Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Some New Concepts in Dry Beneficiation Possibilities for Iron Ores

    By D Henderson, M Germain

    The beneficiation of iron ore deposits to yield haematite and magnetite concentrates for steel making processes typically require the use of one or a combination of wet processing techniques based on

    Jan 1, 2009

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010

  • AUSIMM
    Loading of Au(CN)2 - Solution Onto Activated Carbon

    By Linge HG, Klauber C

    The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined

    Jan 1, 1989

  • AUSIMM
    Modern Mining Geology

    By G Fahey, S Rose

    "Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th

    Aug 18, 2014

  • AUSIMM
    Incorporating Sustainability into Mining Plant and Infrastructure Design

    By A Murphy

    Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They

    Jul 16, 2014

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron Ore

    By A E. Petts

    Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro

    Jul 11, 2011

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013

  • AUSIMM
    Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

    The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti

    Nov 25, 2010

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Global Mining Standards and Guidelines for Determining Comminution Circuit Efficiency

    By A Giblett, M Daniel

    "The Global Mining Standards and Guidelines Group (GMSG) currently supports nine individual industry working groups focused on developing standards and guidelines for the mining industry. In 2013 the

    Oct 10, 2016

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • AUSIMM
    Functional safety and behavioural economics – understanding human error risk in autonomous operations

    By B Patterson, Y Lanwin

    Over the last decade the adoption of autonomous technology has proven its potential to fundamentally alter the mining industry, offering significant improvements in safety and productivity. Automation

    Apr 16, 2024

  • AUSIMM
    Queensland Mines Plant Trials with Caro's Acid

    By Ring R. J, Waters D. J, Vautier F. E, Fulton E. J

    Laboratory leach tests have been carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's acid (permonosulphuric acid) as an alternative oxidant to pyrolusite

    Jan 1, 1983

  • AUSIMM
    Exploration advances – MinEx CRC’s mission

    By D Giles, A C. Bailey

    In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus

    Nov 8, 2021

  • AUSIMM
    Downstream impacts of Grade Engineering and preconcentration

    By J Salaya, J Kwak, L Keeney, S Dehkhoda

    In addition to volatile commodity prices influencing decision making, in recent years, social and environmental performance have become important decision drivers within the mining industry. There are

    Nov 10, 2020

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015