Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
EastLink Tunnel - Permanent Concrete Lining and Waterproofing DesignBy E Taylor, F Lebbing
The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid
Jan 1, 2008
-
Novel Processes for the Treatment of Sulphidic Refractory Gold ConcentratesBy Bourne R. W, Smith T
This paper presents initial findings of a project examining novel processes for the treatment of refractory sulphidic gold concentrates. Non-oxidative roasting of such concentrates for 12 hours at 7
Jan 1, 1991
-
Optimisation in Underground Mine DesignOptimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make
Jan 1, 1995
-
Collective Mine Water Reclamation and Reuse - Upper Olifants River CatchmentBy P Gnnther, A M. van Niekerk
Coal mining operations in the Upper Olifants River Catchment in the Mpumalanga Province of South Africa are challenged with the increasing production of excess mine water that cannot be fully managed
Jan 1, 2006
-
Production Scheduling Using Linear and Integer ProgrammingBy T GRAHAM-TAYLOR
A trend towards mining more complex and economically marginal orebodies, often combined with increasingly tight product specifications, increases the number of variables which need to be considered
Jan 1, 1992
-
High-Grade Uranium Mining at McArthur River, Saskatchewan, CanadaBy T Davis
Cameco Corporation operates the high-grade 140 tpd fly-in/fly-out underground McArthur River Uranium Mine in Northern Saskatchewan in a joint venture with Cogema Resources Inc. Reserve grade is in exc
Jan 1, 2002
-
Development of a Coal Mass Flow MonitorBy Whitworth NR, Fox MJ, Henley RG
The coal mass flow monitor was developed to measure the instantaneous mass flow rate of pulverised coal to the copper reverberatory furnace at Mount Isa. The instrument was calibrated with an isokinet
Jan 1, 1985
-
The PUTRA Light Rail Transit (LRT) System Two in Kuala Lumpur: Tunnelling a Case StudyOn 15 August 1998 the first section of the PUTRA LRT system was opened to the public as a free service prior to official commencement of revenue service on 1 September 1998. It is a remarkable achieve
Jan 1, 1999
-
Estimating Reserves Of Stone And Sand For Use By The Construction IndustryIt is no longer possible to establish a quarry on the most convenient hill then abandon the site, leaving a scar if the stone or sand in the deposit is found to be unsatisfactory. Before approval i
Jan 1, 1979
-
Current Problems in the Transportation of Minerals and MetalsBy Roberts I. R
The movement of materials is normally associated with a number of problems, some more easily overcome than others. Orebodies are frequently located in remote areas to which transport lines have to
Jan 1, 1974
-
Reducing WAD Cyanide at the Discharge SpigotBy M L. Habner, S D. Munro
In a gold CIP/CIL circuit, adding new circuit water to a final tails thickener and then directing the thickener overflow to the head of the circuit significantly reduces the cyanide concentration at t
Jan 1, 2007
-
Feasibility Studies for Financing PurposesBy Sroka J
A comprehensive feasibility study should be submitted as part of the loan application to a financial institution for debt funding of a proposed project. Its scope should include technical, costing,
Jan 1, 1978
-
Methods of Restoring New Zealand Native Forests After Mining (b7250dc7-77db-468c-aac9-f783e0d1bb16)By Ross C
This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe m
Jan 1, 1995
-
The Importance of Sampling in Grade ControlA wide variety of process streams are sampled for grade control in the mining industry. However, in many instances the overall precision of the resultant analyses is inadequate for the intended purpos
Jan 1, 2008
-
In-seam Drilling Technologies for Underground Coal MinesBy Hatherly P, Dunn P
There are- several in-seam coal research projects currently under investigation by the Cooperative Research Centre for Mining Technology and Equipment (CMTE). The overall aim of the projects is to pro
Jan 1, 1998
-
Computer Modelling in the Solution of Continuous Miner Heading Ventilation ProblemsBy Meyer C. F
The increasing use of continuous miners in the extraction of high coal seams has amplified the need for enhanced ventilation systems in the headings. Owing to larger face dimensions and higher produ
Jan 1, 1995
-
The Effect of Power Ultrasound in the Production of Synthetic Rutile by the Becher ProcessBy A A. Struthers, A D. Farmer
Power ultrasound may be applied to enhancing the processing of minerals. The enhanced performance is achieved through the very localised high-energy release at the mineral surface from the collapse of
Jan 1, 2001
-
Processing of Iron Ore Using Methane-Containing GasBy O Ostrovski
Iron ore reduction and iron cementation by CH4-H2-Ar gas was investigated in a laboratory isothermal fixed bed reactor. Iron ore was first reduced to metallic iron by hydrogen, then carburised to ceme
Jan 1, 2000
-
Long-Term Evaluation of Diesel Particulate Filter Systems at IncoÆs Stobie MineBy A D. Bugarski, B R. Conard, G H. Sc
The objective, of the Diesel Emissions Evaluation Program (DEEP)-sponsored project at IncoÆs Stobie mine, was to conduct a long-term field evaluation of selected diesel particulate filter (DPF) system
Jan 1, 2005
-
The Role of Australian Stock Exchange Limited in Enhancing Reporting StandardsTimely disclosure of information germane to the taking of investment decisions makes an essential contribution to ensuring the growth, efficiency and integrity of our capital markets. It is a core con
Jan 1, 2002