Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Essentials for Estimating Ore Reserves in Alluvial Deposits

    The grades of alluvial ore deposits are low compared with grades of hard rock mining. This factor, combined with other parameters of irregular distribution of particles, bedrock irregularities, siz

    Jan 1, 1987

  • AUSIMM
    Project Development and Construction Management

    Successfully managing project development and construction has often been a challenge in the mining industry. This is reflected in the number of projects that have taken longer to build, exceeded thei

    Jan 1, 2006

  • AUSIMM
    Economic Factors

    A minimum target of economic growth in Australia has been set at 5% per annum growth in G.N.P. at constant prices (Vernon Committee). 2. The core of the problem of sustaining steady growth at this o

    Jan 1, 1971

  • AUSIMM
    Water Reform, Tradeability and Understanding the Value of Water for Large-Scale Resource Projects

    By C Fenton

    The mining industry is a relatively minor user of water, which has historically been largely soured from private schemes. Frequently mines are often located in areas with limited available water resou

    Jan 1, 2003

  • AUSIMM
    The Role of Amdel in Research and Education for the Mining Industry

    The Australian Mineral Industry has to compete on world markets, so its mineral research has to be aware of overseas developments, it must be of world class, and it must utilise as many ideas as pos

    Jan 1, 1986

  • AUSIMM
    Emergency Escape Systems

    The Inquiry into the 1994 accident at Moura No. 2 Colliery included in it's findings that mine escape and rescue options for persons in underground coal mines were in need of review. The Inquiry

    Jan 1, 1998

  • AUSIMM
    Regulation of Environmental Management

    By Wilson T, Stone M, Mattiazzo R

    The regulation of environmental management in the minerals and petroleum industries has been undergoing considerable change over the past decade. In recent years, there has been a distinct trend towar

    Jan 1, 1993

  • AUSIMM
    Human Resources and Exploration Economics in a Developing Pacific Rim (8e2fdb4c-1dda-4d43-96fa-b2827ae3fd16)

    A vital ingredient in ensuring that metals exploration companies, working in the developing countries of the Pacific Rim, support the development of national geologists is making such a learning prog

    Jan 1, 1995

  • AUSIMM
    Financing of the Ranger Uranium Project

    By Miskelly N

    Construction of the Ranger uranium project located 230 kiss east of Darwin in the Northern Territory commenced in January 1979. Energy Resources of Australia Ltd (ERA) was incorporated in February

    Jan 1, 1983

  • AUSIMM
    Using the Floatability Characterisation Test Rig for Industrial Flotation Plant Design

    By J-P Franzidis

    Industrial flotation plant design is a complex process involving many aspects, one of which is the use of pilot-scale plants to test industrial plant flow sheets. Once test work on a pilot-scale has b

    Jan 1, 2004

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Some Practical Uses of Non-Linear Programming in Mine Planning

    By Beeforth C. G

    The use of Non-Linear Programming to obtain improved schedules of future activity in two specific cases of mining and treatment of minerals is described. The two cases were (i) reclamation of gold,

    Jan 1, 1977

  • AUSIMM
    Horizontal Cyclone Plant Trials at Bouganville Copper Limited

    By Noreen D

    At Bougainville Copper Limited comparison testwork was conducted between "horizontal" cycloning and conventional vertical cycloning. Horizontal cycloning reduces circulating load and allows increase

    Jan 1, 1988

  • AUSIMM
    Numerical Modelling of a Monitored Site in an Underground Coal Mine in the Bowen Basin

    By Medhurst TP, Trueman R

    The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and in

    Jan 1, 1992

  • AUSIMM
    Studies of FUL Grout by Experiment

    By Pinghui J

    The paper describes the detailed hydrogeological studies carried out prior to the sinking of twin shafts at British Coal's new mine at Asfordby, Leicestershire, UK. The test methods for assessi

    Jan 1, 1988

  • AUSIMM
    Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations

    A review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac

    Jan 1, 1993

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011

  • AUSIMM
    Fines Minimisation in the Comminution of Phosphate Rock

    By F Shi, W Valery

    WMC Fertilizers (WMCF) operates a Beneficiation Plant at Phosphate Hill in Queensland, Australia. The plant consists of two-stages of crushing, followed by a wet scrubbing and desliming circuit. Ore i

    Jan 1, 2003

  • AUSIMM
    Determining Mill Operational Efficiencies using Non-Contact Acoustic Emissions from MicrophoneáArrays

    By R A. Pax

    Operational grinding mills emit significant acoustic emissions which are a consequence of the dynamic environment prevailing inside them. From a technical perspective, the noise presents an opportunit

    Oct 29, 2012

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003