Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The New Minerals Legislation in New Zealand (fe42a913-b6a0-4303-a2e1-c746cc11695a)

    This paper describes the new legislative regime that will apply to the regulation of the minerals industry in New Zealand.The reform of New Zealands minerals legislation was initiated in January 1988

    Jan 1, 1990

  • AUSIMM
    Mine Evaluation-Myth and Reality

    The word "mine" means different things to different people. To a professional in the mining industry, it may mean trucks and shovels, overburden dumps, headframes, mill buildings, and the other c

    Jan 1, 1982

  • AUSIMM
    Increased Profits Through Mine-and-Mill Integration

    By P D. Munro

    The Mine to Mill concept, as it has become known, is a philosophy which is being increasingly embraced by mining companies committed to increasing their profitability through better integration and gl

    Jan 1, 2000

  • AUSIMM
    Operational Research Techniques in Mining

    The use of operational research in mining is illustrated by simple examples of the techniques of simulation, linear programming, theory of sampling, and experimental design.Statistical simulation of t

    Jan 1, 1962

  • AUSIMM
    A Method of Preparing Titanium Trichloride

    Titanium tetrachloride may be reduced to trichloride with hydrogen on a hot tungsten filament and other hot: surfaces. The effect of temperature, time and size of t.he filament on the rate of reaction

    Jan 1, 1956

  • AUSIMM
    Notes on Mine Surveying at Mount Isa

    In order to maintain an accurate survey underground, it is first necessary to connect all shafts used for the transferring of the survey to the levels below by a precise surface survey.This has been a

    Jan 1, 1953

  • AUSIMM
    Management of the Flow and Processing of Mining Waste Streams

    By P J. Scales, D Boger

    Technological advancements in mineral processing have increased the feasibility of refining low-grade ores. Because of this progression and continual depletion of high-grade ore deposits, much larger

    Jan 1, 2002

  • AUSIMM
    Development in Elevated Temperature Ground of the 500 Orebody Mount Isa Mines

    By T Davis

    The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si

    Jan 1, 2008

  • AUSIMM
    Zinc Flotation at Roseberry - Complex but Not Difficult

    From 1980 to February 1991 the Rosebery concentrator purchased ore from Aberfoyle's Que River Mine. Following the termination of the contract the concentrator reverted to treating Rosebery ore

    Jan 1, 1993

  • AUSIMM
    Soft sensors for advanced process monitoring and control of comminution circuits

    By M Hilden, G Forbes, Z Ye, M Yahyaei, F Reyes, V Jokovic

    Soft sensors offer several practical advantages for the process control of comminution circuits by combining multiple conventional sensors and other data sources with real-time analysis using mechanis

    Aug 24, 2022

  • AUSIMM
    Effects of Ventilation Leakage in Deep, Hot Room and Pillar Operations

    By S Bluhm, R Funnell

    Creative mine-designs are constantly being applied in the deep platinum mining industry in South Africa. Recently, this has resulted in deep hot mine-designs including room and pillar, bord and pillar

    Jan 1, 2005

  • AUSIMM
    Towards grade engineering using X-ray microtomography

    By K Barbosa, G Wilkie, F Reyes, V Jokovic, C Evans

    The idea behind Grade Engineering is to exploit the natural heterogeneity of an orebody (spatial, temporal) in order to divert low-value waste out of the mining value chain. Essentially, this involves

    Aug 24, 2022

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • AUSIMM
    Flotation Characterisation of Iron Ores

    By Hinkley JT, Smitham JB, Nicol SK

    Historical investigations of mineral flotation have highlighted the many factors which affect flotation. Some of these are related to the mineral, its degree of liberation (however defined), solutio

    Jan 1, 1993

  • AUSIMM
    Improving Roadway Development in Underground Coal Mines

    By G Gibson

    Realising that current roadway development performance levels were unlikely to sustain new generation high-capacity (15 Mt/a) longwall mines then being planned, the Australian Coal Association Researc

    Jan 1, 2008

  • AUSIMM
    Assessment of Options for Economic Processing of Preg-Robbing Gold Ores

    By K Buda, W Staunton, M Hill, V Tjandrawan

    One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie

    Jan 1, 2007

  • AUSIMM
    Milling at Great Western Consolidated No Liability, Bullfinch, W.A.

    By Howard G. L

    The gold treatment plant of Great Western Consolidated N.L. is at Bullfinch, Western Australia, 22 miles north of Southern Cross, which is 100 miles west of Kalgoorlie. A railway to Southern Cross con

    Jan 1, 1956

  • AUSIMM
    Mining Methods at Mount Lyell

    THE millng methods employed in the Mount Lyell Mining and Railway Company's mines are, perhaps, less known to the milling world than those of other important districts, due to the geographical re

    Jan 1, 1915

  • AUSIMM
    Sublevel Shrinkage – the Mt Wright Story

    By S Long, A J Koen, D MacKay

    The Mt Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Following the evol

    Mar 24, 2014

  • AUSIMM
    Production improvement opportunities in comminution circuits

    By M Yahyaei, M S. Powell

    Mineral processing plants have become large and complex, generally through progressive expansions. Addition of a pre-crushing stage to conventional Semi-Autogenous-Grinding (SAG) and ball mill - crush

    Aug 29, 2018