Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide DepositBy R Knight
The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos
Sep 5, 2011
-
Optimising Western Australia Magnetite Circuit DesignBy D David
The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po
Aug 8, 2011
-
Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau MineBy G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic
The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t
Sep 1, 2014
-
Advanced Grinding Mill Relining MethodsRME has a vision for a new mill operational paradigm made possible by RMEÆs fast, safe Mill Relining System. This vision can be moved forward into reality at any time with or without guidance from rec
Jan 1, 2006
-
Airborne Gravity Gradiometry and Magnetics in the Search for Economic Iron Ore DepositsBy R Miller
The enrichment of magnetite to haematite and haematite-goethite leads to a coincident magnetic low and gravity high within the banded iron formation. Palaeochannel deposits of pisolitic limonite can b
Jul 11, 2011
-
Prediction of Burden at the Sungun Copper Mine by Artificial Neural NetworkBy H Khoshrou, A Siamaki
Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b
Sep 26, 2011
-
Comparison of Experiment and Simulation of Blast Loading on the Steel BeamBy A Hosseinzadeh Barforoosh, A Abedi, M Taji
The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t
Aug 24, 2015
-
Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracyBy D Reid, J McKibben, M Noppe
International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo
Mar 22, 2022
-
Is the Python Right for Me? PythonGekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr
Aug 1, 2010
-
Redefining Competent Persons Criteria for Resource GeologistsBy J Coombes
There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an
Aug 18, 2014
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage OperationsBy R Thompson, D Tulloch
"Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and
Nov 15, 2016
-
Design of Equipment for Dynamic Burden MeasurementsBy D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer
The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa
Aug 24, 2015
-
Deck hands needed! Experience necessary – addressing the impending qualified tailings professional resource shortageBy K J. Ward, C N. Hatton, J Scalia IV, C A. Bareither, D L. Spencer
The mining industry is experiencing change in the governance of tailings facilities (TFs). Guidance and regulations across many jurisdictions contribute to this amorphous change. The Canadian Dam Asso
Jul 1, 2021
-
Experimental and thermodynamic study of the phase equilibria in the NiO-CaO-FeO-Fe2O3 system in air and in equilibrium with metal (Fe-Ni) alloyBy S Sineva, E Jak, M Shevchenko, D Shishin
This study represents a part of comprehensive research aimed at integrating nickel into a thermodynamic database constantly developed at Pyrosearch. The behaviour of Ni in calcium-ferrite slags is con
Aug 21, 2024
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
Modelling Blast Movement for Grade ControlBy O Handayani, R Barr, E Isaaks
The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los
Aug 18, 2014
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground SupportBy V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditingBy M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017