Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineral Resource Development - National Environmental Challenges

    This paper addresses; land use, rehabilitation and the State/Federal regulatory process, in light of Australia signing various international conventions and agreements in the area of environmental pro

    Jan 1, 1992

  • AUSIMM
    Structure of the Kalgoorlie Goldfield

    The gold deposits of Kalgoorlie are the most important on the Precambrian shield of Australia. Gold was first discovered.'-:.V. ,,.,.-,..Kalgoorlie in June, 1893, and olthough`the original find

    Jan 1, 1964

  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Explosion in A B.O.S. Furnace

    On Wednesday 11th November, 1970, a series of violent explosions occur-- red within No.1 Basic Oxygen Steelmak- ing (B.O.S.) furnace at the Whyalla Works of the Broken Hill Proprietary Co. Ltd., (B.

    Jan 1, 1975

  • AUSIMM
    An Evaluation of Blast Performance at the Kidston Gold Mine

    By Paine G

    Kidston Gold Mines commenced mining in 1984 and currently mine approximately 10 million tonnes per annum of ore and waste using a conventional truck and shovel open pit method. The overall mine grade

    Jan 1, 1986

  • AUSIMM
    Mineralogical Aspects of the Extractive Metallurgy of Nickeliferous Laterites

    Because of the mineralogical complexity of nickeliferous laterites, most commercial and laboratory extractive processes require the ore to be blended to a feed of "constant" chemical composition. E

    Jan 1, 1978

  • AUSIMM
    Improved Decopperising of Lead Bullion at Port Pirie

    By Miller M. J, Bauer J. C

    The continuous copper drossing process operated at Port Pine since 1962 has had limited copper removal capacity as determined by a maximum tolerable Cu/S ratio in feed and the level of sulphur in b

    Jan 1, 1989

  • AUSIMM
    The Economics of Gold

    The economics of gold differs from that for base metals mainly because a large component of gold demand is investment or stock demand whereby the metal is purchased and stored for monetary or anxiety

    Jan 1, 1984

  • AUSIMM
    Small Pilot Plant Trials of Sirosmelt Copper Smelting

    By Grace NC, Lightfoot BW

    Small scale trials of the smelting of a copper concentrate in the Sirosmelt submerged lance reactor are described. Pellets of concentrate were dropped into the reactor while injecting air-rich mixt

    Jan 1, 1980

  • AUSIMM
    Air Quality in Mines: Progress and Prospects of Legal Control

    Exposure to respirable contaminants in mine atmospheres has long posed a serious hazard to miners. The control of these hazards, some of which can have sudden and catastrophic effects and some oth

    Jan 1, 1988

  • AUSIMM
    Process design and commissioning of the Goedehoop coal processing plant

    By Swann CA

    In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o

    Jan 1, 1986

  • AUSIMM
    Paving the Yellow Brick Road

    Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) is a management company, formed in 1989, to manage the assets and operate the Kalgoorlie joint venture for the owner companies Gold Mines of Kalgoo

    Jan 1, 1996

  • AUSIMM
    Simulation of Heap and Dump Leaching Processes

    By Yusuf R

    Many heap and dump leaching processes involve competitive, complementary and sequential reactions between multiple minerals and reagents. A comprehensive model has been developed to deal with thes

    Jan 1, 1984

  • AUSIMM
    Hydraulic Handling In Mining-Fully Automatic Large-Scale Test Unit On A Practical Scale (7820d56d-e8c9-4696-85e5-160c9e5556c0)

    The process of hydraulic transport through pipelines, world-wide well known for the trans- port of fine-grain solids is also being used to a greater extent in mining for the handling of 1rimarily c

    Jan 1, 1980

  • AUSIMM
    The Development and Implementation of a Three Dimensional Model of Blast Fragmentation and Damage

    By Cocker A, Kavetsky A

    A numerical model describing blast fragmentation and damage in three dimensions has been developed at the Julius Kruuschnitt Mineral Research Centre (JKMRC) and applied to numerous blasting operatio

    Jan 1, 1990

  • AUSIMM
    The Assessment of Australian Black Coals for the Production of Synthetic Crude Oil

    The production of synthetic crude oil requires a suitable coal or a coal extract modified by hydrogenation for pyrolysis. Existing classifications are broadly based on historical and current needs. O

    Jan 1, 1975

  • AUSIMM
    Assessment of the Explosibility of Gas Mixtures and Monitoring of Sample-Time Trends

    Previous methods for the assessment of the explosive potential of gas mixtures have required the plotting of apeexplosibility diagram. These became cumbersome if a large -number of assessments of

    Jan 1, 1981

  • AUSIMM
    Pre-feasibility and Feasibility Studies : A case for Improvements

    The paper reviews some characteristic features of feasibility studies and discusses the need for a wide scope at the pre-feasibility stage. The performance of recent Australian gold mines against th

    Jan 1, 1991

  • AUSIMM
    Geostatistical Study of a Lower Proterozoic Iron Orebody in the Pilbara Region of Western Australia

    By Shrivastava P

    The iron orebodies of the Pilbara region are formed by supergene enrichment of banded iron formation and rarely do such processes produce orebodies with uniform grade distrib- utions. The orebodies

    Jan 1, 1977

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986