Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Relationship Between Mapped Rock Units And The Stratigraphic Subdivision Of The Willyama Supergroup In Key Areas Of The Broken Hill BlockBy Willis I. L, Stevens B. P J, Stroud W. J
The Early Proterozoic metamorphic rocks of the Broken Hill (BH) Block have been recently subdivided into sixteen formations and four groups (Willis et al., 1983b, Stevens et al., 1983). This strat
Jan 1, 1983
-
Mining Reconciliation in Long Hole Open Stopes at George Fisher MineBy J J. Grobler
The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified
Mar 21, 2011
-
Water Management at BHP Billiton Olympic DamBHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no
Jan 1, 2006
-
Goafstream Sampling and the BarometerBy M Brady
"It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h
Jun 1, 2012
-
Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and VariabilityBy S Rogers, D Stead, E Eberhardt
The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus
May 9, 2016
-
Automated Drilling Features for Improving Productivity and Reducing Costs in Underground DevelopmentBy J Välivaara
The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines
May 9, 2016
-
South-west Ventilation Shaft Project at Newstan MineBy D Piason
Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of
Aug 31, 2015
-
Guidelines for Selecting Pellet Plant TechnologyBy J Bolen, I Cameron, M Huerta, M Okrutny, K O’Leary
As greater amounts of fine iron ore concentrates enter the marketplace, new investments in iron ore pelletising capacity are inevitable to deliver these concentrates to steel industry consumers. When
Jul 13, 2015
-
Sensible Cost Cutting for Resource ProjectsBy D Connelly
As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c
Aug 8, 2011
-
Mathematical Approach for Better Mine Waste Rock Dumping ManagementBy Y Li, D J. Williams, E Topal
A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction
Jul 10, 2012
-
Modelling metal recovery by co-kriging the feed and concentrate masses of metalBy P Dowd, A Adeli, C Xu, X Emery
Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining
May 24, 2023
-
Mine Road Design and Management in Autonomous Hauling Operations – A Research RoadmapBy R J. Thompson
In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product
Nov 22, 2011
-
The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, IndonesiaBy D J. Brake
Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi
Mar 21, 2011
-
Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn depositBy C Artica
Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st
May 24, 2023
-
Flotation control using froth stability: past, present and futureBy C Smith, J Cilliers, K Hadler
Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be
Aug 29, 2018
-
Ultrafine Particles in FlotationParticles finer than 10 um often cause problems in flotation. The current under- standing of the nature of the following effects is discussed: slime coatings on particles, carrier flotation, increa
Jan 1, 1984
-
Computational Modelling Studies of Ventilation Management for Underground In-seam Drilling SitesBy F Hungerford, T Ren
"Gas management has always been a major concern for the ventilation officer of any gassy mine. With an increase of mining depth and gas content, there is a great demand for the development of in-seam
Aug 31, 2015
-
Example of a Dynamic Flotation FrameworkFroth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive
Jan 1, 2005
-
Globally Optimising Open Pit and Underground Mining Operations under Geological UncertaintyBy R Dimitrakopoulos, K Kawahata, L Montiel
A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci
Nov 24, 2014
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005