - A Common Sense Approach

    The issues which are the subject of this paper cover an extremely broad field. In themselves the components of the topic could be the theme, in considerably greater detail, of a two day seminar. In

    Jan 1, 1990

  • AUSIMM
    Some Simple Graphical Methods for Reliability Analysis in Mines

    By Granholm S

    The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the fields of maintenance and operational reliability of capital intensive mining equipment.

    Jan 1, 1991

  • AUSIMM
    Mathematical Modelling the Process of Separation of the Raw Materials in the Column Flotation Machine

    By Samyguin VD, Filippov LO

    The aim of this paper is to emphasise the importance of knowing of the rate of the elementary flotation acts (EFA) - attachment and detachment. By studying the simplest linear model notion of the co

    Jan 1, 1993

  • AUSIMM
    Electrowinning of Copper at High Current Densities Part II

    By Andersen AK

    A previous paper (1) indicated that electrowinning of copper at current densities considerably higher than those currently employed in electrowinning operations is technically feasible. It is of int

    Jan 1, 1969

  • AUSIMM
    The U.S. Bureau of Mines Human Factors and Management Research Program

    By Cecala AB

    For 20 years the US Bureau of Mines has been researching strategies for improving the physical, social, and psychological work environment of the miner. The products of this program have shown that a

    Jan 1, 1991

  • AUSIMM
    The Social Aspects of Environmental Impact Studies in Queensland

    By Morgans DJ

    The aim of this paper is to highlight the social aspects involved in the preparation of environmental impact studies (E.I.S.'s) for mining developments. In particular, the paper will reveal t

    Jan 1, 1987

  • AUSIMM
    Core & Shell Pillar Recovery Stoping in Mount Isa Silver/Lead/Zinc Mine

    Mount Isa mine is the largest underground mine in Australia and is located 2,000 kilometres north-west of Brisbane. This mine has been in continuous operation since 1931 and in 1986/87 the silver/lea

    Jan 1, 1990

  • AUSIMM
    Reliability of Machines and Systems Used in Production Process in Mines - A Case Study of South Eastern Coalfields Limited, India

    The continuously growing coal mining industry of India presently includes shovel dumper combinations in open cast mines, sometimes with dragline mining of overburden, together with the whole range of

    Jan 1, 1991

  • AUSIMM
    Drilling and Blasting Through Old Underground Workings at Westside Mine

    By T Galvin

    Drilling and blasting at Westside Mine near Wallsend, NSW, has presented a challenge for Orica Explosives, Australia. The colliery produces 600 000 tonnes of steaming coal per year from two seams usin

    Jan 1, 1999

  • AUSIMM
    Milling and New Technology

    The crushing and concentration of ores, as Herbert Hoover commented in a footnote in De Re Metallica, stretches back at least 6000 years. During those years there have been continuing changes and im

    Jan 1, 1988

  • AUSIMM
    Studies on the Design Circuit for Compact Itabirite of Conceitpo Mine

    By E S. Souza, H Delboni Jr, M F. Calixto

    This paper aims at presenting the results of laboratory, pilot plant and simulation studies for the design of the grinding circuit for the beneficiation of compact itabirites from the Conceitpo mine.

    Jan 1, 2007

  • AUSIMM
    The Effect of Mineralogy on Desliming and Flotation of Itabirite Iron Ores

    By A D. Ferreira, A E. C, A D. Padovezi

    The increasing market requirements regarding the quality of products, the enhanced predictability from detailed mine planning, the need for process consolidation and upgrading require continuous inves

    Jan 1, 2005

  • AUSIMM
    Geological Features and Origin of Gold Deposits Occuring Within the Jiamusi Precambrian Massif, Northeast China

    By Gang L

    Seventy-nine gold deposits and prospects have been discoveried in the Jiamusi region of northeast China, and constitute one of the most important gold metallogenic belts in China. All these endogenic

    Jan 1, 1995

  • AUSIMM
    Extraction of Gold in Hallide Media

    By Davis A, Song J

    A review of the literature indicated that several studies have been reported on the dissolution of gold using iodide/iodine, bromide/bromine leaching systems. Although the reagent costs are much che

    Jan 1, 1992

  • AUSIMM
    The Los Pelambres Overland Conveyor Braking System

    By N R. Johnson

    The overland conveyor at the Los Pelambres mine in Chile is designed to move 8700 t/h of material over 12 km at a speed of 6 m/s while descending 1400 m. The conveyor, which is divided into three segm

    Jan 1, 2005

  • AUSIMM
    Current Drilling and Blasting Practice in the 1100 Orebody-Mount Isa

    Mount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling an

    Jan 1, 1988

  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    Laboratory Studies in Comminution - Part II Rod Versus Ball Milling of a Tin Ore

    By Quast K. B

    Laboratory batch rod and ball milling tests were conducted on samples of Heavy Medium Separator (HMS) sinks from Renison Tin Limited. The product size distributions for this heterogeneous material wer

    Jan 1, 1995

  • AUSIMM
    Measurement and Simulation of Face Ventilation Effectiveness for Large Diesel Powered Equipment

    By Brechtel C. E

    Providing adequate airflow to effectively dilute and remove diesel pollutants in large mine working headings is a little researched area. A simulated diesel mucking operation was carried out in th

    Jan 1, 1988