Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Relationship Between Mapped Rock Units And The Stratigraphic Subdivision Of The Willyama Supergroup In Key Areas Of The Broken Hill Block

    By Willis I. L, Stevens B. P J, Stroud W. J

    The Early Proterozoic metamorphic rocks of the Broken Hill (BH) Block have been recently subdivided into sixteen formations and four groups (Willis et al., 1983b, Stevens et al., 1983). This strat

    Jan 1, 1983

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Water Management at BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no

    Jan 1, 2006

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and Variability

    By S Rogers, D Stead, E Eberhardt

    The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus

    May 9, 2016

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    Guidelines for Selecting Pellet Plant Technology

    By J Bolen, I Cameron, M Huerta, M Okrutny, K O’Leary

    As greater amounts of fine iron ore concentrates enter the marketplace, new investments in iron ore pelletising capacity are inevitable to deliver these concentrates to steel industry consumers. When

    Jul 13, 2015

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia

    By D J. Brake

    Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi

    Mar 21, 2011

  • AUSIMM
    Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn deposit

    By C Artica

    Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st

    May 24, 2023

  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Ultrafine Particles in Flotation

    Particles finer than 10 um often cause problems in flotation. The current under- standing of the nature of the following effects is discussed: slime coatings on particles, carrier flotation, increa

    Jan 1, 1984

  • AUSIMM
    Computational Modelling Studies of Ventilation Management for Underground In-seam Drilling Sites

    By F Hungerford, T Ren

    "Gas management has always been a major concern for the ventilation officer of any gassy mine. With an increase of mining depth and gas content, there is a great demand for the development of in-seam

    Aug 31, 2015

  • AUSIMM
    Example of a Dynamic Flotation Framework

    Froth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive

    Jan 1, 2005

  • AUSIMM
    Globally Optimising Open Pit and Underground Mining Operations under Geological Uncertainty

    By R Dimitrakopoulos, K Kawahata, L Montiel

    A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci

    Nov 24, 2014

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005