Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantification of Mine-Related Effects on Streamflows

    By W Boughton, L Gilbert

    The Australian Water Balance Model (AWBM) has found widespread use in Australia in estimating the streamflow behaviour of catchments. It has been used at the Ridgeway Gold Mine, in central west New So

    Jan 1, 2006

  • AUSIMM
    Methane Drainage Under the No. 7 Longwall Block Appin Colliery

    By Regan R

    Appin Colliery mines the Bulli Seam with a gas composition of 98.5% methane and 1.5% carbon dioxide. Relaxation of the strata generally occurs to below the base of the Wongawilli Seam, some 40 m be

    Jan 1, 1982

  • AUSIMM
    Trackless Mining - the Western Deeps

    By Dierling D. H

    The paper briefly describes the mining system employed on Western Deep Levels for the past 20 years. The negative aspects which gave rise to a new mechanized method of mining are discussed. The se

    Jan 1, 1986

  • AUSIMM
    Development Of Open Stope Drilling Methods At The Selcast Mine, W. A.

    This paper looks at the various stages of development of open stope drilling techniques. Due to the structural nature of the orebodies mined by open stoping it has been necessary to review mining

    Jan 1, 1977

  • AUSIMM
    An Accountant's Overview of Mineral Valuation Methodologies

    Valuers of mineral properties should be aware that accountants are a major user of their opinions of value. Reliance by accountants can range from obtaining comfort that book values in balance shee

    Jan 1, 1994

  • AUSIMM
    Process Requirements for the Direct Condensation of Both Zinc and Lead as Metals in the Polymetallic Smelting of Zn-Pb-Cu Sulphides

    By Warner N. A

    There is an inherent problem in producing simultaneously lead, zinc and copper as metals in a single polymetallic smelting furnace. It relates to the condensation of lead and zinc from the gas phas

    Jan 1, 1989

  • AUSIMM
    Successful Mining Company Management

    Companies involved in the mining industry are exposed to risks, referred to as corporate risks, as part of the business process. Directors and management should be aware of these risks and make approp

    Jan 1, 1990

  • AUSIMM
    Ants as Indicators of Restoration Success Following Mining in Northern Australia

    Mine site restoration, involving the re-establishment of original ecosystems, is a far greater challenge than revegetation, which simply aims to stabilise the site and to give it a green appearance.

    Jan 1, 1994

  • AUSIMM
    Towards Excellence in Water Management Within Rio Tinto

    The paper sets out the context for water and the challenges that have to be faced in the battle to alleviate global poverty. It acknowledges that the world has been blessed with abundant water but bec

    Jan 1, 2003

  • AUSIMM
    1.3 Million Tonnes Blast In T33-34 Stope At Mount Isa Mines Limited

    The T33-34 blast, the first major blast at Mount Isa Mines, broke 1,360,000 tonnes of copper ore using 349 tonnes of explosives. The original concept of firing T33, T34, T35 and U37 separately was

    Jan 1, 1977

  • AUSIMM
    Sulphides In Underground Mine Filling Operations

    The scope, pace and depth of mining is creating a need for improved ground control strategies to meet mine safety standards. Ground control and associated conservation problems relating to subsiden

    Jan 1, 1973

  • AUSIMM
    Project Financing of Australian Resources

    The classic description of Project Finance as "the reliance by lenders on the cashflow of a project, supported by the assets of the project with no recourse to the project sponsor's corporate

    Jan 1, 1987

  • AUSIMM
    Electronic Accuracy Achieved With Non-Electric Initiation

    By S Tavelli

    This discussion will present a case study in developing solutions to a metropolitan quarryÆs public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004

  • AUSIMM
    CABS-A User-Oriented Costs and Budget System with Particular Emphasis on Responsibility Accounting

    CABS - Costs and Budget System - is being developed to provide more appropriate tools to assist cost control. The most important of these tools is responsibility accounting, that is to ensure the r

    Jan 1, 1977

  • AUSIMM
    Protection and the Mining Industry

    In planning and operating mining projects, managers must take into account economic conditions in foreign markets in addition to Australian conditions. As the manager has little influence over the

    Jan 1, 1980

  • AUSIMM
    Design Risk Management at Mt Leyshon Gold Mine

    The Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet

    Jan 1, 1994

  • AUSIMM
    An Overview of the Telfer 10 Mtpa Dump Leach Operation

    By Mitchell I, Gelfi P, Dunne R, Pyper R

    Dump leaching at Teller in its present form began in the fourth quarter of 1988 as an adjunct to milling operations. Initial plans called for a dedicated dump leach facility capable of processing o

    Jan 1, 1994

  • AUSIMM
    ‘Forget the Wet Chemistry’ – How the Australian Synchrotron Can Help with Tailings and Mine Waste Management

    By P Kappen, R N. Collins, K M. Spiers

    X-ray absorption spectroscopy (XAS) is a synchrotron-only technique used to determine chemical speciation, providing a powerful alternative to most traditional ‘wet chemistry’ and lab-based speciation

    Jul 27, 2015

  • AUSIMM
    The Use of the Geographical Information Systems (GIS)-Based Weights-of-Evidence Method for Assessing Mining Induced Rockfall

    By E Baafi, G Brassington

    Coal mining operations can impact on various types of surface infrastructure or natural features, including cliff-lines, steep slopes and natural watercourses. Longwall mining leads to a subsidence de

    Jan 1, 2006

  • AUSIMM
    A Proposal for Standard Reference Material Recertification

    Largely inherited from the past and from strictly internal laboratory use, the certification of reference material using round-robin assaying is often insufficient for the use made today for external

    Jan 1, 2008