Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Gas Suspension Calciner in Relation to Bayer Hydrate Properties

    By Nickelsen J, Theisen KG, Hansen PH

    The use of stationary calciners in the processing of aluminium hydroxide has emphas- ized the importance of Bayer hydrate properties with respect to particle breakdown during calcination and subsequ

    Jan 1, 1981

  • AUSIMM
    A Practical Method of Approach to the Problems of Mineral Flotation

    Response of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le

    Jan 1, 1963

  • AUSIMM
    The Application of Air to the Working Face in Coal Mines

    By Hayes J. A

    The satisfactory ventilation of an extensive coal mine is a subject which requires continual attention from all concerned.It must be remembered that a colliery contains many miles of workings, extendi

    Jan 1, 1947

  • AUSIMM
    The Mina Sertpo Gold Project ù From Drill Core to Production

    By K Nilsson, G Cheong

    Troy Resources NL acquired a 70 per cent interest in the Mina Sertpo gold project in Goißs State, Brazil, in 2001 following a successful bid for the highly competitive international tender of a teneme

    Jan 1, 2004

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    Application of Whittle Four-D to Risk Management in Pit Optimisation

    Nine case studies are presented to illustrate how risks can be, minimised or quantified during pit optimisation, utilising Whittle Four-D software. Each case study covers a specific problem that has

    Jan 1, 1994

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling

    The need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any

    Jan 1, 1973

  • AUSIMM
    Application of Probabilistic Seismic Hazard Analyses to Areas of Low Seismicity

    Probabilistic seismic hazard analyses (PSHA) have now gained wide acceptance in the development of design criteria for major projects. When used with regional criteria the procedures have also allowed

    Jan 1, 1990

  • AUSIMM
    The Use of Controlled Recirculation to Reduce Heating Costs in Canada

    By McHaina D. M, Hardcastle S. G

    A description is given of an investigation into the feasibility of using controlled recirculation of warm exhaust air into the cold intake air of underground mines during winter. Canadian mines ca

    Jan 1, 1988

  • AUSIMM
    Cannington Growth Project û A Partnering Approach to Design and Implementation

    By D Fargher

    BHP BillitonÆs Cannington operation began production in 1997 and is presently the largest tonnage and lowest cost single mine producer of both lead and silver in the world. The original design capacit

    Jan 1, 2004

  • AUSIMM
    Hole to Hole Interaction in Production Blasting at Mount Tom Price

    By McKenzie C. K

    During a programme of explosive performance evaluation at Hamersley Iron, Mount Tom Price Mining Operations, the relative performances of a range of heavy ANFO explosives were compared during normal

    Jan 1, 1990

  • AUSIMM
    The Use of Surface Active Agents to Sensitize An/Fo Mixtures

    The use of ammonium nitrate/fuel oil explosives is.now well established in most open cut mining operations. Its use. is extending to underground mining. This has been due in a large measure to impro

    Jan 1, 1964

  • AUSIMM
    Adding Value to the Saline Waters of the Murray-Darling Basin

    By T E. Norgate

    Salinity in Australia is caused by over irrigation and land clearing for agricultural use over the last 100 years. It is now the biggest threat to the quality of land and water in the Murray Darling B

    Jan 1, 2002

  • AUSIMM
    Implementation of Mine to Mill Blast Optimisation at Porgera Gold Mine

    By S S. Kanchibotla, D La Rosa, R W. Pesch

    The Porgera Joint Venture and Dyno Nobel have commissioned a joint project to optimise the drill and blast operations to increase the overall profitability of the mine. One of the aims of this project

    Jan 1, 2003

  • AUSIMM
    Results of Exploration in Authority to Prospect 57P Surat Basin, Queensland

    Authority to Prospect 57P lies within the Surat Basin',' an eastern lobe of the Great Artesian.Basin, a major Mesozoic . downwarp that,had its inception'in Triassic time. The northern e

    Jan 1, 1962

  • AUSIMM
    Polymer-Based Alternative to Steel Mesh for Coal Mine Strata Reinforcement

    By J Nemcik, E Baafi, I Porter, G Spinks

    Spray-on liners used in the mining industry for ground support and stabilisation applications are either cement based (æshotcreteÆ) or polymer based (æthin spray-on linersÆ). Some thin spray-on liners

    Jan 1, 2008

  • AUSIMM
    Computer Modelling Techniques and their Application to mine Evaluation and Operation

    By Stokes WPC

    The capital requirements to develop a new mining venture are becoming very large; amounts of the order of US$1,000 million are not now unusual among estimates to bring new mining complexes into pr

    Jan 1, 1980

  • AUSIMM
    Paper No. 164. The Stress in Wire Ropes Due to Bending.

    With the progress of modern mining engineering, one of the features of which is the mining from greater depths and the hoisting of greatly increased loads, it becomes a matter of increasing importance

    Jan 1, 1907