Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How Details of the Geometallurgical Optimisation Influence Overall Value

    By S Matos Camacho, K G. van den Boogaart, R Tolosana Delgado, U Mueller

    "The precise formulation of a geometallurgical optimisation problem is by necessity a simplification of reality. It includes implicit choices such as data availability or mining block geometry. Additi

    Jun 15, 2016

  • AUSIMM
    Sirosmelt Investigation - An Example of Process Evalutaion Techniques

    By Nilmani M, Malone J, Taylor RN, Floyd JM, Gray NB, Fountain CR

    CSIRO staff and University of Melbourne staff and students collaborated in an intense programme of investigation on the CSIRO 50 kg Sirosmelt pilot plant.In two days of operation copper matte converti

    Jan 1, 1985

  • AUSIMM
    Improved Recovery in Highwall Mining using Backfill ACARP Project C3052

    By G K. Searle

    In Australia, coal mines have generally not adopted filling to increase mining recovery. The aim of this project, entitled æImproved recovery in highwall mining using backfillÆ, was to examine the fea

    Jan 1, 1998

  • AUSIMM
    Optimising Leach Pad Construction Methods for Site Specific Applications

    By Thompson P, Sharma Y

    The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.

    Jan 1, 1994

  • AUSIMM
    Debismuthising of Lead at the Bhas Lead Refinery, Port Pirie

    By Waters CA, Happ JV

    The debismuthising plant, commissioned in 1980, is based on the Kroll-Betterton process for preliminary bismuth removal with subsequent antimony treatment for fine debismuthising. Bullion flowrate is

    Jan 1, 1985

  • AUSIMM
    Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and Blasting

    By D La Rosa, G Power, K Riihioja

    In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and

    Jan 1, 2001

  • AUSIMM
    The Relevance of Good Corporate Governance to Maximising Shareholder Wealth in Mineral Commodity Companies

    By G C. Kiel, G J. Nicholson

    Corporate governance has never been more topical. A glance at any major newspaper or business publication will reveal a litany of corporate failures based upon the governance of the organisations invo

    Jan 1, 2002

  • AUSIMM
    Rehabilitation Of Mining Areas With Particular Reference To The Re-Establishment Of Plant Growth

    Plant growth is likely to prove the most suitable and satisfactory material to stabilise and cover quarry faces and worked-out surface mining sites. The careful selection of plant species is of pa

    Jan 1, 1976

  • AUSIMM
    The Need for Quality Control in Sampling Due to Evaluation Advances at Anglo Platinum

    Anglo Platinum recognised with its expanded operations the need to change its evaluation strategy due to increased sample volumes and the pressure it created at laboratories. The sender/receiver analy

    Jan 1, 2008

  • AUSIMM
    Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotation

    By S Lowjun, I Verster, C A. Thomas, E Forbes, K Runge, G V. Franks

    Fine (<20 µm) valuable mineral particles are difficult to recover in conventional flotation circuits. (Trahar and Warren, 1976; Jameson, Nguyen and Ata, 2007; Kohmuench et al, 2018). This leads to a l

    Aug 24, 2022

  • AUSIMM
    Temperature Monitoring of Hydraulic Fractures Used for Preconditioning Massive Conglomerate Strata to Reduce Windblast

    By B G. Blacka, O Salisbury, K W. Mills, R G. Jeffrey

    Whitehaven Coal Limited operates an underground longwall mine near Narrabri, New South Wales. The mining horizon in the Hoskissons Seam is overlain by a 16–20 m thick unit known as the Digby Conglomer

    Nov 5, 2014

  • AUSIMM
    High-resolution erosion modelling using the RUSLE – an application to open cut coalmine operations

    By C M. Côte, P Bolz, R Chrystal

    The design of final landforms is an integral part of mine closure plans in Queensland and aims to ensure the rehabilitated land is safe, stable and non-polluting. Landform stability in this context is

    Aug 2, 2023

  • AUSIMM
    A Probabilistic Approach to the Design Optimisation of Overburden Slopes at Morwell Open Cut

    By Rieniets S, Somerville J. L

    In Morwell Open Cut brown coal mine, the overburden &apos;firehole&apos; materials which have resulted from ancient coal fires vary-from hard baked clays to firm laminated lacustrine clays. The need

    Jan 1, 1994

  • AUSIMM
    Mineral Exploration in Fiordland 1970 - 1972 with Emphasis on Syngenetic Mineralisation Located to Date

    Since the earliest recorded prospecting of the 1860&apos;s mineral exploration and mining in Fiordland has been discouraged by the formidable physical difficulties presented by its isolation, extremel

    Jan 1, 1977

  • AUSIMM
    From Databases to Visualisation - Data Transfer Standards and Data Structures for 3D Geological Modelling

    By Horowitz F. G, Lamb P

    As mining operations become larger and more complex, larger volumes of geological, geophysical, and production data must be manipulated and interpreted on a day-to-day basis. Because of the large vo

    Jan 1, 1995

  • AUSIMM
    An Analysis of the Geological Factors Leading to Outburst-Prone Conditions at Collinsville, Queensland

    By Rogis J

    The basic parameters causing outbursts are rock pressure, gas characteristics and the physico-mechanical properties of the coal. The three sets of factors are to some degree interdependent. At Colli

    Jan 1, 1980

  • AUSIMM
    Opportunities and Technologies to Reduce the Energy and Water Impacts of Deteriorating Ore Reserves

    While the potential for the discovery of new high grade resources exists, it is almost inevitable that the ore resources used to provide society&apos;s ongoing demand for primary metals will deteriora

    Jun 1, 2010

  • AUSIMM
    Mine Geology Skill Shortages, Churn and Mentoring - Ways to Improve Individual and Team Performance

    By J Bryant

    In recent years the mining industry has suffered from skill shortages in a range of disciplines including mine geology. As a consequence, many businesses operate with incompletely filled organisation

    Jan 1, 2009

  • AUSIMM
    Pellestising of Fine Industrial Solid Wastes: A Contribution to the Protection of the Environment

    By Premur V

    In industry and power production and distribution large quantities of fine wastes are produced. These are above all fly ash and phosphogypsum. Attempts are made to use them as secondary raw material

    Jan 1, 1993

  • AUSIMM
    Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNI

    By R Piper

    The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source

    Jan 1, 2002