Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Geological Mapping at North Broken Hill Ltd

    A proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop

    Jan 1, 1940

  • AUSIMM
    Note on Geochemical Investigations in a Deep Lateritic Weathering Profile at Woodcutters L5 Lead-Zinc-Silver Prospect, N.T.

    Geochemical investigations carried out in the Woodcutters area, Rum Jungle district, NT., consisted of a programme of C-horizon soil geochemical sampling followed by rotary-percussion and diamond dril

    Jan 1, 1978

  • AUSIMM
    Recovery of Fine Free Gold

    Spiral separators have been used to treat heavy mineralsands in Australia for some 35 years. During the last five years the logical extension of this technology has been torecover cassiterite from all

    Jan 1, 1986

  • AUSIMM
    Charge Flow in Pulp Lifters

    Efficient performance of pulp lifters to discharge ground rock is critical to the effective performance of SAG and AG mills. The paper covers developments in the design of pulp lifters and associated

    Jan 1, 2004

  • AUSIMM
    Technical Note - Different Rates of Dissolution of Zinc by Aeration of Sphalerite in Different Container Materials

    By Simes C. D

    Results of experiments for dissolution of zinc by aeration of sphalerite in glass, copper, galvanised iron and stainless steel vessels of identical dimensions are reported. It was found that in a glas

    Jan 1, 1984

  • AUSIMM
    Geology in Quarrying

    There are two main areas of application of geology in quarrying: (i) In regional planning for industrial mineral requirements.(ii) In direct quarry management. The regional planning requirement has re

    Jan 1, 1978

  • AUSIMM
    Oil in Australasia

    Eleven years ago I addressed delegates to the Whyalla Meeting of this Institute on the subjects 'Oil in Australia?' -- a title which was followed by a large question mark.My purpose at that

    Jan 1, 1962

  • AUSIMM
    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    New Limestone Grinding Plant at Risdon, Tasmania

    A new plant for grinding limestone was built at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited to meet increasing process demands expected to reach 150 tonne/day of ground

    Jan 1, 1977

  • AUSIMM
    Accident Prevention - A Total Management Requirement

    The published safety policy of Mount Isa Mines Limited, together with details of the organisation and control techniques adopted by management to pursue an active safety programme within the compan

    Jan 1, 1975

  • AUSIMM
    An Intelligent Electronic Convergence Monitoring System for Underground Coal Mines

    By Hutchinson IN

    In order for the Australian underground coal mining industry to achieve the high productivity rates demanded of it without compromising its good safety record, improved geotechnical monitoring systems

    Jan 1, 1991

  • AUSIMM
    Dragline Performance Evaluations for Tarong Coal Using Physical Modelling

    By Lumley G. I, Hayes H

    Non-intrusive methods for the reliable determination of dragline bucket and rigging performance have been achieved using physical modelling. Modelling offers a logical first step towards developing ma

    Jan 1, 1992

  • AUSIMM
    A Review of Magnetic Separation at Ambico Operation

    Heavy media separation serves to upgrade mill feed and reduce unit operating costs, allowing ores to be mined which could other wise be uneconomic. At the Aberfoyle mine at Rossarden in north-east

    Jan 1, 1978

  • AUSIMM
    Shotcrete Lining Design for Underground Excavations in Rock û The Current State of Practice

    By B Bendtsen, L McQueen

    The use of shotcrete as an efficient means of both temporary and permanent ground support has continued to grow over the last 30 years, with its use underground now commonplace around the world. Howev

    Jan 1, 2008

  • AUSIMM
    Magnetite Oxidation During Pellet Induration

    By M Bannear, J-F Wilhelmy, R Jones

    Mineralogical study of the interactions between fluxes and iron-oxides helps to understand how magnetite oxidises to haematite during pellet firing. Samples of OneSteel magnetite pellets tested at COR

    Jan 1, 2007

  • AUSIMM
    The Underground Connection Line Between South and North Stations Beijing

    By Shugen T

    Due to the increase of passenger traffic, a new station is proposed which is about 6.8km from south station. An underground connection line is under feasibility study for connecting these two sta

    Jan 1, 1987

  • AUSIMM
    Tunnelling Under Steep, Dangerous Slopes

    By Shibata Y, Shimizu R, Fukushima A

    Kobe is divided by the Rokko Mountains, runn- ing from east to west. The southern section of Kobe is highly developed in contrast with the northern section, but big, new residential pro- jects like

    Jan 1, 1987

  • AUSIMM
    Gas Discharge Modelling of a Bottom Blown Slag Melt

    By Das A. K

    Investigations were carried out to understand the effect of liquid viscosity (u = 1 x 10-3 - 5 x 10-' Ns/m2) on the size of primary bubbles formed at high gas injection rates (Q = 100 - 1000 c

    Jan 1, 1987

  • AUSIMM
    Beaconsfield Gold Mine - Ironing Out the Bugs

    The Beaconsfield gold mine processing plant is a complex operation and utilises crushing, grinding, gravity gold concentration, sulfide flotation, bacterial oxidation, cyanidation and zinc cementation

    Jan 1, 2007

  • AUSIMM
    Shallow Compressed Air Tunnelling on the Murl Project

    By Bennet A. G

    As part of the construction of the Melbourne Underground Rail Loop it was necessary to construct two 7 metre diameter tunnels, each 100 metres in length, by shield driven excavation through an all

    Jan 1, 1981