Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Volumetric Reserves And Probability Estimates

    By Stewart W. J

    The volumetric method of estimating hydrocarbon resources and recoverable reserves is and probably will remain a dominant method in petroleum engineering. The method is technically very simple, bu

    Jan 1, 1979

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997

  • AUSIMM
    Geologic Evolution of the Stringer Zone Underlying the Hellyer Volcanogenic Sulphide Deposit. Tasmania

    By Large RR

    Underlying the 15 million tonne, high grade Hellyer volcanogenic massive sulphide deposit of western Tasmania is an extensive, well developed, and well preserved stringer system. Pervasive alteration

    Jan 1, 1990

  • AUSIMM
    A Review of Sublevel Stoping

    A review of the factors controlling stope wall behaviour such as excavation geometry, rockmass strength, induced stress, ground support, blast damage and drill drive layout is undertaken. In addition,

    Jan 1, 2000

  • AUSIMM
    A Fluid Flow Modelling Approach to Gold Exploration in the Hodgkinson Province, Far North Queensland

    By S Corbel, P J. T Donchak, W Gorczyk

    The Hodgkinson Province numerical modelling project aims to develop an improved understanding of the physical conditions that lead to the localisation of goldbearing fluids within known systems and ap

    Jan 1, 2008

  • AUSIMM
    BHP and management standard: a global approach to reducing geochemical risk and minimising closure uncertainties

    By J Heyes, T Cooper, M Stimpfl, R Staines, J P. Pearce

    Acid and Metalliferous Drainage (AMD) is one of the key risks facing the mining industry worldwide. If not properly managed and/or not identified in a timely manner, AMD has the potential to decrease

    Jul 1, 2021

  • AUSIMM
    A Stratigraphy and Tectonic Model for the Drummond Basin and its Relationship to Gold Mineralisation

    The Drummond Basin is a large intracratonic basin which developed in central Queensland during Late Devonian to Early Carboniferous times. It is postulated that the Drummond Basin developed as a f

    Jan 1, 1989

  • AUSIMM
    Interdisciplinary Approach to the Analysis of Acid Mine Drainage at an Underground Lead Zinc Mine

    By Williams RE, Ralston DR

    Acid mine drainage is a serious environmental and economic concern, resulting in regulation of the mining industry and significant water treatment costs. An interdisciplinary approach is needed to a

    Jan 1, 1988

  • AUSIMM
    Application of Geology to Alleviate Sampling Bias During the Evaluation of High-Nugget Gold Systems

    Erratic, though spatially localised occurrences of gold particles are a common feature of high-nugget gold systems. In many cases, gold is present as isolated or clustered, often coarse particles. The

    Mar 1, 2010

  • AUSIMM
    The Lower Chlorides of Titanium: Their Production and Reduction to Titanium Sponge by Electrical Energy

    The reduction of titanium tetrachloride to trichloride can be achieved by employing hydrogen and electric arcs. It is possible to produce melts containing up to 50% TiCk in the eutectic mixture of LiC

    Jan 1, 1956

  • AUSIMM
    The Compilation and Presentation of The Description of Operations with Particular Reference to Cyanide Operations

    The Queensland Department of Mines believes it is in the best interests of the gold mining industry to reduce and control the environmental impacts from gold mining since that is the community expecta

    Jan 1, 1986

  • AUSIMM
    The Penna Hoisting Plant ù Opportunities and Issues Related to Using Lower Rope Selection Factors

    By C Quirion

    Agnico-Eagle Mines Limited, Laronde Division, operates the deepest single-lift shaft in the western hemisphere. The initial Penna hoisting plant was designed for a production rate of 1800 tonnes per d

    Jan 1, 2005

  • AUSIMM
    Mining Over 100 Stopes Per Year? ù The Perilya Broken Hill Approach to Mine Planning

    By C Mroczek, B Mitchell

    Perilya Broken Hill, from its inception, has budgeted for more than 2.0 million tonnes per year from the Southern Operations. This tonnage was planned to come from in excess of 100 stopes per year in

    Jan 1, 2005

  • AUSIMM
    Longhole Pillar Mining at Pasminco Broken Hill Mine with Particular Reference to Driving through Sandfill

    By P Ormsby, T Hewitt

    Ore in pillars constitutes a significant proportion of the ore reserve at PasmincoÆs Broken Hill Mine. Many of these pillars are narrow (5 -6 m) and high (16 û 35 m) vertical blocks. High-grade ore ha

    Jan 1, 1998

  • AUSIMM
    An Optimisation Approach to Maintenance Scheduling for Capacity Alignment in the Hunter Valley Coal Chain

    By H Waterer, L Zheng, T Kalinowski

    The Hunter Valley Coal Chain (HVCC) consists of mining companies, rail operators, rail track owners and terminal operators, together forming the worldÆs largest coal exporting facility. In 2008, the t

    Sep 26, 2011

  • AUSIMM
    Implementation of Blasting to Replace Free Digging in a Fume Prone Environment at Lemington Mine

    By D Stow, M Edmondson

    Lemington coal mine is operating in an environmentally sensitive area in the Hunter Valley, NSW, Australia. Late in 1999 the southern pit was developed using a series of box cut blasts. After the init

    Jan 1, 2001

  • AUSIMM
    Ultramafic Mine Tailings to Treat Acidic Mine Water and Lock Away Carbon through Mineral Carbonation

    By S Bouzalakos, W Timms, H Malli

    Combining ultramafic mine tailings and acidic mine drainage via mineral carbonation to sequester carbon dioxide, presents an opportunity to minimise waste on mine sites. Low pH mine water with trace e

    Jul 27, 2015

  • AUSIMM
    The New Henderson Mine Truck Haulage System - The Last Step to a Totally Trackless Mine

    By D S. Stewart, K W. Keskimaki

    In 1999, the Henderson Mine commissioned the Henderson 2000 project - a new truck haulage level, a new underground crusher and a 24 kilometre conveyor system to replace a 23-year old rail haulage syst

    Jan 1, 2000

  • AUSIMM
    The Pertinence of Flexible Employment Practices to Fatigue Related Workplace Risk in the Mining Industry

    The purpose of this paper is to review recent approaches by regulators, employers and employees and their associations to the introduction of flexible employment practices and the management of fatigu

    Jan 1, 2003

  • AUSIMM
    Sub-Surface Cracks due to Disc Cutter Spacing for Improved Rock Breakage and Ground Control

    By Guo H

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in

    Jan 1, 1992