Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    OMEN - An Approach to the Optimisation of Methane Drainage Systems

    By Schofield D, Denby B, Stout F, Moli A

    This paper documents the development of a user-friendly computational program, which has been constructed to assist the mine ventilation engineer in the optimal design and operation of methane drain

    Jan 1, 1995

  • AUSIMM
    The Application of Rock Mechanics to Mining at Renison Limited

    During the past 18 months a rock mechanics project has been in operation at Renison Limited. The project was established to identify and investigate key problem areas that would affect future prod

    Jan 1, 1982

  • AUSIMM
    How to Obtain Cost-Effective Continuous High Production from TBMs

    By Jones A

    Today there is a vast amount of information available relative to the performance of tunnel boring machines, and associated systems. The data referred to here consists of project reports, manufacturer

    Jan 1, 1993

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Spoil Pile Instability with Reference to the Goonyella Mine, Queensland

    The characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil

    Jan 1, 1981

  • AUSIMM
    Mining 4.0 initiatives – a pathway to a smarter mining fleet

    By K Rau

    The overall success of a mining operation is directly impacted by the reliability and availability of mining equipment. Heavy-duty vehicles such as excavators and haul trucks are used for conveying of

    Sep 1, 2024

  • AUSIMM
    Applying the Metrics Navigator to Establish Strategic Indicators for Mining

    By D Tanzil, H Jones

    Every mine will close! Charting a profitable course through mine operations to acceptable mine completion requires that risk and opportunity management planning of the mine life begin as early as poss

    Jan 1, 2009

  • AUSIMM
    Integrating Measurement, Systems and Leadership to Build Safe, Productive Cultures

    By M I. Roberts

    As Australia’s mining industry painfully retrenches, mining executives and managers strive to remain viable by seeking significant productivity increases directly through process improvement and indir

    Nov 4, 2015

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016