Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Status of Mine Water Pollution in South Africa

    This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles

    Jan 1, 2003

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantification

    By J Ashford, Minniakhmetov

    Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir

    Mar 22, 2022

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishment

    By A Densten, C Gimber

    Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in

    Jul 25, 2018

  • AUSIMM
    The Use of a Multiplate Arch on Skates to Gain Access Through a Major Collapse in the Rosebery Mine

    The Pasminco mine at Rosebery in north western Tasmania is a medium sized underground base and precious metals mine. In April 1992 a major wedge failure of approximately 5000 t occurred in the backs o

    Jan 1, 1993

  • AUSIMM
    From errors to uncertainty – a clarification for proper use by the Theory of Sampling

    By F F. Pitard

    Observation from attending many conferences around the world reveals that many people are constantly shifting from the word ‘error’ to the word ‘uncertainty’ without a clear vision of what the subtle

    May 9, 2017

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit Mine

    By N Johansson, D Johansson, A Beyglou, H Schunnesson

    As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto

    Aug 24, 2015

  • AUSIMM
    The Use of Computers to Study the Planning and Control of Coal Preparation Systems

    By Tomlinson R. C

    There are two main aspects of coal preparation to which the operational Research Executive of the National Coal Board has applied computer models. The first is in the planning of preparation plant

    Jan 1, 1977

  • AUSIMM
    External Influences on Electronic Detonator Blasting Systems and how to Protect Against Such Influences

    By R van Wyk

    In today’s mining environment the use of heavy mechanical devices and other high-tech electronic devices like two-way radios, cellular phones and even automated mining systems, form a vital part of th

    Nov 8, 2011

  • AUSIMM
    A Logical Approach to Determination of Density and Porosity Values for Iron Ore Deposits

    The importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are

    Jan 1, 2007

  • AUSIMM
    Pilot Plant Work as an Aid to Process Flow Line Development and Process Choices

    Pilot plant work has played a major role in the process development and design phase of the Iscor Heavy Minerals project. The pilot plant campaigns have been aimed at three process areas, namely prima

    Jan 1, 2001

  • AUSIMM
    Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter Building

    By E Nik, A Manzoori, H Namavari, P Witt

    The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing

    Jan 1, 2004

  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • AUSIMM
    Advances in Mathematical Modelling of Sintering Performance of Iron Ore Fines

    By T Raynlyn, R J. Holmes, J R. Manuel, A Poliakov, L Lu

    The prediction of sintering performance of iron ore fines and the possibility of targeted optimisation of specific sinter properties are very important for both the iron ore industry and related resea

    Jan 1, 2009